Requirements at a glance
| Agency | Louisiana State Licensing Board for Contractors (LSLBC); exams by PSI |
|---|---|
| Exam | 80 questions, 3 hours, 70% |
| Books allowed | 2018 IBC, 29 CFR 1926, SJI TD9, PCA Design and Control of Concrete Mixtures, CRSI and others |
| Requirements | Business and Law course (not an exam), net worth statement, insurance and other LSLBC requirements |
| Fees | $175 to PSI, plus LSLBC application and license fees |
Qualifying parties for a Louisiana commercial Building Construction contractor license from the LSLBC (commercial projects of $50,000 or more).
Official links
How to get licensed, step by step
Apply to the LSLBC
Submit an application for licensure, or a request to add a classification or qualifying party to your license. The Board reviews it before you can test.
LSLBC: apply for a license (opens in a new tab)Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)
Schedule with PSI
Once approved you get an e-mail from PSI to pay and schedule. Eligibility is good for one year; after that you reapply with the Board.
Schedule with PSI (Louisiana contractors) (opens in a new tab)
Take the open-book exam
Bring your own tabbed references. 70% is passing.
Schedule with PSI (Louisiana contractors) (opens in a new tab)
Finish your license
Complete the Business and Law course and the remaining LSLBC requirements to be licensed.
Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's outline. Louisiana's adopted codes are the 2021 ICC codes and the 2020 NEC, but several PSI exams list other editions (the 2023 NEC, 2018 ICC books). The 2023 NEC and 2024 ICC codes take effect January 1, 2027.
- Tab your books before exam day. You can highlight, underline and index them with permanent tabs, but you can't write in them, and sticky notes are removed.
- General code, plan reading and estimating (15) and concrete (13) lead, then metals (10) and safety (8).
- The exam lists the 2018 IBC; Louisiana adopted the 2021 IBC. Use the edition on PSI's outline for code lookups.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IBC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Building Code (IBC)Essential
PSI lists the 2018 edition for the building construction exam.
29 CFR Part 1926: Safety and Health Regulations for Construction
Allowed in the room for the electrical, mechanical and building exams. Free online from OSHA.
Official reference list (as published by the testing agency)
- International Building Code (IBC), 2018 Edition
- 29 CFR Part 1926 (OSHA construction standards)
- Steel Joist Institute Technical Digest 9, 3rd Edition
- PCA Design and Control of Concrete Mixtures, 15th or 16th Edition
- CRSI Placing Reinforcing Bars, 9th Edition
- Other masonry, carpentry and estimating references listed on PSI's outline
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Sitework | 7 | |
| Concrete | 13 | |
| Masonry | 7 | |
| Metals | 10 | |
| Carpentry | 7 | |
| Thermal and Moisture Protection | 7 | |
| Doors and Windows | 3 | |
| Finishes | 3 | |
| Safety | 8 | |
| General Code Plan Reading and Estimating | 15 |
Exam day details
- Administered by PSI Services for the Louisiana State Licensing Board for Contractors (LSLBC).
- Fee: $175 to PSI. LSLBC application and license fees are separate.
- 80 questions in 3 hours; 56 correct (70%) to pass.
- PSI lists the 2018 IBC; Louisiana's adopted code is the 2021 IBC. Our questions name the edition they use.
- Open book: bring your own copies of the allowed references. You may highlight, underline and index them beforehand, but not write in them during the exam. Temporary tabs such as sticky notes are removed.
- PSI may add unscored experimental questions, which count against your time.
- The LSLBC must approve your application (or your request to add a classification) first. PSI then e-mails your eligibility, which is good for one year; if you haven't passed by then you reapply with the Board.
- Business and Law is a required course, not an exam, so there is no separate business exam to take.
- Code questions are based only on the edition PSI lists. For other references, later editions are fine.
Frequently asked questions
What's on the Louisiana building construction exam?
80 questions: general code, plan reading and estimating 15, concrete 13, metals 10, safety 8, sitework 7, masonry 7, carpentry 7, thermal and moisture protection 7, doors and windows 3 and finishes 3.
How much does it cost?
$175 to PSI, higher than the $140 trade exams. LSLBC application and license fees are separate.
Which IBC edition is on the exam?
PSI's outline lists the 2018 IBC. Louisiana has adopted the 2021 IBC.
Free questions with answers
Show all 10 free questions and answers
A rectangular excavation for a building pad measures 60 ft by 40 ft and averages 6 ft deep. About how many cubic yards of soil (bank measure) will be removed?
Answer: 533 cubic yards
Volume = 60 x 40 x 6 = 14,400 cubic feet. There are 27 cubic feet in a cubic yard, so 14,400 / 27 = 533 cubic yards. Dividing by 9 gives 1,600, leaving out the depth gives 2,400 / 27 = 89, and dividing by 3 gives 4,800.
Reference: General trade practice, Earthwork volume takeoff (cubic feet / 27 = cubic yards)
Adding extra water to a concrete mix at the jobsite to make it easier to place will mostly cause what?
Answer: A higher water-cementitious materials ratio, with lower strength and durability
Strength and durability depend mainly on the water-cementitious materials ratio. More water than the design mix means a higher ratio, a more porous paste, lower strength and greater shrinkage. A water-reducing admixture is the proper way to improve workability.
Reference: PCA Design and Control of Concrete Mixtures, 16th Edition, Water-cementitious materials ratio and strength
What are the actual dimensions of a standard nominal 8 x 8 x 16 inch concrete masonry unit (CMU) so that it fits a 3/8-inch mortar joint module?
Answer: 7-5/8 inches high, 7-5/8 inches thick and 15-5/8 inches long
Nominal block sizes include the mortar joint. With a 3/8-inch joint, the actual unit is 3/8 inch smaller than nominal in each dimension: 7-5/8 x 7-5/8 x 15-5/8 inches. That keeps courses on an 8-inch module and units on a 16-inch module.
Reference: Modern Masonry: Brick, Block, Stone (Kicklighter), 8th Edition, Concrete masonry units: nominal and actual sizes
Under 29 CFR 1926.757(b)(1), how must each end of a K-series steel joist be attached to its support at minimum?
Answer: Two 1/8-inch fillet welds 1 inch long, or two 1/2-inch bolts, or the equivalent
Section 1926.757(b)(1) requires each end of a K-series joist to be attached with at least two 1/8-inch fillet welds 1 inch long, or two 1/2-inch bolts, or the equivalent. The larger 1/4-inch weld by 2 inches or 3/4-inch bolt requirement is for LH, DLH and joist girders.
Reference: 29 CFR Part 1926, 1926.757(b)(1)
How many board feet are in twelve 2 x 10 boards, each 16 feet long?
Answer: 320 board feet
Board feet = thickness (in) x width (in) x length (ft) / 12. For one board: 2 x 10 x 16 / 12 = 26.67 bf. Twelve boards = 320 bf. 267 is only 10 boards, 240 uses 12-foot boards, and 160 uses 8-foot boards.
Reference: Carpentry and Building Construction (Feirer), 2016 Student Edition, Measuring lumber: board feet
Under the 2018 IBC, what is the minimum slope for lapped, nonsoldered-seam metal roof panels that have no applied lap sealant?
Answer: 3 units vertical in 12 units horizontal
Section 1507.4.2 sets 3:12 for lapped, nonsoldered seam metal panels without applied lap sealant, and 1/2:12 where lap sealant is applied per the manufacturer's instructions. Standing-seam metal roof panel systems may go as low as 1/4:12.
Reference: 2018 International Building Code, Section 1507.4.2 Deck Slope (metal roof panels)
Under the 2018 IBC, between what heights above the floor must the operable parts of door hardware on an egress door be placed?
Answer: Not less than 34 inches and not more than 48 inches
Section 1010.1.9.2 requires door handles, pulls, latches and locks to be installed not less than 34 inches and not more than 48 inches above the finished floor. This range also matches accessibility reach ranges.
Reference: 2018 International Building Code, Section 1010.1.9.2 Hardware Height
Which type of gypsum board is normally specified for fire-resistance-rated wall and ceiling assemblies?
Answer: Type X
Type X gypsum board has a glass-fiber reinforced core that holds together longer in a fire and is used in listed fire-resistance-rated assemblies. It is typically 5/8 inch thick. The other letters are not standard fire-rated board types.
Reference: ASTM C1396 (gypsum board), Types of gypsum board: Type X
Under 29 CFR 1926.502(d)(16), when a personal fall arrest system with a full body harness stops a fall, what are the limits on arresting force and free-fall distance?
Answer: Maximum arresting force 1,800 pounds, and no free fall of more than 6 feet
A personal fall arrest system must limit the arresting force on the employee to 1,800 pounds with a body harness (900 pounds with a body belt) and be rigged so that the free fall is no more than 6 feet. The 5,000-pound value is the anchorage strength requirement.
Reference: 29 CFR Part 1926, 1926.502(d)(16)
Under the 2018 IBC occupant load factor for assembly space without fixed seats, unconcentrated use (tables and chairs) at 15 sq ft net per occupant, what is the occupant load of a banquet room with 1,800 sq ft of net floor area?
Answer: 120 occupants
Section 1004.5 and Table 1004.5 give the occupant load as floor area divided by the factor: 1,800 / 15 = 120. Using the concentrated factor of 7 net gives 257, using 30 net gives 60, and using 5 net (standing space) gives 360.
Reference: 2018 International Building Code, Table 1004.5 Maximum Floor Area Allowances per Occupant
Sources
- PSI: Louisiana contractor exam registration (LSLBC) (opens in a new tab)
- Louisiana State Licensing Board for Contractors (LSLBC) (opens in a new tab)
- PSI: Louisiana LSLBC Building Construction content outline (opens in a new tab)
- Louisiana State Uniform Construction Code Council (adopted codes) (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.