Louisiana licensing exam

Louisiana Carpentry Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for the LSLBC Carpentry classification: 60 questions on rough carpentry and formwork, finish carpentry, drywall, windows and doors, safety and the 2021 IBC. Open book, 70% to pass.

Questions
60
Time limit
2 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Safety

A scaffold will carry a maximum intended load of 1,500 pounds. Under 29 CFR 1926.451(a)(1), what load must the scaffold and its components be capable of supporting without failure, in addition to its own weight?

Requirements at a glance

AgencyLouisiana State Licensing Board for Contractors (LSLBC); exams by PSI
Exam60 questions, 2 hours, 70%
Books allowed2021 IBC, 29 CFR 1926, Feirer Carpentry and Building Construction, BCSI, USG Gypsum Construction Handbook, Finish Carpenter's Manual
RequirementsBusiness and Law course (not an exam), net worth statement, insurance and other LSLBC requirements
Fees$125 to PSI, plus LSLBC application and license fees

Qualifying parties for a Louisiana Carpentry contractor license from the LSLBC.

How to get licensed, step by step

  1. Apply to the LSLBC

    Submit an application for licensure, or a request to add a classification or qualifying party to your license. The Board reviews it before you can test.

    LSLBC: apply for a license (opens in a new tab)Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)

  2. Schedule with PSI

    Once approved you get an e-mail from PSI to pay and schedule. Eligibility is good for one year; after that you reapply with the Board.

    Schedule with PSI (Louisiana contractors) (opens in a new tab)

  3. Take the open-book exam

    Bring your own tabbed references. 70% is passing.

    Schedule with PSI (Louisiana contractors) (opens in a new tab)

  4. Finish your license

    Complete the Business and Law course and the remaining LSLBC requirements to be licensed.

    Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)

How to prepare

  • Bring the exact editions on PSI's outline. Louisiana's adopted codes are the 2021 ICC codes and the 2020 NEC, but several PSI exams list other editions (the 2023 NEC, 2018 ICC books). The 2023 NEC and 2024 ICC codes take effect January 1, 2027.
  • Tab your books before exam day. You can highlight, underline and index them with permanent tabs, but you can't write in them, and sticky notes are removed.
  • Rough carpentry and formwork is 27 of 60 questions and finish carpentry 14: Feirer's Carpentry and Building Construction covers most of it.
  • Tab the BCSI truss handling and bracing guide and the Gypsum Construction Handbook for drywall questions.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • 29 CFR Part 1926 (OSHA construction standards)
  • Carpentry and Building Construction, 2010 or 2016 (Feirer and Feirer)
  • BCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses, 2018
  • Gypsum Construction Handbook, 7th Edition (USG)
  • Finish Carpenter's Manual (Tolpin, 1993)
  • International Building Code (IBC), 2021 Edition
  • The Complete Illustrated Guide to Furniture and Cabinet Construction (Rae, 2001)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Safety6
Insulation1
Windows and Doors3
Rough Carpentry and Formwork27
Finish Carpentry14
Drywall7
Siding2

Exam day details

  • Administered by PSI Services for the Louisiana State Licensing Board for Contractors (LSLBC).
  • Fee: $125 to PSI. LSLBC application and license fees are separate.
  • 60 questions in 2 hours; 42 correct (70%) to pass.
  • Rough carpentry and formwork alone is 27 of the 60 questions.
  • Open book: bring your own copies of the allowed references. You may highlight, underline and index them beforehand, but not write in them during the exam. Temporary tabs such as sticky notes are removed.
  • PSI may add unscored experimental questions, which count against your time.
  • The LSLBC must approve your application (or your request to add a classification) first. PSI then e-mails your eligibility, which is good for one year; if you haven't passed by then you reapply with the Board.
  • Business and Law is a required course, not an exam, so there is no separate business exam to take.
  • Code questions are based only on the edition PSI lists. For other references, later editions are fine.

Frequently asked questions

What's on the Louisiana carpentry exam?

60 questions: rough carpentry and formwork 27, finish carpentry 14, drywall 7, safety 6, windows and doors 3, siding 2 and insulation 1.

Which IBC edition is on the exam?

PSI's outline lists the 2021 IBC for the carpentry exam.

How long is the exam?

2 hours for 60 questions; 42 correct is passing.

Free questions with answers

Show all 10 free questions and answers
  1. A scaffold will carry a maximum intended load of 1,500 pounds. Under 29 CFR 1926.451(a)(1), what load must the scaffold and its components be capable of supporting without failure, in addition to its own weight?

    Answer: 6,000 pounds (4 times the intended load)

    Section 1926.451(a)(1) requires each scaffold and scaffold component to support its own weight and at least 4 times the maximum intended load applied or transmitted to it. 1,500 lb x 4 = 6,000 lb. Using a factor of 2 or 3 would understate the required capacity.

    Reference: 29 CFR Part 1926 (OSHA construction standards), 29 CFR 1926.451(a)(1)

  2. Under the 2021 IBC, an enclosed attic is insulated with batts. What clear airspace must be kept between the insulation and the underside of the roof sheathing?

    Answer: Not less than 1 inch

    Section 1202.2.1 requires an airspace of not less than 1 inch between the insulation and the roof sheathing so cross ventilation can move air. Net free vent area is 1/150 of the attic area (1/300 under the exception). Baffles at the eaves are used to hold insulation back and keep that airspace open.

    Reference: 2021 International Building Code, Section 1202.2.1

  3. Under the 2021 IBC, what is the minimum net clear opening area for a grade-floor emergency escape and rescue window in a sleeping room?

    Answer: 5.0 square feet

    Section 1031.3.1 requires 5.7 square feet net clear opening, with an exception reducing it to 5 square feet for grade-floor openings. Because the question says grade floor, 5.0 applies; 5.7 is the requirement for openings above grade. Net clear dimensions are measured with the window in normal operation.

    Reference: 2021 International Building Code, Section 1031.3.1

  4. Under the 2021 IBC, what is the minimum clearance between wood siding and the earth on the exterior of a building, unless the siding, sheathing and framing are naturally durable or preservative-treated?

    Answer: 6 inches

    Section 2304.12.1.5 requires at least 6 inches between wood siding and earth, and at least 2 inches vertically from concrete steps, porch slabs and patio slabs exposed to weather. The 2-inch figure is the clearance to those horizontal concrete surfaces, not to soil.

    Reference: 2021 International Building Code, Section 2304.12.1.5

  5. A one-story house is framed with a sill plate bolted to the foundation under the conventional light-frame provisions of the 2021 IBC. What is the maximum on-center spacing of the 1/2-inch anchor bolts (for structures not over two stories above grade)?

    Answer: 6 feet

    Section 2308.3.1 limits bolt spacing to 6 feet on center, with at least two bolts or anchor straps per plate piece. Bolts in the sill plates of braced wall lines in structures over two stories above grade must be spaced at 4 feet on center, which is the tempting wrong answer here.

    Reference: 2021 International Building Code, Section 2308.3.1

  6. A 10-foot piece of sill plate is being anchored under Section 2308.3.1 of the 2021 IBC. Where must the end bolts or anchor straps be located on each piece?

    Answer: Not more than 12 inches and not less than 4 inches from each end of the piece

    Section 2308.3.1 requires at least two bolts or straps per piece, one located not more than 12 inches or less than 4 inches from each end. The 6-foot figure is the maximum spacing, and the middle-third rule applies to the position of the bolt across the plate width, not along its length.

    Reference: 2021 International Building Code, Section 2308.3.1

  7. Under Section 1011.5.2 of the 2021 IBC, what is the maximum stair riser height within a dwelling unit in a Group R-3 occupancy?

    Answer: 7 3/4 inches

    The general riser limit in Section 1011.5.2 is 7 inches with an 11-inch tread, but the exception for Group R-3 occupancies and dwelling units in Group R-2 allows a riser up to 7 3/4 inches with a tread of at least 10 inches. Seven inches is the general-rule distractor.

    Reference: 2021 International Building Code, Section 1011.5.2, Exception for Group R-3

  8. A stair has a total rise of 108 inches from finished floor to finished floor in a Group R-3 dwelling. Using the 7 3/4-inch maximum riser from Section 1011.5.2 of the 2021 IBC, what is the minimum number of risers?

    Answer: 14 risers

    108 / 7.75 = 13.94, which must be rounded up to 14 risers, since 13 risers would be 8.31 inches each and exceed the limit. Each riser is then 108 / 14 = 7.71 inches. A flight with 14 risers has 13 treads, because the top floor serves as the last tread.

    Reference: 2021 International Building Code, Section 1011.5.2

  9. A wall will be painted with a flat paint and receive a light texture or standard flat finish in a typical residence. Which level of gypsum board finish (GA-214) is normally specified for flat paint?

    Answer: Level 4: taped, with additional coats of compound over joints and fasteners

    Level 4 (tape, embedding coat and additional separate coats of joint compound over joints and fasteners, sanded smooth) is the usual finish under flat paints and light textures. Level 5, the skim-coated surface, is for gloss or semi-gloss paint and critical lighting. Level 1 is only for areas hidden above ceilings, and Level 2 is a base for tile or in garages.

    Reference: PSI Louisiana Carpentry content outline (trade practice), Drywall: levels of gypsum board finish (USG Gypsum Construction Handbook)

  10. Gypsum board over a plenum above a suspended ceiling, hidden from view, only needs the joints taped and embedded in compound. What finish level is this?

    Answer: Level 1

    Level 1 consists of tape embedded in joint compound in the joints and interior angles, with no finishing coats, and it is used where appearance is not important, such as above ceilings or in plenums. Level 0 has no taping at all, and Levels 2 and 3 add coats.

    Reference: PSI Louisiana Carpentry content outline (trade practice), Drywall: levels of gypsum board finish (USG Gypsum Construction Handbook)

Sources

Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.