Requirements at a glance
| Agency | State Plumbing Board of Louisiana (SPBLA); exam run by the Board in Baton Rouge and Shreveport |
|---|---|
| Experience | 3,000 hours as an indentured apprentice or 4,000 as an unindentured apprentice, working for a licensed master plumber |
| Exam | 80 written questions in 3 hours plus a 1-hour practical (screw pipe, copper, floor projects) |
| Books | 2021 IRC (plumbing chapters) |
| Fees | $135 exam; license $40; one-time $75 temporary permit |
Registered apprentices with 3,000 (indentured) or 4,000 hours of plumbing work applying for a Louisiana residential plumber license, which covers repairs of existing plumbing in one- and two-family dwellings under a master plumber.
Official links
How to get licensed, step by step
Register as an apprentice
Everyone doing plumbing or gas fitting must register with SPBLA and work for a master company under direct supervision ($20; renew every December 31).
SPBLA: license types and exam information (opens in a new tab)
Apply for the exam
Send the notarized application with proof of hours and the fee at least 30 days before the exam date. Dates are on the SPBLA exam schedule.
SPBLA: exam applications (opens in a new tab)State Plumbing Board of Louisiana (SPBLA) (opens in a new tab)
Sit the exam
The Board mails your results, usually within 2 weeks. If you fail, it sends a retake form.
SPBLA: license types and exam information (opens in a new tab)
Get licensed
After you pass, return the initial license form and fee. Licenses renew every year before December 31 with continuing education.
SPBLA: license types and exam information (opens in a new tab)
How to prepare
- SPBLA publishes no topic outline or passing score, so our topic mix is an estimate from the reference books.
- Tab IRC Chapters 25 to 33 (plumbing): fixtures, water supply sizing, drainage, vents and traps.
- A residential license covers repairs of existing plumbing in one- and two-family dwellings; it is a step below journeyman.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 International Residential Code (IRC)
Listed with the IPC for the plumber exams; the plumbing chapters (25 to 33) matter most.
ICC store (opens in a new tab)Read free (UpCodes): IRC 2021 (opens in a new tab)
Official reference list (as published by the testing agency)
- International Residential Code (IRC), 2021 Edition
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 4 | |
| Fixtures and Fixture Fittings | 6 | |
| Water Heaters | 8 | |
| Water Supply and Distribution | 16 | |
| Sanitary Drainage | 20 | |
| Vents | 10 | |
| Traps and Interceptors | 6 | |
| Storm Drainage and Special Wastes | 4 | |
| Joints, Connections and Testing | 6 |
Exam day details
- Administered by State Plumbing Board of Louisiana (SPBLA).
- Fee: $135 to SPBLA. The license fee ($40) is separate.
- 80 written questions in 3 hours, then a 1-hour hands-on practical (screw pipe, copper and floor projects).
- Experience: 3,000 hours as a registered indentured apprentice or 4,000 hours as a registered unindentured apprentice, working for a licensed master plumber. Most indentured apprentices qualify in about 1.5 years and unindentured in 2.
- A one-time temporary work permit is available for $75 once you are scheduled.
- Board-run exam (not PSI), given in Baton Rouge and Shreveport; the exam schedule is on spbla.com.
- Apply to the Board at least 30 days before the exam date, notarized, with the application fee by check or money order. Cancelling less than 30 days out forfeits the fee.
- Results are mailed, usually within 2 weeks. After a failure the Board sends a retake form.
- You must be a registered apprentice (registration $20) working under a licensed journeyman or master first.
Note: SPBLA publishes no topic outline or weights, and we could not confirm its passing score (secondary sources say 70%). The topic weights on this page are our estimate from the reference books.
Frequently asked questions
What's on the Louisiana residential plumber exam?
80 written questions from the 2021 IRC plus a 1-hour practical with screw pipe, copper and floor projects. SPBLA does not publish topic weights.
How many hours do I need?
3,000 hours as an indentured apprentice or 4,000 hours as an unindentured apprentice, registered with SPBLA and employed by a master plumber.
What can a residential plumber do?
Independently repair existing plumbing in one- and two-family dwellings under a master plumber, or work under direct supervision of a journeyman or master.
Free questions with answers
Show all 10 free questions and answers
Under the 2021 IRC plumbing chapters, a plumber replaces a failed section of branch drain in an older house. What does Section P2502.2 require of the new work?
Answer: The new work must meet the requirements for a new plumbing system, without forcing the rest of the existing system to be upgraded
P2502.2 says additions, alterations, renovations or repairs conform to what is required for a new system, but the existing system is not required to comply with the code. The work must not make the existing system unsafe, insanitary or overloaded. Minor repairs may follow the existing arrangement only if they are not hazardous and are approved.
Reference: 2021 International Residential Code (Louisiana-amended), P2502.2
A bathroom is roughed in for a lavatory beside a water closet. Under the 2021 IRC, what is the minimum center-to-center spacing between the two adjacent fixtures and the minimum clear space in front of the water closet?
Answer: 30 inches between centers and 21 inches in front
P2705.1 sets 30 inches center to center between adjacent fixtures and a clearance of at least 21 inches in front of the water closet, lavatory or bidet to any wall, fixture or door. Fifteen inches is the centerline distance to a side wall.
Reference: 2021 International Residential Code (Louisiana-amended), P2705.1
Under the 2021 IRC, a plumber replaces an existing tank-type water heater in a closet where no pan drain was ever installed. What does P2801.6.1 say about the pan drain?
Answer: A pan drain is not required for the replacement installation because none was previously installed
The second paragraph of P2801.6.1 states that where a pan drain was not previously installed, a pan drain is not required for a replacement water heater installation. This is a practical repair-work point for a residential plumber.
Reference: 2021 International Residential Code (Louisiana-amended), P2801.6.1
Under the 2021 IRC, what is the minimum size of a water service pipe?
Answer: 3/4 inch
P2903.7 states that the size of the water service pipe shall be not less than 3/4 inch diameter. Distribution mains, branches and risers are sized from demand, available pressure and friction loss.
Reference: 2021 International Residential Code (Louisiana-amended), P2903.7
Under the 2021 IRC Table P3004.1, what is the drainage fixture unit value of a water closet using 1.6 gallons per flush, and of a kitchen sink?
Answer: 3 d.f.u. for the water closet and 2 d.f.u. for the kitchen sink
Table P3004.1 assigns 3 d.f.u. to a 1.6 gpf water closet (4 if it uses more than 1.6 gpf) and 2 d.f.u. to a kitchen sink. A lavatory is 1, a bathtub or shower stall is 2 and a floor drain adds 0 on its own.
Reference: 2021 International Residential Code (Louisiana-amended), Table P3004.1
Under the 2021 IRC, what is the minimum slope for a 2-inch horizontal drain, and for a 4-inch horizontal drain?
Answer: 1/4 inch per foot for the 2-inch drain and 1/8 inch per foot for the 4-inch drain
P3005.3 requires at least 1/4 inch per foot (2 percent) for pipe 2 1/2 inches and smaller and at least 1/8 inch per foot (1 percent) for 3 inches and larger.
Reference: 2021 International Residential Code (Louisiana-amended), P3005.3
Under the 2021 IRC, an open vent pipe terminates through a roof that is used as a sunbathing deck. How far above the roof must the vent terminate?
Answer: At least 7 feet
P3103.1.2 requires open vent pipes on roofs used for assembly, as a promenade, observation deck or sunbathing deck to terminate at least 7 feet above the roof.
Reference: 2021 International Residential Code (Louisiana-amended), P3103.1.2
Under the 2021 IRC, what depth of liquid seal must each fixture trap have?
Answer: Not less than 2 inches and not more than 4 inches
P3201.2 requires a liquid seal of at least 2 inches and at most 4 inches. A seal shallower than 2 inches is too easily lost to siphonage, back pressure or evaporation, and the code caps the depth at 4 inches.
Reference: 2021 International Residential Code (Louisiana-amended), P3201.2
Under the 2021 IRC, what minimum size must a storm drainage sump pit have, unless otherwise approved?
Answer: 18 inches in diameter and 24 inches deep
P3303.1.2 requires a sump pit at least 18 inches in diameter and 24 inches deep, accessible, draining by gravity, with a removable cover and a solid floor supporting the pump.
Reference: 2021 International Residential Code (Louisiana-amended), P3303.1.2
Under the Louisiana-amended 2021 IRC, what are the pressure and minimum hold time for an air test of the drainage and vent system?
Answer: 5 psi (or a 10-inch mercury column), held at least 15 minutes
Louisiana's adopted P2503.1 calls for forcing air into the system to a uniform 5 psi gauge pressure or enough to balance a 10-inch column of mercury, held for not less than 15 minutes, with temperature and gasket adjustments made before the test period starts. P2503.5.1 gives the same 5 psi air test.
Reference: 2021 International Residential Code (Louisiana-amended), 2503.1 (Louisiana amendment, LAC 17:I.107) and P2503.5.1
Sources
- State Plumbing Board of Louisiana (SPBLA) (opens in a new tab)
- SPBLA: license types and exam information (opens in a new tab)
- Louisiana State Uniform Construction Code Council (adopted codes) (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.