Requirements at a glance
| Agency | State Plumbing Board of Louisiana (SPBLA); exam run by the Board in Baton Rouge and Shreveport |
|---|---|
| Experience | A current Louisiana journeyman plumber license, or a professional engineer license |
| Exam | Three written parts: 80 questions (3 hours), 25 (2 hours) and 40 (2 hours) |
| Books | 2021 IPC and IRC; Title 51 Part XIII Sewage Disposal (Dec. 2022); NASCLA Louisiana Master Plumbers and Master Natural Gasfitters guide, 2nd Edition |
| Fees | $110 exam; license $190 active or $40 inactive |
Licensed Louisiana journeyman plumbers or professional engineers applying for a master plumber license from SPBLA.
Official links
How to get licensed, step by step
Register as an apprentice
Everyone doing plumbing or gas fitting must register with SPBLA and work for a master company under direct supervision ($20; renew every December 31).
SPBLA: license types and exam information (opens in a new tab)
Apply for the exam
Send the notarized application with proof of hours and the fee at least 30 days before the exam date. Dates are on the SPBLA exam schedule.
SPBLA: exam applications (opens in a new tab)State Plumbing Board of Louisiana (SPBLA) (opens in a new tab)
Sit the exam
The Board mails your results, usually within 2 weeks. If you fail, it sends a retake form.
SPBLA: license types and exam information (opens in a new tab)
Get licensed
After you pass, return the initial license form and fee. Licenses renew every year before December 31 with continuing education.
SPBLA: license types and exam information (opens in a new tab)
How to prepare
- SPBLA publishes no topic outline or passing score, so our topic mix is an estimate from the reference books.
- A passing part is good for one year, so you can retake only the part you failed.
- Part II is the Sanitary Code sewage disposal rules (individual sewage systems) and Part III is business and law from the NASCLA guide; both are very different from the IPC.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2021 IPC and Title 51 Part XIII and the NASCLA Louisiana guide. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2021 International Plumbing Code (IPC)Essential
The core code book for the plumber and master plumber exams.
ICC store (opens in a new tab)Read free (UpCodes): Louisiana Plumbing Code 2021 (opens in a new tab)
2021 International Residential Code (IRC)
Listed with the IPC for the plumber exams; the plumbing chapters (25 to 33) matter most.
ICC store (opens in a new tab)Read free (UpCodes): IRC 2021 (opens in a new tab)
Louisiana Administrative Code Title 51, Part XIII: Sewage Disposal (December 2022)Essential
Master plumber Part II (25 questions).
Title 51 Part XIII: Sewage Disposal (PDF) (opens in a new tab)
NASCLA Louisiana Master Plumbers and Master Natural Gasfitters Guide to Business, Law, and Project Management, 2nd EditionEssential
Master plumber Part III (40 questions).
NASCLA store (Louisiana master plumber and gas fitter guide) (opens in a new tab)
Official reference list (as published by the testing agency)
- International Plumbing Code (IPC), 2021 Edition
- International Residential Code (IRC), 2021 Edition
- Louisiana Administrative Code Title 51, Part XIII (Sewage Disposal), December 2022 edition
- NASCLA Louisiana Master Plumbers and Master Natural Gasfitters Guide to Business, Law, and Project Management, 2nd Edition
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Part I: International Plumbing Code and Residential Code (2021) | 80 | |
| Part II: Louisiana Sanitary Code Part XIII, Sewage Disposal | 25 | |
| Part III: Business, Law and Project Management (NASCLA Louisiana guide) | 40 |
The parts are timed and scored separately, and you must pass each one. Our simulations score each part the same way and give you the combined time (420 minutes).
Exam day details
- Administered by State Plumbing Board of Louisiana (SPBLA).
- Fee: $110 to SPBLA. The license fee is $190 (active) or $40 (inactive).
- Three written parts: 80 questions in 3 hours, 25 in 2 hours and 40 in 2 hours. If you pass one part and not another, the passing part is good for one year.
- Eligibility: a current Louisiana journeyman plumber license, or a professional engineer license. Louisiana does not reciprocate master licenses.
- Board-run exam (not PSI), given in Baton Rouge and Shreveport; the exam schedule is on spbla.com.
- Apply to the Board at least 30 days before the exam date, notarized, with the application fee by check or money order. Cancelling less than 30 days out forfeits the fee.
- Results are mailed, usually within 2 weeks. After a failure the Board sends a retake form.
Note: SPBLA publishes no topic outline or weights, and we could not confirm its passing score (secondary sources say 70%). The topic weights on this page are our estimate from the reference books.
Frequently asked questions
What's on the Louisiana master plumber exam?
Three written parts: Part I, 80 questions on the 2021 IPC and IRC; Part II, 25 questions on Louisiana Sanitary Code Part XIII (sewage disposal); Part III, 40 questions on business and law from the NASCLA Louisiana guide.
Who can take the master plumber exam?
A holder of a current Louisiana journeyman plumber license, or a professional engineer.
Does Louisiana accept master plumber licenses from other states?
No. SPBLA does not reciprocate master licenses.
Free questions with answers
Show all 10 free questions and answers
Under the 2021 IPC, what is the maximum horizontal hanger spacing for PVC drainage pipe?
Answer: 4 feet
Table 308.5 allows PVC pipe a maximum of 4 feet between horizontal supports and 10 feet between vertical supports. Five feet is the interval for cast-iron pipe, and 10 feet is the horizontal interval for copper tubing 1 1/2 inches and larger.
Reference: 2021 International Plumbing Code, Table 308.5
A plumber hangs 10-foot lengths of cast-iron soil pipe horizontally in a building. Under the 2021 IPC, what is the greatest hanger spacing allowed?
Answer: 10 feet
Table 308.5 sets cast-iron pipe at 5 feet horizontally, but footnote a raises this to 10 feet where 10-foot lengths of pipe are installed. Fifteen feet is the vertical interval, and 12 feet is the horizontal interval for steel or copper pipe.
Reference: 2021 International Plumbing Code, Table 308.5, footnote a
Under the 2021 IPC Table 308.5, what is the maximum horizontal support spacing for 1-inch PEX pipe?
Answer: 32 inches
Table 308.5 lists PEX pipe 1 inch and smaller at 2.67 feet (32 inches) horizontally; 4 feet applies to PEX 1 1/4 inches and larger. Six feet is the copper tubing interval for 1 1/4 inches and smaller.
Reference: 2021 International Plumbing Code, Table 308.5
A sewage ejector discharge line (forced sewer) is rated at 25 psi pump pressure. Under the 2021 IPC, what test pressure applies to the forced sewer?
Answer: 30 psi for 15 minutes
Section 312.7 requires a pressure 5 psi greater than the pump rating, held for 15 minutes: 25 + 5 = 30 psi. Testing at only the pump rating (25 psi) is the common mistake, and 5 psi is the margin, not the test pressure.
Reference: 2021 International Plumbing Code, Section 312.7
Under OSHA's construction standard, at what unprotected-edge height must fall protection be provided for workers?
Answer: 6 feet or more above a lower level
29 CFR 1926.501(b)(1) requires fall protection for employees on unprotected sides and edges 6 feet or more above a lower level. Four feet is the general industry trigger, which is the usual wrong pick on construction sites.
Reference: 29 CFR 1926, 1926.501(b)(1)
In a trench 4 feet or more deep, how close must a ladder or other means of egress be to workers under 29 CFR 1926.651?
Answer: Within 25 feet of lateral travel
1926.651(c)(2) requires a stairway, ladder, ramp or other safe means of egress in trench excavations 4 feet or more deep, located so no more than 25 feet of lateral travel is needed.
Reference: 29 CFR 1926, 1926.651(c)(2)
A bid has materials of $8,400 and labor of 40 hours at $45 per hour. Overhead is 15 percent of materials plus labor, then profit is 10 percent of the subtotal including overhead. What is the bid price?
Answer: $12,903
Labor = 40 x 45 = $1,800. Materials + labor = $10,200. Overhead = 0.15 x 10,200 = $1,530, subtotal $11,730. Profit = 0.10 x 11,730 = $1,173, so price = $12,903. $12,750 adds both percents (25 percent) to $10,200.
Reference: Construction business practice (markup, margin and overhead), Building a bid from cost, overhead and profit
What is the smallest total septic tank volume the Louisiana Sanitary Code allows for any application?
Answer: 500 gallons
Source sentence: "The minimum allowable total septic tank volume for all applications is 500 gallons." Even a one-bedroom residence may use only a 500-gallon tank.
Reference: LAC Title 51, Part XIII (Sewage Disposal), Dec. 2022, §715.D
The estimated average daily design flow for a residence is 300 gallons per day. Under LAC 51:XIII, what is the minimum septic tank liquid capacity?
Answer: 750 gallons
Source: "The minimum total septic tank liquid capacity required is 2 1/2 times the estimated average daily design flow." 300 gpd x 2.5 = 750 gallons, which exceeds the 500-gallon floor. Using 2 times the flow gives 600, the usual mistake.
Reference: LAC Title 51, Part XIII (Sewage Disposal), Dec. 2022, §715.D
Under LAC 51:XIII, within what liquid depth range, measured from the outlet invert to the tank bottom, must a septic tank operate?
Answer: At least 30 inches and no more than 72 inches
Source: "The tank shall operate with a liquid depth between a minimum of 30 inches and a maximum of 72 inches measured vertically from the invert of the outlet (overflow level) to the bottom of the tank."
Reference: LAC Title 51, Part XIII (Sewage Disposal), Dec. 2022, §715.F
Sources
- State Plumbing Board of Louisiana (SPBLA) (opens in a new tab)
- SPBLA: license types and exam information (opens in a new tab)
- Louisiana State Uniform Construction Code Council (adopted codes) (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.