Requirements at a glance
| Agency | Board of State Examiners of Plumbers and Gas Fitters (Division of Occupational Licensure); exams by PSI |
|---|---|
| License | LP Gas Installer |
| Format | Part 1: 50 questions, 100 minutes; Part 2: 15 questions, 60 minutes, closed book, 70% to pass |
| Fees | $80 PSI exam fee; the license fee in eLIPSE is $52 (journeyman, gas fitter, LP gas installer), $78 (master plumber) or $97 (master gas fitter) |
People who install, connect and move undiluted LP gas salamanders, space heaters and related equipment in buildings under construction in Massachusetts.
Official links
How to get licensed, step by step
Apply to the Board
Apply online through eLIPSE with your apprenticeship hours and education. The Board approves you, then PSI contacts you to schedule.
Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)
Schedule the LP gas installer exam with PSI
Test at a PSI site in Auburn, Boston, Fall River, Lawrence or West Springfield. Cancel at least 2 days ahead or you forfeit the fee.
Schedule with PSI (Massachusetts plumbers and gas fitters) (opens in a new tab)
Pass both parts
Each part is scored separately at 70%. Retake within 12 months of approval; after six failed attempts you must petition the Board in writing.
Schedule with PSI (Massachusetts plumbers and gas fitters) (opens in a new tab)
Get licensed
Pay the license fee in eLIPSE after you pass both parts.
Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)
How to prepare
- Both parts are closed book. Nothing is allowed in the room, so learn the code rules and numbers rather than where to find them.
- The editions are 248 CMR 3.00, 4.00, 5.00 and 11.00 (2021), 10.00 (2023 plumbing code), NFPA 54 (2012) and NFPA 58 (2011).
- The LP gas license covers undiluted LP gas salamanders, space heaters and related equipment in buildings under construction. Part 1 is gas piping, equipment and appliances (30), venting (14) and general regulations (6); Part 2 is gas piping (7) and gas venting (8).
- NFPA 58 (2011) and the 248 CMR 8.00 amendments matter most here.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
248 CMR 3.00 to 11.00: Massachusetts plumbing and gas rulesEssential
Not allowed in the exam room (closed book). The core of both plumbing and gas exams: Uniform State Plumbing Code (10.00, 2023), Fuel Gas Code (4.00 and 5.00, 2021), 6.00, 7.00 and 11.00.
Massachusetts regulations (Cornell LII, free to read) (opens in a new tab)
NFPA 54 (2012) and NFPA 58 (2011)
Not allowed in the exam room (closed book). Model gas codes behind 248 CMR 4.00, 5.00 and 8.00.
MGL Chapter 142: Supervision of Plumbing
Not allowed in the exam room. Licensing, permits and the water heater rules.
Massachusetts General Laws (free to read) (opens in a new tab)
Official reference list (as published by the testing agency)
- 248 CMR 3.00 (2021), 4.00 (2021), 5.00 (2021), 7.00 (2014), 8.00 (2014 amendments to NFPA 58) and 11.00 (2021)
- NFPA 54 National Fuel Gas Code (2012) and NFPA 58 Liquefied Petroleum Gas Code (2011)
- MGL Chapter 142: Supervision of Plumbing, and the general provisions governing plumbing and gas work
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| General Regulations, Inspections, and Permits | 6 | |
| Gas Piping, Equipment, and Appliances | 30 | |
| Venting | 14 | |
| Gas Piping (Part 2) | 7 | |
| Gas Venting (Part 2) | 8 |
Exam day details
- Administered by PSI Services for the Massachusetts Board of State Examiners of Plumbers and Gas Fitters.
- Fee: $80 PSI exam fee (retakes pay again, non-refundable). Board application and the license fee ($52 for LP gas installer) are separate.
- Our practice exam combines the two parts: Part 1 is 50 questions in 100 minutes and Part 2 is 15 questions in 60 minutes (gas piping 7, gas venting 8). Each part needs 70%.
- Closed book and two parts. Each part is scored on its own and you must pass both. Nothing is allowed in the exam room, and a silent non-programmable calculator is the only aid.
- If you fail, retake within 12 months of your application approval date. After six failed attempts you must petition the Board in writing before more attempts.
- The references are 248 CMR 3.00, 4.00, 5.00 and 11.00 (2021), 6.00 (2014 NFPA 58 amendments), 7.00 (2014 large gas equipment), 10.00 (Uniform State Plumbing Code, 2023), NFPA 54 (2012), NFPA 58 (2011), and MGL c.142.
- Apply to the Board through the eLIPSE portal. After you pass both parts, pay the license fee in eLIPSE. Exams are at PSI sites in Auburn, Boston, Fall River, Lawrence and West Springfield.
Frequently asked questions
What is on the LP gas installer exam?
Part 1 has 50 questions: gas piping, equipment and appliances 30, venting 14, and general regulations, inspections and permits 6. Part 2 has 15: gas piping 7 and gas venting 8.
Is it open book?
No. Both parts are closed book.
What does an LP gas installer do?
Installs, connects and moves undiluted LP gas salamanders, space heaters and related equipment in buildings under construction.
Free questions with answers
Show all 10 free questions and answers
A permit for an undiluted LP gas installation was issued on March 1, but no work was started. After how many days from the date of the permit does it become invalid, unless the holder can prove the delay was beyond his or her control?
Answer: 90 days
248 CMR 3.05(1)(e) makes a permit invalid if work is not started within 90 days of the date of the permit, unless the holder satisfactorily proves the failure to start was beyond his or her control. A holder who starts and then will not finish must instead terminate the permit by written notice to the Inspector.
Reference: 248 CMR 3.00 (2021), General Provisions Governing the Conduct of Plumbing and Gas Fitting Work, 248 CMR 3.05(1)(e)
Unless it is designed and installed as an engineered elevated pressure system under 248 CMR 5.05(4)(B), fuel gas piping in Massachusetts must be low pressure, not exceeding which value?
Answer: 0.5 psig (14 inches water column)
248 CMR 4.03(1)(b) replaces the NFPA 54 scope text: all gas piping systems must be low pressure, not in excess of 0.5 psig or 14 inches of water column, unless designed and installed under the elevated pressure rules. Elevated pressure systems need a Massachusetts registered professional engineer's stamped design.
Reference: 248 CMR 4.00 (2021), Massachusetts Fuel Gas Code, 248 CMR 4.03(1)(b)
A propane-fired unit that is not covered by NFPA 85 or NFPA 86 has an input of 600,000 Btu/h in one combustion chamber. Which Massachusetts rule governs the installation of this unit?
Answer: 248 CMR 7.00, Large Gas Utilization Equipment
248 CMR 4.03(5) sends every installation of fuel gas utilization equipment with inputs over 400,000 Btu per hour per combustion chamber, and not governed by NFPA 85 or 86, to 248 CMR 7.00. NFPA 85 is adopted only for boilers of 12,500,000 Btu/h or more and for certain steam generators, so it does not reach a 600,000 Btu/h unit.
Reference: 248 CMR 4.00 (2021), Massachusetts Fuel Gas Code, 248 CMR 4.03(5); 248 CMR 7.01 (definition of Equipment)
Which piping material does the amended NFPA 54 section 5.6.2.7 in 248 CMR 5.05 prohibit for fuel gas piping?
Answer: Galvanized pipe
248 CMR 5.05(7) adds a new section 5.6.2.7 to the Massachusetts version of NFPA 54: galvanized pipe shall not be used. Black steel and wrought iron remain permitted under the base code, and CSST is permitted when installed with the manufacturer-approved fittings and the Massachusetts CSST rules.
Reference: 248 CMR 5.00 (2021), Amendments to NFPA 54, 248 CMR 5.05(7) (5.6.2.7)
A through-the-wall vent terminal for gas equipment is installed 5 feet above finished grade. Under 248 CMR 5.12, at what minimum height above grade must the identification plate be mounted on the building?
Answer: 8 feet
Section 12.9.7, added by 248 CMR 5.12(6), applies whenever a through-the-wall vent is less than seven feet above finished grade. A permanent metal or plastic plate must be mounted at least eight feet above grade directly in line with the vent terminal, reading GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS in letters at least 0.5 inch high.
Reference: 248 CMR 5.00 (2021), Amendments to NFPA 54, 248 CMR 5.12(6) (12.9.7 Signage)
A single chimney flue serves a gas appliance and an oil-fired appliance. If two or more openings enter that flue, how must the openings be arranged under NFPA 54?
Answer: At different levels
NFPA 54 section 12.6.5.2 says appliances sharing a chimney with liquid fuel appliances connect through separate openings, or through a single opening where joined by a suitable fitting as close to the chimney as practical. Where two or more openings enter one flue they must be at different levels, and an automatically controlled gas appliance needs a safety shutoff device.
Reference: NFPA 54 National Fuel Gas Code (2012; wording checked against the 2006 and 2024 editions on file, 2012 text not on file), NFPA 54 section 12.6.5.2, Chimney Serving Appliances Burning Other Fuels
Using Table 5.4.2.3 in 248 CMR 5.05, what is the design demand for 10 domestic gas ranges, each rated 63,000 Btu/h or more, in a multi-family dwelling?
Answer: 233 cubic feet per hour
The diversity table for domestic ranges lists a demand of 233 cfh (38 percent of ratings) for 10 ranges. 243 cfh is the entry for 11 ranges, 408 cfh is the entry for 24 ranges and over, and 630 cfh is the undiversified load (10 x 63). The table applies to domestic ranges only, not to other appliances.
Reference: 248 CMR 5.00 (2021), Amendments to NFPA 54, 248 CMR 5.05(3), Table 5.4.2.3
Two gas pressure switches (high and low) are manifolded together and vented through one steel pipe that runs 150 feet to the outside. Using Table 9.1.19.1 in 248 CMR 5.09, what is the minimum Schedule 40 pipe size?
Answer: 1-1/2 inch
For manifolded high and low gas pressure switches the table gives 3/4 inch for 0 to 40 feet, 1 inch for 0 to 100 feet and 1-1/2 inch for 0 to 200 feet. A 150 foot run is in the 0 to 200 foot column, so 1-1/2 inch pipe is the minimum. The 1-1/4 inch size is the main gas pressure regulator vent size for that column, not the switch vent size.
Reference: 248 CMR 5.00 (2021), Amendments to NFPA 54, 248 CMR 5.09(5), Table 9.1.19.1
Two appliances use Type B double-wall vent connectors into a common vent that is 20 feet tall. What is the maximum length of an individual connector from the appliance outlet to the junction with the common vent under NFPA 54?
Answer: 20 feet
NFPA 54 section 12.11 (Length of Vent Connector) limits a Type B double-wall connector to a horizontal length of 100 percent of the chimney or vent height, and for a system serving multiple appliances it limits each individual connector, from the appliance outlet to the junction with the common vent or another connector, to 100 percent of the height: 20 feet. The 75 percent figure (15 feet) is the horizontal limit for single-wall connectors, and 25 or 30 feet would exceed the vent height.
Reference: NFPA 54 National Fuel Gas Code (2012; wording checked against the 2006 and 2024 editions on file, 2012 text not on file), NFPA 54 section 12.11, Vent Connectors for Category I Appliances (length of vent connector)
A single draft hood appliance has a 4 inch diameter round draft hood outlet. Under NFPA 54 chimney sizing, what is the greatest effective area the chimney flue may have?
Answer: 88 square inches
The outlet area is 3.1416 x 4 x 4 / 4 = 12.57 square inches. For one draft hood the flue must be at least that area and not more than seven times it: 7 x 12.57 = 88 square inches. 12.6 is the minimum, 28 is seven times the diameter rather than the area, and 176 doubles the allowed limit. Massachusetts uses the same seven times limit for reused chimneys.
Reference: NFPA 54 National Fuel Gas Code (2012; wording checked against the 2006 and 2024 editions on file, 2012 text not on file), NFPA 54 section 12.6.3, Size of Chimneys; 248 CMR 5.12(3)(c)
Sources
- PSI: Massachusetts Plumbers and Gas Fitters Candidate Information Bulletin (10/3/2025) (opens in a new tab)
- Massachusetts Board of State Examiners of Plumbers and Gas Fitters (opens in a new tab)
- 248 CMR (Plumbers and Gas Fitters), Cornell LII (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.