Requirements at a glance
| Agency | Maryland State Board of HVACR Contractors; exam by PSI |
|---|---|
| Experience | Licensed as a Maryland journeyman for at least 2 years, regularly employed under a licensed contractor, with at least 1,000 hours of HVACR work. Others must document 5 years of qualifying experience. A limited contractor may only maintain or repair systems. |
| Exam | 50 questions, 2 hours, 70% to pass |
| Books allowed | 2012 or 2018 IMC, Modern Refrigeration and Air Conditioning (19th to 21st edition), Manual J (8th edition) and 29 CFR 1926 |
| Fees | $150 to PSI, plus Board application and license fees; $300,000 liability and $100,000 property damage insurance if you own the business or pull permits |
Maryland HVACR journeymen applying for a limited contractor license from the State Board of HVACR Contractors. A limited contractor may maintain or repair HVACR systems but may not do installations or retrofits.
Official links
How to get licensed, step by step
Confirm you qualify
Licensed as a Maryland journeyman for at least 2 years, regularly employed under a licensed contractor, with at least 1,000 hours of HVACR work. Others must document 5 years of qualifying experience. A limited contractor may only maintain or repair systems.
Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)Maryland Code (General Assembly) (opens in a new tab)
Apply through PSI
Submit the exam application online at the PSI site below (mailed or faxed applications are returned). PSI and the Board review your documents, then email you how to pay and schedule.
Pass the open-book exam
Exam fees are non-refundable and non-transferable. Exam fees are valid for 90 days, and you may not test more often than every 30 days.
Apply for the license
After you pass, the Board sends you the license application. Pay the license fee and file any required insurance.
Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)
How to prepare
- Tab your books before exam day: permanent plastic tabs (Avery Swift or Redi-Tag), highlighting and underlining are allowed; Post-It flags and writing in the book are not.
- Electrical knowledge, motors and controls (15) is the biggest section; refrigeration and air conditioning (10) and heating (10) follow, with piping, air distribution and safety at 5 each.
- The practice bank does not quote Modern Refrigeration, Manual J, Stoecker, NAIMA or SMACNA (copyrighted); use those books in your tabs for the matching topics.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Official reference list (as published by the testing agency)
- International Mechanical Code (IMC), 2012 or 2018 edition (allowed in the exam room)
- Modern Refrigeration and Air Conditioning, 19th, 20th or 21st edition, Goodheart-Willcox (allowed in the exam room)
- Manual J: Residential Load Calculation, 8th edition (2006), ACCA (allowed in the exam room)
- 29 CFR Part 1926 (OSHA construction standards), with latest amendments, or the PSI selections (allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Electrical Knowledge, Motors, and Controls | 15 | |
| Piping | 5 | |
| Refrigeration and Air Conditioning | 10 | |
| Heating Systems | 10 | |
| Air Distribution Systems | 5 | |
| Safety | 5 |
Exam day details
- Administered by PSI Services for the Maryland State Board of HVACR Contractors.
- Fee: $150 to PSI. Board application and license fees are separate.
- 50 questions in 2 hours; 35 correct (70%) to pass.
- Eligibility: licensed as a Maryland journeyman for at least 2 years, regularly employed under a licensed master, master restricted or limited contractor, with at least 1,000 hours of HVACR work before you apply. Others must document 5 years of qualifying HVACR experience.
- A limited contractor may only maintain or repair HVACR systems; installations and retrofits need a master or master restricted license.
- About the practice questions: they are written from the IMC, 29 CFR 1926 and the Maryland HVACR statute and regulations. Modern Refrigeration and Air Conditioning, Manual J, Stoecker, NAIMA and SMACNA are copyrighted, so they are not quoted in the bank; open those books for the matching topics.
- Open book: you may bring only the listed references (none are provided), which you may index, highlight and underline but not write in. Study guides are not allowed.
- Exam fees are valid for 90 days and for one examination only; they are not refundable or transferable.
- You may not take an HVACR exam more often than every 30 days.
- Master, master restricted and limited contractors who own the business or pull permits must carry $300,000 personal liability and $100,000 property damage insurance ($400,000 combined per occurrence).
Frequently asked questions
What's on the Maryland limited HVACR exam?
50 questions: electrical knowledge, motors and controls 15, refrigeration and air conditioning 10, heating systems 10, piping 5, air distribution systems 5 and safety 5.
Can a limited contractor install equipment?
No. The Board limits this license to maintaining and repairing HVACR systems; installations and retrofits are not allowed.
Free questions with answers
Show all 10 free questions and answers
While repairing a hydronic loop, a technician replaces hangers on a horizontal run of 3/4-inch copper tubing. What is the maximum horizontal hanger spacing the IMC allows for copper or copper-alloy tubing?
Answer: 8 feet
IMC Table 305.4 lists copper or copper-alloy tubing at 8 feet horizontal and 10 feet vertical. The 12-foot figure belongs to copper or copper-alloy pipe (not tube) and to steel pipe, which is a common mix-up.
Reference: 2018 International Mechanical Code, Table 305.4
A copper hydronic main is 80 feet long and is installed at 60 degrees F. It will run at 180 degrees F. Copper expands 0.0000094 inch per inch per degree F. About how much does the run lengthen?
Answer: About 1.08 inches
Temperature change = 180 - 60 = 120 F. Length = 80 ft x 12 = 960 in. Expansion = 960 x 0.0000094 x 120 = 1.083 in. Leaving the length in feet gives 80 x 0.0000094 x 120 = 0.09 in; multiplying the correct answer by 12 again gives 13.0 in; using a 100 F rise gives 0.90 in. IMC 1206.9 requires provision for expansion.
Reference: 2018 International Mechanical Code, Section 1206.9
To service an air handler on a mezzanine, a technician leans an extension ladder against the mezzanine edge; the distance along the ladder from its foot to the top support is 20 feet. Under OSHA, about how far out from the support should the ladder's foot be set?
Answer: About 5 feet
1926.1053(b)(5)(i) sets the horizontal distance from the top support to the foot at about one-quarter of the working length: 20 ft / 4 = 5 ft. 2 1/2 feet (one-eighth) makes the ladder too steep and prone to tipping backward; 6 1/2 feet (one-third) and 10 feet (one-half) make it too shallow and prone to sliding out.
Reference: 29 CFR Part 1926 (OSHA Construction Standards), 1926.1053(b)(5)(i)
Two electric heat strips of 20 ohms each and one of 10 ohms are wired in parallel. What is the combined resistance?
Answer: 5 ohms
Parallel: 1/R = 1/20 + 1/20 + 1/10 = 0.05 + 0.05 + 0.10 = 0.20, so R = 5 ohms. Adding them gives 50 ohms (the series answer), and the parallel total must always be below the smallest branch (10 ohms).
Reference: DOE Fundamentals Handbook, Electrical Science (DOE-HDBK-1011/1-92), Module 2, Basic DC Circuit Calculations: Resistance in Parallel
An emergency repair needs a start capacitor, and the technician has only a 40 MFD and a 60 MFD capacitor of the same voltage rating. Wired in series, what total capacitance results?
Answer: 24 MFD
Series capacitance = (C1 x C2) / (C1 + C2) = (40 x 60) / 100 = 24 MFD. Adding them (100 MFD) is the parallel rule, averaging gives 50, and 2,400 is the product before dividing. Copeland recommends series emergency replacements use like voltage and capacitance.
Reference: Copeland Refrigeration Manual Part 2, Refrigeration System Components (2024), Section 10, Starting Equipment and Motor Protectors: Capacitors (series connection)
A technician is called to repair a rooftop unit whose nameplate rates it at 7.5 tons of cooling. How many BTU per hour does that rated capacity represent?
Answer: 90,000 BTU/h
One ton of refrigeration is 12,000 BTU/h, so 7.5 x 12,000 = 90,000 BTU/h. 60,000 BTU/h would be a 5-ton unit, and 144,000 is the BTU needed to melt a ton of ice in a day, not an hourly rate.
Reference: NIST Special Publication 811 (Guide for the Use of the SI), Appendix B.8, ton of refrigeration (12 000 BtuIT/h)
A reciprocating compressor runs but a clamp meter shows amperage well below nameplate with poor cooling and high suction pressure. What does Copeland suggest this may indicate?
Answer: A broken suction reed or a broken connecting rod inside the compressor
With high suction pressure and normal evaporator and condenser operation, amperage near or above nameplate suggests damaged valves or too little capacity for the load, while amperage considerably below nameplate may indicate a broken suction reed or connecting rod.
Reference: Copeland Refrigeration Manual Part 5, Installation and Service (2024), Servicing Copeland Compressors: If the Compressor Runs But Will Not Refrigerate
A technician clocks a natural gas meter with a 1-cubic-foot dial. One revolution of the test dial takes 45 seconds with only the furnace running. Using 1,000 BTU per cubic foot, what is the furnace input?
Answer: 80,000 BTU/h
Cubic feet per hour = 3,600 x dial size / seconds = 3,600 x 1 / 45 = 80 CFH. At 1,000 BTU per cubic foot, input = 80 x 1,000 = 80,000 BTU/h. Using the seconds as BTU or multiplying 3,600 by 45 gives meaningless results.
Reference: HVAC School, "Clocking a Gas Meter: It's Not That Hard", Formula: CFH = (3600 x dial size) / time (seconds)
A furnace is rated at 120,000 BTU/h input and has a steady-state efficiency of 92 percent. About how much heat does it deliver to the air stream?
Answer: 110,400 BTU/h
Output = input x efficiency = 120,000 x 0.92 = 110,400 BTU/h. Dividing by the efficiency (130,435) is backward, and 9,600 is the amount lost up the vent (120,000 x 0.08).
Reference: Penn State EGEE 102: Energy Conservation for Environmental Protection, 9.6 Home Heating Fuels, Annual Fuel Utilization Efficiency (AFUE): AFUE = heat output / fuel input
A flexible air connector is being replaced between a plenum and a ceiling register boot. What does the IMC limit for flexible air connectors?
Answer: Length of 14 feet, and the connector may not pass through a wall, floor or ceiling
IMC 603.6.2.1 limits flexible air connectors to 14 feet in length and 603.6.2.2 prohibits them from passing through any wall, floor or ceiling. Flexible air ducts, by contrast, are not limited in length (603.6.1.1).
Reference: 2018 International Mechanical Code, Sections 603.6.2.1 and 603.6.2.2
Sources
- PSI: Maryland HVACR Contractor Examinations Candidate Information Bulletin (updated 9/1/2024) (opens in a new tab)
- Maryland Department of Labor: Occupational and Professional Licensing (opens in a new tab)
- Maryland General Assembly: Maryland Code (statutes) (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.