Louisiana licensing exam

Louisiana Journeyman Plumber Exam (State Plumbing Board): Practice Test & Licensing Guide

The State Plumbing Board of Louisiana's journeyman plumber written exam: 80 questions in 3 hours on the 2021 IPC and IRC, followed by a 1-hour practical.

Questions
80
Time limit
3 hours
Passing score
Not published by Louisiana
Books
Not published by Louisiana
Which books to bring ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Administration and General Regulations

Two sections of the 2021 IPC specify different materials or methods for the same installation. Which requirement governs?

Requirements at a glance

AgencyState Plumbing Board of Louisiana (SPBLA); exam run by the Board in Baton Rouge and Shreveport
Experience7,000 hours as an indentured apprentice or 8,000 as an unindentured apprentice; reciprocity only with Arkansas and Texas
Exam80 written questions in 3 hours plus a 1-hour practical (floor plan, screw pipe, copper)
Books2021 IPC and 2021 IRC
Fees$135 ($125 exam + $10 processing); license $50; one-time $75 temporary permit

Registered apprentices with 7,000 (indentured) or 8,000 hours of plumbing work applying for a Louisiana journeyman plumber license from SPBLA.

How to get licensed, step by step

  1. Register as an apprentice

    Everyone doing plumbing or gas fitting must register with SPBLA and work for a master company under direct supervision ($20; renew every December 31).

    SPBLA: license types and exam information (opens in a new tab)

  2. Apply for the exam

    Send the notarized application with proof of hours and the fee at least 30 days before the exam date. Dates are on the SPBLA exam schedule.

    SPBLA: exam applications (opens in a new tab)State Plumbing Board of Louisiana (SPBLA) (opens in a new tab)

  3. Sit the exam

    The Board mails your results, usually within 2 weeks. If you fail, it sends a retake form.

    SPBLA: license types and exam information (opens in a new tab)

  4. Get licensed

    After you pass, return the initial license form and fee. Licenses renew every year before December 31 with continuing education.

    SPBLA: license types and exam information (opens in a new tab)

How to prepare

  • SPBLA publishes no topic outline or passing score, so our topic mix is an estimate from the reference books.
  • Tab the IPC drainage and vent sizing tables and the water supply sizing appendix; sizing questions repay quickly.
  • Practice the practical too: a floor plan layout, a threaded (screw) pipe project and a soldered copper project.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Plumbing Code (IPC), 2021 Edition
  • International Residential Code (IRC), 2021 Edition

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Administration and General Regulations6
Fixtures and Fixture Fittings8
Water Heaters, Supply and Distribution16
Sanitary Drainage18
Vents12
Traps, Interceptors and Special Wastes8
Storm Drainage4
Joints, Connections, Hangers and Support4
Testing, Inspection and Backflow Protection4

Exam day details

  • Administered by State Plumbing Board of Louisiana (SPBLA).
  • Fee: $135 to SPBLA ($125 exam fee plus $10 processing). The license fee ($50) is separate.
  • 80 written questions in 3 hours, then a 1-hour hands-on practical (floor plan, screw pipe and copper projects).
  • Experience: 7,000 hours as a registered indentured apprentice or 8,000 hours as an unindentured apprentice, under a licensed journeyman or master. Louisiana reciprocates with Arkansas and Texas only; other out-of-state licenses may be used to qualify if earned with at least 8,000 hours.
  • A one-time temporary work permit is available for $75 once you are scheduled.
  • Board-run exam (not PSI), given in Baton Rouge and Shreveport; the exam schedule is on spbla.com.
  • Apply to the Board at least 30 days before the exam date, notarized, with the application fee by check or money order. Cancelling less than 30 days out forfeits the fee.
  • Results are mailed, usually within 2 weeks. After a failure the Board sends a retake form.
  • You must be a registered apprentice (registration $20) working under a licensed journeyman or master first.

Note: SPBLA publishes no topic outline or weights, and we could not confirm its passing score (secondary sources say 70%). The topic weights on this page are our estimate from the reference books.

Frequently asked questions

What's on the Louisiana journeyman plumber exam?

80 written questions from the 2021 IPC and 2021 IRC, plus a 1-hour practical with a floor plan, a screw pipe and a copper project. SPBLA does not publish topic weights.

How many hours do I need before I can sit for it?

7,000 hours as an indentured apprentice or 8,000 hours as an unindentured apprentice, both registered with SPBLA.

Is the Louisiana plumber exam run by PSI?

No. SPBLA runs it in Baton Rouge and Shreveport, quarterly. You apply to the Board at least 30 days before the exam date.

Free questions with answers

Show all 10 free questions and answers
  1. Two sections of the 2021 IPC specify different materials or methods for the same installation. Which requirement governs?

    Answer: The most restrictive requirement governs where different sections specify different materials, methods or requirements.

    Section 102.1 says a specific requirement governs over a general one, and where different sections give different materials, methods or requirements, the most restrictive governs. Order of appearance and installer convenience play no part.

    Reference: 2021 International Plumbing Code, Section 102.1

  2. A flush tank is fitted with an antisiphon fill valve. How must the fill valve's backflow preventer be located relative to the overflow pipe under the 2021 IPC?

    Answer: At least 1 inch above the full opening of the overflow pipe

    Section 415.3.1 requires an antisiphon fill valve conforming to ASSE 1002 with its backflow preventer not less than 1 inch above the full opening of the overflow pipe. The overflow itself must open above the flood level rim of the fixture (Section 415.3.2).

    Reference: 2021 International Plumbing Code, Section 415.3.1

  3. Static water pressure in a building reaches 95 psi. What does the 2021 IPC require?

    Answer: A pressure-reducing valve with a strainer, set so static pressure in the building does not exceed 80 psi

    Section 604.8 requires an approved pressure-reducing valve conforming to ASSE 1003 or CSA B356 with a strainer where building pressure exceeds 80 psi static, to reduce the pressure in the building water distribution piping to not greater than 80 psi static.

    Reference: 2021 International Plumbing Code, Section 604.8

  4. A new potable water system will be disinfected with a chlorine solution, with no method prescribed by the health authority or water purveyor. Which procedure does the 2021 IPC list in its disinfection section?

    Answer: At least 50 ppm chlorine held for 24 hours, or at least 200 ppm chlorine held for 3 hours

    Section 610.1 requires new potable water systems to be purged and disinfected, using the method prescribed by the health authority or purveyor, or AWWA C651/C652, or the procedure in the section: 50 ppm for 24 hours or 200 ppm for 3 hours, followed by flushing with potable water until the chlorine is purged.

    Reference: 2021 International Plumbing Code, Section 610.1

  5. What is the minimum slope for a horizontal drainage pipe 3 inches in diameter, per Table 704.1 of the 2021 IPC?

    Answer: 1/8 inch per foot

    Table 704.1 gives 1/4 inch per foot for pipe 2 1/2 inches and smaller, 1/8 inch per foot for sizes 3 to 6 inches, and 1/16 inch per foot for 8 inches and larger. Piping upstream of a grease interceptor must be at least 1/4 inch per foot (Section 704.1).

    Reference: 2021 International Plumbing Code, Table 704.1

  6. Under Table 704.1 of the 2021 IPC, a horizontal 3-inch waste branch runs 40 feet at the minimum code slope. How much total fall is needed over that run?

    Answer: 5 inches

    Table 704.1 gives 1/8 inch per foot for 3 inch pipe. 40 ft x 1/8 in/ft = 5 inches of fall. Using 1/4 inch per foot (the slope for 2 1/2 inch and smaller pipe) would give 10 inches, and 1/16 inch per foot would give 2 1/2 inches.

    Reference: 2021 International Plumbing Code, Table 704.1

  7. A restaurant roof is used as a sunbathing and observation deck. How high must open vent pipes extend above that roof under the 2021 IPC?

    Answer: At least 7 feet above the roof

    Section 903.1.2 requires open vent pipes to terminate not less than 7 feet above a roof used as a promenade, restaurant, bar, sunbathing deck, observation deck or for similar purposes.

    Reference: 2021 International Plumbing Code, Section 903.1.2

  8. What are the maximum distances from the fixture outlet to the trap under the 2021 IPC?

    Answer: 24 inches vertically to the trap weir, and 30 inches horizontally from fixture outlet centerline to trap inlet centerline

    Section 1002.1 requires each fixture to be separately trapped, with the vertical distance from the fixture outlet to the trap weir not exceeding 24 inches and the horizontal distance not exceeding 30 inches, measured from the fixture outlet centerline to the trap inlet centerline. It does not apply to fixtures with integral traps.

    Reference: 2021 International Plumbing Code, Section 1002.1

  9. Which statement about secondary (emergency overflow) roof drains is correct under the 2021 IPC?

    Answer: Their discharge end point is separate from the primary system, above grade, where occupants would see it.

    Section 1108.2 requires the secondary roof drain system to have its end point of discharge separate from the primary system, above grade in a location that would normally be observed by occupants or maintenance personnel. Section 1108.3 sizes them from the same rainfall rate as the primary system.

    Reference: 2021 International Plumbing Code, Section 1108.2

  10. Cast-iron soil pipe is installed in 10-foot lengths. What is the maximum horizontal hanger spacing under the 2021 IPC?

    Answer: 10 feet, since the 5 foot spacing may be increased for 10-foot lengths

    Table 308.5 gives 5 feet horizontal for cast-iron pipe, with a note that the maximum horizontal spacing of cast-iron pipe hangers may be increased to 10 feet where 10-foot lengths of pipe are installed. The vertical maximum is 15 feet.

    Reference: 2021 International Plumbing Code, Table 308.5

Sources

Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.