Maryland licensing exam

Maryland Restricted Refrigeration Exam (Master and Journeyman): Practice Test & Licensing Guide

The PSI exam for the Maryland master restricted and journeyman restricted refrigeration licenses: 50 questions on electrical controls, piping, refrigeration and air conditioning, and safety. Open book, 70% to pass.

Questions
50
Time limit
2 hours
Passing score
70%
Books
Open book

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Electrical Knowledge, Motors, and Controls

A three-phase, 208-volt compressor motor draws 18 amperes at a power factor of 0.85. About how many kilowatts of real power does it use? (Use 1.732 for the square root of 3.)

Requirements at a glance

AgencyMaryland State Board of HVACR Contractors; exam by PSI
ExperienceMaster restricted: licensed and regularly employed as a journeyman, limited contractor or master restricted contractor for at least 3 years with at least 1,875 hours of HVACR work (or 6 years of documented experience). Journeyman restricted: a Maryland apprentice license for at least 3 years with 1,875 hours of training, or an approved apprentice program.
Exam50 questions, 2 hours, 70% to pass (master and journeyman restricted share one outline)
Books allowed2012 or 2018 IMC, Modern Refrigeration and Air Conditioning (19th to 21st edition), Stoecker Industrial Refrigeration Handbook (1998) and 29 CFR 1926
Fees$50 to PSI, plus Board application and license fees

HVACR workers applying for a Maryland master restricted or journeyman restricted license in the refrigeration specialty from the State Board of HVACR Contractors.

How to get licensed, step by step

  1. Confirm you qualify

    Master restricted: licensed and regularly employed as a journeyman, limited contractor or master restricted contractor for at least 3 years with at least 1,875 hours of HVACR work (or 6 years of documented experience). Journeyman restricted: a Maryland apprentice license for at least 3 years with 1,875 hours of training, or an approved apprentice program.

    Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)Maryland Code (General Assembly) (opens in a new tab)

  2. Apply through PSI

    Submit the exam application online at the PSI site below (mailed or faxed applications are returned). PSI and the Board review your documents, then email you how to pay and schedule.

    Schedule with PSI (HVACR contractors) (opens in a new tab)

  3. Pass the open-book exam

    Exam fees are non-refundable and non-transferable. Exam fees are valid for 90 days, and you may not test more often than every 30 days.

    Schedule with PSI (HVACR contractors) (opens in a new tab)

  4. Apply for the license

    After you pass, the Board sends you the license application. Pay the license fee and file any required insurance.

    Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)

How to prepare

  • Tab your books before exam day: permanent plastic tabs (Avery Swift or Redi-Tag), highlighting and underlining are allowed; Post-It flags and writing in the book are not.
  • Electrical (15), piping (15) and refrigeration (15) are equal shares; safety is 5.
  • The practice bank does not quote Modern Refrigeration, Manual J, Stoecker, NAIMA or SMACNA (copyrighted); use those books in your tabs for the matching topics.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

    Official reference list (as published by the testing agency)
    • International Mechanical Code (IMC), 2012 or 2018 edition (allowed in the exam room)
    • Modern Refrigeration and Air Conditioning, 19th, 20th or 21st edition, Goodheart-Willcox (allowed in the exam room)
    • Industrial Refrigeration Handbook, Stoecker, 1998 edition (allowed in the exam room)
    • 29 CFR Part 1926 (OSHA construction standards), with latest amendments, or the PSI selections (allowed in the exam room)

    What's on the exam

    Official content outline from PSI Services (number of questions per topic):

    TopicQuestions
    Electrical Knowledge, Motors, and Controls15
    Piping15
    Refrigeration and Air Conditioning15
    Safety5

    Exam day details

    • Administered by PSI Services for the Maryland State Board of HVACR Contractors.
    • Fee: $50 to PSI per exam. Board application and license fees are separate.
    • 50 questions in 2 hours; 35 correct (70%) to pass. The master restricted and journeyman restricted refrigeration exams use the same outline.
    • The master restricted and journeyman restricted exams in each specialty share one content outline, so this page covers both levels.
    • Master restricted eligibility: licensed by the Board and regularly employed as a journeyman, limited contractor or master restricted contractor (any specialty) for at least 3 years, under a master contractor or a master restricted contractor in the same specialty, with at least 1,875 hours of HVACR work. Others may apply with 6 years of documented HVACR experience.
    • Journeyman restricted eligibility: a Maryland HVACR apprentice license for at least 3 years with at least 1,875 hours of training under a licensed contractor (or a master restricted contractor in the same category), or a Board-approved apprentice program or approved coursework combination. Others may apply to the Board with documented experience.
    • Open book: you may bring only the listed references (none are provided), which you may index, highlight and underline but not write in. Study guides are not allowed.
    • Exam fees are valid for 90 days and for one examination only; they are not refundable or transferable.
    • You may not take an HVACR exam more often than every 30 days.
    • Master, master restricted and limited contractors who own the business or pull permits must carry $300,000 personal liability and $100,000 property damage insurance ($400,000 combined per occurrence).
    • About the practice questions: they are written from the IMC, 29 CFR 1926 and the Maryland HVACR statute and regulations. Modern Refrigeration and Air Conditioning, Manual J, Stoecker, NAIMA and SMACNA are copyrighted, so they are not quoted in the bank; open those books for the matching topics.

    Frequently asked questions

    What's on the Maryland restricted refrigeration exam?

    50 questions: electrical knowledge, motors and controls 15, piping 15, refrigeration and air conditioning 15 and safety 5.

    Is the Stoecker handbook in the practice questions?

    No. It is copyrighted, so the practice bank does not quote it. Bring it to the exam as an allowed reference.

    Free questions with answers

    Show all 10 free questions and answers
    1. A three-phase, 208-volt compressor motor draws 18 amperes at a power factor of 0.85. About how many kilowatts of real power does it use? (Use 1.732 for the square root of 3.)

      Answer: 5.5 kW

      Three-phase real power is P = 1.732 x E x I x PF = 1.732 x 208 x 18 x 0.85 = 5,512 W, or about 5.5 kW. Leaving out the 1.732 gives 3.2 kW, leaving out the power factor gives 6.5 kW (apparent power), and dividing by the power factor instead of multiplying gives 7.6 kW.

      Reference: DOE Fundamentals Handbook, Electrical Science, Vol. 3 (DOE-HDBK-1011/3-92), Module 9, AC Power: Power Factor and Three-Phase Systems

    2. On a walk-in freezer, a defrost cycle normally clears the coil in about 18 minutes. Following the guideline for setting the fail-safe time on the defrost control, about what fail-safe time should be set?

      Answer: 24 minutes

      The guideline is to set the fail-safe roughly one-third longer than a typical defrost takes to clear the coil: 18 + (18 / 3) = 24 minutes. The fail-safe is only a backup that ends a defrost if the termination control fails, so it should not be far longer than the normal defrost (27 or 36 minutes would let a failed termination control overheat the box) and should not be so close to it that the timer cuts off normal defrosts (19 minutes).

      Reference: Contracting Business, "Defrosting Refrigeration Systems: Keep it Short and Sweet" (J. Jones, Feb. 1, 2006), How Long Should the Defrost Cycle Last? (fail-safe time)

    3. In a low-temperature walk-in, the defrost termination / fan delay thermostat keeps the evaporator fans off for a short time after the heaters are de-energized. What is the main purpose of that fan delay?

      Answer: To keep water left on the coil from being blown into the box and freezing on product, shelves and floor

      Both sources explain the fan delay the same way: after defrost, some water still clings to the coil, and fans started too soon blow it onto the product, shelves and floor, where it freezes. Parker notes that many people mistakenly think the delay is only to keep heat from the coil out of the box. It has nothing to do with head pressure or resetting the timer.

      Reference: ACHR News, "Refrigeration Defrost Control" (H. Parker, July 13, 2009), Defrost Termination-Fan Delay Stat; also CB, How Much Evaporator Fan Delay Is Needed?

    4. Under the IMC, field-erected refrigerant piping made of copper tube must use which type of tube?

      Answer: Seamless Type ACR copper tube

      IMC 1107.5.3 requires copper tube used for refrigerant piping erected on the premises to be seamless Type ACR (hard or annealed) made to ASTM B280 or B819. Water tube and DWV tube are not made for refrigerant service.

      Reference: 2018 International Mechanical Code (Maryland Mechanical Code 2018, adopted without amendments), Section 1107.5.3 Copper Tube

    5. Under IMC 1107.2, in which location may refrigerant piping NOT be placed?

      Answer: In an interior exit stairway

      IMC 1107.2 forbids refrigerant piping in fire-resistance-rated exit access corridors, interior exit stairways and ramps, exit passageways, and elevator, dumbwaiter or other shafts containing a moving object. Piping across an open passageway is allowed at least 7 ft 3 in above the floor or tight against the ceiling, and piping in concrete floors goes in pipe ducts (1107.2.1).

      Reference: 2018 International Mechanical Code (Maryland Mechanical Code 2018, adopted without amendments), Section 1107.2 Piping Location

    6. A technician hears a loud metallic clatter and sees heavy vibration at the compressor right after a walk-in freezer starts after a defrost. Which condition does this indicate?

      Answer: Liquid slugging through the suction and discharge valves

      Copeland describes liquid slugging as the passage of liquid refrigerant through the compressor suction and discharge valves, evidenced by a loud metallic clatter and possibly extreme vibration. It frequently occurs on start-up after liquid has migrated to the crankcase or collected in the suction line or evaporator, and can break valves, rods or crankshafts.

      Reference: Copeland Refrigeration Manual, Part 4: System Design (2024), Section 22, Liquid Refrigerant Control: Liquid Refrigerant Slugging

    7. Per Copeland, what happens when a thermostatic expansion valve is adjusted to too high a superheat?

      Answer: The evaporator is starved and oil return suffers

      Copeland states that too high a superheat setting starves the evaporator and gives poor oil return, while too low a setting lets liquid floodback reach the compressor. Valve superheat should normally be factory preset, and an adjustment, if needed, should be to a modest superheat at the evaporator rather than a large one.

      Reference: Copeland Refrigeration Manual, Part 4: System Design (2024), Section 20, Transport Refrigeration: Thermostatic Expansion Valves

    8. A large R-404A leak occurs in a walk-in freezer's machine pit below floor level. What does the manufacturer's safety data sheet say about the vapor and about re-entry?

      Answer: Heavier than air and can suffocate; stay out until air tests at 19.5 percent oxygen or more

      The R-404A SDS classes it as a simple asphyxiant: vapors are heavier than air, can accumulate in low areas and cause suffocation by reducing oxygen. Unprotected persons should stay away until the air has been tested and the oxygen content is at least 19.5 percent. Being nonflammable does not make it safe to breathe at high concentration.

      Reference: Honeywell Genetron 404A (R-404A) Safety Data Sheet, version 2.6 (rev. 06/04/2014), Section 2 Hazards Identification; Section 6 Accidental Release Measures

    9. A K cylinder of dry nitrogen at 70 degrees F can be under what pressure, according to Copeland, and what must be in the line when it is used to test a refrigeration system?

      Answer: 2,200 psig or more; a regulator and a relief valve

      Copeland says dry nitrogen in a K cylinder at 70 degrees F may be at 2,200 psig or more, and carbon dioxide at over 830 psig. High-pressure compressed gas must never be used in a refrigeration system without a reliable pressure regulator and pressure relief valve in the line, and leak test pressure should be kept to no more than 175 psig.

      Reference: Copeland Refrigeration Manual, Part 5: Installation and Service (2024), Safe Handling of Compressed Gases: Recommended Test Pressures

    10. A cold suction line in a walk-in cooler sweats heavily and drips onto electrical equipment below. What does IMC 1107.4 require?

      Answer: Protect the piping in an approved manner to prevent condensation damage

      IMC 1107.4 requires refrigerating piping and fittings, and brine piping and fittings, that reach a surface temperature below the dew point of the surrounding air during normal operation and are located where condensation would be a hazard to occupants, structure, electrical equipment or other equipment, to be protected in an approved manner (insulation with a vapor barrier is the usual method).

      Reference: 2018 International Mechanical Code (Maryland Mechanical Code 2018, adopted without amendments), Section 1107.4 Condensation

    Sources

    Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.