Requirements at a glance
| Agency | Louisiana State Licensing Board for Contractors (LSLBC); exams by PSI |
|---|---|
| Exam | 80 questions, 3 hours, 70% |
| Books allowed | 2018 IRC, 29 CFR 1926, ACI concrete guide, Modern Masonry, carpentry texts, BCSI and others |
| Requirements | Business and Law course (not an exam), net worth statement, insurance and other LSLBC requirements |
| Fees | $140 to PSI, plus LSLBC application and license fees |
Qualifying parties for a Louisiana residential building contractor license (residential work of $50,000 or more, or any structural work) from the LSLBC.
Official links
How to get licensed, step by step
Apply to the LSLBC
Submit an application for licensure, or a request to add a classification or qualifying party to your license. The Board reviews it before you can test.
LSLBC: apply for a license (opens in a new tab)Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)
Schedule with PSI
Once approved you get an e-mail from PSI to pay and schedule. Eligibility is good for one year; after that you reapply with the Board.
Schedule with PSI (Louisiana contractors) (opens in a new tab)
Take the open-book exam
Bring your own tabbed references. 70% is passing.
Schedule with PSI (Louisiana contractors) (opens in a new tab)
Finish your license
Complete the Business and Law course and the remaining LSLBC requirements to be licensed.
Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's outline. Louisiana's adopted codes are the 2021 ICC codes and the 2020 NEC, but several PSI exams list other editions (the 2023 NEC, 2018 ICC books). The 2023 NEC and 2024 ICC codes take effect January 1, 2027.
- Tab your books before exam day. You can highlight, underline and index them with permanent tabs, but you can't write in them, and sticky notes are removed.
- Estimating, plan reading and general code requirements (18) and carpentry (15) are over 40% of the exam. Practice takeoffs and IRC span and fastening tables.
- Foundations and concrete are 22 questions together: footing sizes, rebar cover and concrete mixes.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Residential Code (IRC)Essential
PSI lists the 2018 edition for the residential building contractor exam.
29 CFR Part 1926: Safety and Health Regulations for Construction
Allowed in the room for the electrical, mechanical and building exams. Free online from OSHA.
Official reference list (as published by the testing agency)
- International Residential Code (IRC), 2018 Edition
- 29 CFR Part 1926 (OSHA construction standards)
- ACI Contractor's Guide to Quality Concrete Construction, 4th Edition (2018)
- Modern Masonry, 8th Edition
- Carpentry and Building Construction (2010 or 2016)
- BCSI 2018, Pipe and Excavation Contracting (2011), Roofing Construction and Estimating (1995)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Site work, Footings and Foundations | 13 | |
| Concrete and Concrete Reinforcement | 9 | |
| Masonry | 5 | |
| Carpentry | 15 | |
| Associated Trades and Drywall | 6 | |
| Roofing | 7 | |
| Estimating, Plan Reading and General Code Requirements | 18 | |
| OSHA Safety | 7 |
Exam day details
- Administered by PSI Services for the Louisiana State Licensing Board for Contractors (LSLBC).
- Fee: $140 to PSI. LSLBC application and license fees are separate.
- 80 questions in 3 hours; 56 correct (70%) to pass.
- PSI lists the 2018 IRC; Louisiana's adopted code is the 2021 IRC. Our questions name the edition they use.
- Open book: bring your own copies of the allowed references. You may highlight, underline and index them beforehand, but not write in them during the exam. Temporary tabs such as sticky notes are removed.
- PSI may add unscored experimental questions, which count against your time.
- The LSLBC must approve your application (or your request to add a classification) first. PSI then e-mails your eligibility, which is good for one year; if you haven't passed by then you reapply with the Board.
- Business and Law is a required course, not an exam, so there is no separate business exam to take.
- Code questions are based only on the edition PSI lists. For other references, later editions are fine.
Frequently asked questions
What's on the Louisiana residential building contractor exam?
80 questions: estimating, plan reading and general code requirements 18, carpentry 15, site work, footings and foundations 13, concrete 9, roofing 7, OSHA safety 7, associated trades and drywall 6 and masonry 5.
Which IRC edition is on the exam?
PSI's outline lists the 2018 IRC even though Louisiana has adopted the 2021 IRC.
Is there a separate business exam?
No. LSLBC requires a Business and Law course, not an exam.
Free questions with answers
Show all 10 free questions and answers
No soil report was ordered for a house, and the soil at footing depth is a clean sandy gravel classed GW. Using the 2018 IRC presumptive load-bearing table, what value may be assumed?
Answer: 3,000 psf
Table R401.4.1 lists sandy gravel and gravel (GW and GP) at 3,000 psf. Sand, silty sand, clayey sand, silty gravel and clayey gravel (SW, SP, SM, SC, GM, GC) are 2,000 psf, and clays and silts (CL, ML, MH, CH) are 1,500 psf. Sedimentary and foliated rock is 4,000 psf. Find the soil group in the left column and read across.
Reference: 2018 International Residential Code, Table R401.4.1
A straight 30-foot sill plate sits on a concrete stem wall in a house in Seismic Design Category B. The first and last 1/2-inch anchor bolts are 12 inches from the plate ends, and the bolts between them are at the maximum spacing allowed by Section R403.1.6 of the 2018 IRC. What is the minimum number of anchor bolts for this plate section?
Answer: 6
Section R403.1.6 requires 1/2-inch bolts at a maximum of 6 feet on center, with a bolt within 12 inches of each plate end. The bolts span 30 - 1 - 1 = 28 ft. 28 / 6 = 4.67, which rounds up to 5 spaces, so the bolt count is 5 + 1 = 6. Five bolts would leave one space wider than 6 ft.
Reference: 2018 International Residential Code, Section R403.1.6
A wood-frame house has 500 sq ft of anchored brick veneer, net of openings, in a low-seismic, low-wind area. If each veneer tie supports the maximum wall area the 2018 IRC allows, what is the minimum number of ties?
Answer: 188
Section R703.8.4.1 allows each tie to support not more than 2.67 sq ft of wall area, at no more than 32 inches horizontally and 24 inches vertically. 500 / 2.67 = 187.3, rounded up to 188. 250 uses 2 sq ft per tie, 143 uses 3.5 sq ft, and 125 uses 4 sq ft, all of which exceed or misstate the limit.
Reference: 2018 International Residential Code, Section R703.8.4.1
A wall is framed with a double top plate. Under Section R602.3.2 of the 2018 IRC, how far must the end joints of the upper plate be offset from the end joints of the lower plate?
Answer: At least 24 inches
R602.3.2 requires the end joints in the two layers of a double top plate to be offset at least 24 inches. The double plate ties intersecting walls together and carries loads across stud spacing. Joints directly above one another would leave a weak point in the plate.
Reference: 2018 International Residential Code, Section R602.3.2
Floor joists rest on a poured concrete foundation wall. Under the 2018 IRC, what is the minimum bearing length required at each joist end, and what is the minimum on a wood sill or girder?
Answer: 3 inches on concrete and 1-1/2 inches on wood
Section R502.6 requires joists to bear at least 1-1/2 inches on wood or metal and at least 3 inches on masonry or concrete. The first choice reverses the two. The larger bearing on concrete reduces crushing stress on the supporting material.
Reference: 2018 International Residential Code, Section R502.6
Half-inch gypsum board will be screwed to ceiling joists framed 24 inches on center, without adhesive. Under Table R702.3.5 of the 2018 IRC, how must the sheets be oriented?
Answer: Perpendicular to the joists
Table R702.3.5 allows 1/2-inch gypsum board on ceilings with framing at 24 inches on center when the sheets are applied perpendicular to the framing. Placing the long dimension across the joists stiffens the ceiling and limits sag. Parallel application is limited to closer framing spacing.
Reference: 2018 International Residential Code, Table R702.3.5
A porch addition has a 3:12 roof that will be covered with asphalt shingles. Under Section R905.2.2 of the 2018 IRC, what is required on a roof of this slope?
Answer: A double underlayment application, because the slope is from 2:12 up to less than 4:12
R905.2.2 allows asphalt shingles only on slopes of 2 units vertical in 12 horizontal or greater. On slopes from 2:12 to less than 4:12 a double underlayment application is required. Below 2:12 a different roof covering is needed. A 3:12 slope falls in the double-underlayment range.
Reference: 2018 International Residential Code, Section R905.2.2
Under OSHA's construction fall protection standard, at what height above a lower level must employees on a residential construction site working on unprotected sides and edges be protected from falling?
Answer: 6 feet
29 CFR 1926.501(b)(1) requires fall protection for employees on a walking or working surface with an unprotected side or edge 6 feet or more above a lower level, using guardrails, safety nets or a personal fall arrest system. Scaffolds use a different trigger of 10 feet, and general industry uses 4 feet.
Reference: 29 CFR Part 1926 (OSHA Construction), 1926.501(b)(1)
A contractor will install a 6-foot-high wood fence around a back yard. Under the work-exempt-from-permit list in Section R105.2 of the 2018 IRC, how is a fence handled?
Answer: No permit is required for fences not over 7 feet high
R105.2 exempts fences not over 7 feet high from a building permit. The exemption lists other items, such as retaining walls not over 4 feet in height measured from the bottom of the footing to the top of the wall (unless supporting a surcharge), and painting and similar finish work. A 6-foot fence is under the limit.
Reference: 2018 International Residential Code, Section R105.2
A building permit was issued in March, but no work started until the following October, which is well over 6 months later. Under Section R105.5 of the 2018 IRC, what is the status of the permit?
Answer: It has expired, because work was not commenced within 180 days of issuance
R105.5 says a permit becomes invalid if the work it authorizes is not commenced within 180 days after issuance, or if the work is suspended or abandoned for 180 days after it starts. March to October is more than 180 days, so this permit has expired. The building official may grant one or more written extensions of up to 180 days each when the extension is requested in writing and justifiable cause is shown.
Reference: 2018 International Residential Code, Section R105.5
Sources
- PSI: Louisiana contractor exam registration (LSLBC) (opens in a new tab)
- Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)
- PSI: Louisiana LSLBC Residential Construction content outline (opens in a new tab)
- Louisiana State Uniform Construction Code Council (adopted codes) (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.