Iowa licensing exam

Iowa Journeyperson Sheet Metal Exam: Practice Test & Licensing Guide

The Kirkwood exam for an Iowa journeyperson sheet metal license: 75 open-book questions in 2 hours on duct systems, ventilation and venting. 75% to pass.

Questions
75
Time limit
2 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Worker Safety

A temporary guardrail system is tested before workers are allowed to lean on it while installing a rooftop duct. What minimum force must the top rail withstand, applied within 2 inches of its top edge in any outward or downward direction?

Requirements at a glance

AgencyIowa Plumbing and Mechanical Systems Board (PMSB); exam by Kirkwood Community College
Experience36 months of DOL apprenticeship (you may test up to 6 months before the 48 months of credit), or 4 years of experience before January 1, 2010
Exam75 questions, 2 hours, open book; 75% to pass
Books allowed2024 NFPA 54, 2024 IMC and SMACNA HVAC Duct Construction Standards (3rd ed., 2005)
Fees$119 to Kirkwood plus a $35 PMSB exam-candidate application per exam

Sheet metal workers applying to the Plumbing and Mechanical Systems Board for a journeyperson license: 36 months of DOL apprenticeship (you may test up to 6 months before the 48 months of credit), or 4 years of experience before January 1, 2010.

How to get licensed, step by step

  1. Apply to the PMSB

    Submit the exam-candidate application and fee to the Plumbing and Mechanical Systems Board for approval.

    Iowa DIAL: plumbing and mechanical examination (opens in a new tab)

  2. Register with Kirkwood

    Register and pay Kirkwood for your exam, then test at one of about 16 Iowa community-college centers. Fees are non-refundable and non-transferable.

    Kirkwood: Iowa state discipline exams (opens in a new tab)

  3. Take the exam

    Bring your approved references and a battery-operated, non-programmable calculator. You need 75% to pass.

    Kirkwood: Iowa state discipline exams (opens in a new tab)

  4. Apply for your license

    After you pass, send the Board a post-examination licensure application. If you fail, register and pay for a new exam (Kirkwood, 319-398-1022).

    Iowa DIAL: plumbing and mechanical examination (opens in a new tab)

How to prepare

  • Kirkwood's outlines say questions are based on the listed edition, but you may bring any edition. Iowa adopted the 2024 UPC and 2024 IMC with amendments effective March 26, 2025.
  • Code books may be bound or loose-leaf. Photocopies, handwritten notes and sticky notes are not allowed; highlighting and permanent tabs are.
  • The exam is open book, so tab each chapter and practice finding answers fast.
  • Supply and return duct systems (16%) and duct materials (13%) lead the outline. Practice duct sizing, gauge and reinforcement tables, hood and exhaust rules, and plan reading.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from NFPA 54 and the 2024 IMC and SMACNA duct standards. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • 2024 NFPA 54 National Fuel Gas Code
  • 2024 International Mechanical Code (IMC), ICC, with Iowa amendments (481 IAC 426)
  • SMACNA HVAC Duct Construction Standards, 3rd edition (2005)

What's on the exam

Official content outline from Kirkwood Community College (number of questions per topic):

TopicQuestions
Principles and Terminology4
Worker Safety8
Duct System Materials13
Combustion Air5
Exhaust Systems11
Fresh Air and Ventilation11
Grease Hoods9
Supply and Return Duct Systems16
Appliance Venting9
Testing, Adjusting and Balancing3
Plan Reading and Analysis11

The outline totals 100; the other items on the 75-question exam are unscored or unassigned.

Exam day details

  • Administered by Kirkwood Community College for the Iowa Plumbing and Mechanical Systems Board (PMSB).
  • Fee: $119 to Kirkwood per exam, plus a $35 PMSB exam-candidate application per exam. Exam fees are non-refundable and non-transferable.
  • 75 questions in 2 hours (Journeyperson Sheet Metal); 75% to pass.
  • Iowa adopted the 2024 IMC with amendments (481 IAC 426), effective March 26, 2025.
  • Open book: bring the references listed. Code books may be bound or loose-leaf; photocopies are not allowed. You may highlight and add permanent tabs before the exam, but handwritten notes in the books are not allowed and sticky notes are not accepted.
  • Exam questions are based on the listed edition, but the books you bring may be any edition.
  • You may bring an architect's scale or rule and a battery-operated, non-programmable calculator with no printing capability.
  • Kirkwood tests at about 16 Iowa community-college centers. Pass with 75%; then send the PMSB a post-examination licensure application. If you fail you must register and pay for a new exam.

Frequently asked questions

What's on the Iowa journeyperson sheet metal exam?

75 questions: supply and return duct systems 16%, duct system materials 13%, exhaust systems 11%, fresh air and ventilation 11%, plan reading and analysis 11%, grease hoods 9%, appliance venting 9%, worker safety 8%, combustion air 5%, principles and terminology 4% and testing, adjusting and balancing 3%.

Which books are allowed?

The 2024 NFPA 54, the 2024 IMC and the SMACNA HVAC Duct Construction Standards (3rd edition, 2005).

What does it cost?

$119 to Kirkwood, plus a $35 PMSB exam-candidate application per exam.

Free questions with answers

Show all 10 free questions and answers
  1. A temporary guardrail system is tested before workers are allowed to lean on it while installing a rooftop duct. What minimum force must the top rail withstand, applied within 2 inches of its top edge in any outward or downward direction?

    Answer: At least 200 pounds

    1926.502(b)(3) requires guardrail systems to withstand at least 200 pounds of force applied within 2 inches of the top edge, outward or downward. Midrails and intermediate members have a lower required load (150 pounds), which is a tempting wrong answer.

    Reference: 29 CFR 1926, 1926.502(b)(3)

  2. Which description matches makeup air as defined in the 2024 IMC?

    Answer: Any combination of outdoor and transfer air intended to replace exhaust air and exfiltration

    Makeup air replaces exhaust air and exfiltration, and it can come from outdoors or from transfer air. Transfer air alone is the air moved from one indoor space to another, and return air is air removed from a conditioned space to be recirculated or exhausted.

    Reference: 2024 International Mechanical Code, Section 202, definitions of Air, Makeup and Air, Transfer

  3. What is the minimum thickness of steel (not stainless) used to build a commercial kitchen grease duct, other than a listed factory-built duct?

    Answer: 0.0575 inch (No. 16 gage)

    Section 506.3.1 requires grease ducts of steel not less than 0.0575 inch (No. 16 gage) or stainless steel not less than 0.0450 inch (No. 18 gage). The 0.0466-inch No. 18 gage figure is the Type I hood thickness in 507.2.3, which is a common mix-up.

    Reference: 2024 International Mechanical Code, 506.3.1

  4. An exhaust duct that conveys other product-conveying vapors terminates outdoors. Which set of minimum distances matches the code?

    Answer: 10 feet from property lines, 3 feet from exterior walls and roofs, 10 feet from operable openings and 10 feet above adjoining grade

    Section 501.3.1 lists the minimum distances for other product-conveying outlets: 10 feet from property lines, 3 feet from exterior walls and roofs, 10 feet from operable openings into buildings and 10 feet above adjoining grade. The 30-foot property line distance is for ducts conveying explosive or flammable vapors, fumes or dusts.

    Reference: 2024 International Mechanical Code, 501.3.1

  5. A 2,000 sq ft office space is designed using Table 403.3.1.1 (default occupant density 5 per 1,000 sq ft, 5 cfm per person and 0.06 cfm per sq ft). What is the breathing zone outdoor airflow rate Vbz?

    Answer: 170 cfm

    Occupants = 5 x 2 = 10 people. Vbz = Rp x Pz + Ra x Az = 5 x 10 + 0.06 x 2,000 = 50 + 120 = 170 cfm. The 50 and 120 cfm values are the people-only and area-only parts, and 220 cfm results from using 50 people.

    Reference: 2024 International Mechanical Code, 403.3.1.1.1.1 and Table 403.3.1.1

  6. A gas-fired furnace of 100,000 Btu/h and a gas-fired water heater of 40,000 Btu/h share a room that will use indoor air only. Using the standard method, what is the minimum required room volume?

    Answer: 7,000 cubic feet

    The standard method requires 50 cubic feet per 1,000 Btu/h of input. Total input = 100,000 + 40,000 = 140,000 Btu/h, so volume = 140 x 50 = 7,000 cubic feet. Counting only the furnace gives 5,000, and 100 cubic feet per 1,000 Btu/h would give 14,000.

    Reference: NFPA 54 (2024), 9.3.2.1

  7. How many sheet metal screws or rivets are the minimum required to mechanically fasten a round metallic duct joint?

    Answer: Three, spaced equally around the joint

    Section 603.4.1 requires round metallic ducts to be mechanically fastened by at least three screws or rivets equally spaced around the joint. Where part of the joint is inaccessible, three fasteners are spaced equally on the exposed portion to prevent a hinge effect.

    Reference: 2024 International Mechanical Code, 603.4.1

  8. A gas vent system is being installed. Which statement about venting through ducts or plenums is correct?

    Answer: Venting systems must not extend into or pass through any fabricated air duct or furnace plenum

    Venting systems are not permitted to extend into or through fabricated air ducts or furnace plenums. Wrapping the vent or increasing the clearance does not make this arrangement acceptable.

    Reference: NFPA 54 (2024), 12.4.5.1

  9. An exhaust duct under positive pressure is routed from a laboratory. Which rule applies to where it may run?

    Answer: It may not extend into or pass through ducts or plenums, subject to the listed exceptions

    Section 601.4 states that exhaust ducts under positive pressure, chimneys and vents shall not extend into or pass through ducts or plenums, with exceptions such as certain exhaust in ceiling plenums that comply with 603.9 sealing. Insulation, thicker steel or mastic alone does not create a permission.

    Reference: 2024 International Mechanical Code, 601.4

  10. On a duct layout drawn at 3/16 inch = 1 foot, a return main measures 6-3/4 inches. What is its actual length?

    Answer: 36 feet

    At 3/16 inch = 1 foot, divide the measured length by the scale: 6.75 / 0.1875 = 36 feet. Using 1/4 inch = 1 foot gives 27 feet, using 1/8 inch = 1 foot gives 54, and halving the result gives 18.

    Reference: General sheet metal practice, Plan reading: architectural scales

Sources

Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.