Requirements at a glance
| Agency | Iowa Plumbing and Mechanical Systems Board (PMSB); exam by Kirkwood Community College |
|---|---|
| Experience | 36 months of DOL apprenticeship (you may test up to 6 months before the 48 months of credit), or 4 years of experience before January 1, 2010 |
| Exam | 75 questions, 2 hours, open book; 75% to pass |
| Books allowed | 2024 IMC, 2024 NFPA 54, Boiler Operator's Guide (4th ed.) and Steam Plant Operation (8th ed.) |
| Fees | $119 to Kirkwood plus a $35 PMSB exam-candidate application per exam |
Hydronics and boiler workers applying to the Plumbing and Mechanical Systems Board for a journeyperson license: 36 months of DOL apprenticeship (you may test up to 6 months before the 48 months of credit), or 4 years of experience before January 1, 2010.
Official links
How to get licensed, step by step
Apply to the PMSB
Submit the exam-candidate application and fee to the Plumbing and Mechanical Systems Board for approval.
Iowa DIAL: plumbing and mechanical examination (opens in a new tab)
Register with Kirkwood
Register and pay Kirkwood for your exam, then test at one of about 16 Iowa community-college centers. Fees are non-refundable and non-transferable.
Take the exam
Bring your approved references and a battery-operated, non-programmable calculator. You need 75% to pass.
Apply for your license
After you pass, send the Board a post-examination licensure application. If you fail, register and pay for a new exam (Kirkwood, 319-398-1022).
Iowa DIAL: plumbing and mechanical examination (opens in a new tab)
How to prepare
- Kirkwood's outlines say questions are based on the listed edition, but you may bring any edition. Iowa adopted the 2024 UPC and 2024 IMC with amendments effective March 26, 2025.
- Code books may be bound or loose-leaf. Photocopies, handwritten notes and sticky notes are not allowed; highlighting and permanent tabs are.
- The exam is open book, so tab each chapter and practice finding answers fast.
- General code (18%), fuels and firing methods (17%), piping, pumps and valving (16%) and controls (16%) lead the outline. Know boiler trim, burner types and combustion, and low-water cutoffs.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2024 IMC and NFPA 54 and the Boiler Operator's Guide and Steam Plant Operation. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2024 International Mechanical Code (IMC), ICCEssential
Iowa's mechanical code (481 IAC 426) with Iowa amendments, effective March 26, 2025.
2024 NFPA 54 National Fuel Gas CodeEssential
Iowa's mechanical amendments point to NFPA 54 and NFPA 58 instead of the IFGC for fuel gas.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Boiler Operator's Guide, 4th editionEssential
Listed in Kirkwood's hydronics references (Anthony Kohan, McGraw-Hill). Kirkwood allows any edition in the exam room.
Steam Plant Operation, 8th editionEssential
Listed in Kirkwood's hydronics references (Woodruff, Lammers and Lammers, McGraw-Hill). Kirkwood allows any edition in the exam room; McGraw-Hill now sells the 10th edition.
Official reference list (as published by the testing agency)
- 2024 International Mechanical Code (IMC), ICC, with Iowa amendments (481 IAC 426)
- 2024 NFPA 54 National Fuel Gas Code
- Boiler Operator's Guide, 4th edition
- Steam Plant Operation, 8th edition
What's on the exam
Official content outline from Kirkwood Community College (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Water Supply Treat and Feed | 7 | |
| Fuels and Firing Methods | 17 | |
| General Code | 18 | |
| Piping, Pumps, Valving | 16 | |
| Controls and Control Systems | 16 | |
| Maintenance and Repairs | 8 | |
| Tests and Inspections | 7 | |
| Refrigeration and Turbines | 11 |
The outline totals 100; the other items on the 75-question exam are unscored or unassigned.
Exam day details
- Administered by Kirkwood Community College for the Iowa Plumbing and Mechanical Systems Board (PMSB).
- Fee: $119 to Kirkwood per exam, plus a $35 PMSB exam-candidate application per exam. Exam fees are non-refundable and non-transferable.
- 75 questions in 2 hours (Journeyperson Hydronics with Gas); 75% to pass.
- Iowa adopted the 2024 IMC with amendments (481 IAC 426), effective March 26, 2025; fuel gas references are NFPA 54 and NFPA 58 (current edition).
- Open book: bring the references listed. Code books may be bound or loose-leaf; photocopies are not allowed. You may highlight and add permanent tabs before the exam, but handwritten notes in the books are not allowed and sticky notes are not accepted.
- Exam questions are based on the listed edition, but the books you bring may be any edition.
- You may bring an architect's scale or rule and a battery-operated, non-programmable calculator with no printing capability.
- Kirkwood tests at about 16 Iowa community-college centers. Pass with 75%; then send the PMSB a post-examination licensure application. If you fail you must register and pay for a new exam.
Frequently asked questions
What's on the Iowa journeyperson hydronics exam?
75 questions: general code 18%, fuels and firing methods 17%, piping, pumps and valving 16%, controls and control systems 16%, refrigeration and turbines 11%, maintenance and repairs 8%, water supply treatment and feed 7% and tests and inspections 7%.
Which books are allowed?
The 2024 IMC, 2024 NFPA 54, Boiler Operator's Guide (4th edition) and Steam Plant Operation (8th edition).
What does it cost?
$119 to Kirkwood, plus a $35 PMSB exam-candidate application per exam.
Free questions with answers
Show all 10 free questions and answers
A hot water heating boiler with no manhole on top is being installed. It is not a high-pressure steam boiler and has 3,000,000 Btu/h input and 600 square feet of heating surface. What is the minimum clearance from the top of the boiler to the ceiling?
Answer: 2 feet
Table 1004.3.1 sets 2 feet for boilers without a top manhole, other than high-pressure steam boilers, unless another row requires more. Input is under 5,000,000 Btu/h and heating surface is under 1,000 square feet, so no row raises the figure to 3 feet. Seven feet applies only to large high-pressure steam boilers.
Reference: 2024 International Mechanical Code, Table 1004.3.1
A project has three modular boilers piped into one hot water loop. Which valves does the IMC require?
Answer: An individual shutoff valve in the supply and in the return piping of each boiler
Section 1005.1 requires a shutoff valve in the supply and return piping of every boiler or modular boiler, and for multiple boiler installations each boiler gets its own supply and return shutoff valves.
Reference: 2024 International Mechanical Code, Section 1005.1
For which installation does the IMC waive the supply and return shutoff valves at the boiler?
Answer: A system with a single low-pressure steam boiler
The exception to Section 1005.1 applies only to a system having a single low-pressure steam boiler. Hot water boilers, and multiple-boiler steam systems, still need the valves.
Reference: 2024 International Mechanical Code, Section 1005.1, exception
In a boiler control circuit, which of these arrangements does Section 1006.8 require?
Answer: Control and limit devices interrupting the ungrounded side, with a lockable manual disconnect for the control circuit
Section 1006.8 requires control and limit devices to interrupt the ungrounded side of the circuit, a manual means of disconnecting the control circuit so the burner is inoperative when deenergized, and a disconnect that can be locked in the off position with ready access.
Reference: 2024 International Mechanical Code, Section 1006.8
What is the minimum cover for an underground gas piping run that is not subject to external damage, and is not run in conduit?
Answer: 12 inches
NFPA 54 7.1.2 (Protection Against Damage) requires a minimum of 12 inches of cover for underground piping. The cover is increased to 18 inches only where external damage to the pipe is likely, and where 12 inches cannot be provided the piping must be installed in conduit.
Reference: NFPA 54 (2024), Section 7.1.2
A galvanized steel gas line is to be buried with no other protection. How does NFPA 54 treat this?
Answer: Zinc coating is not adequate protection for underground gas piping
NFPA 54 section 7.1.3.1 says zinc coating (galvanizing) is not deemed adequate protection for underground gas piping. Steel must have coatings or cathodic protection as 7.1.3.2 describes.
Reference: NFPA 54 (2024), Section 7.1.3.1
The makeup water supplied to a hydronic system must be considered when choosing the transfer fluid. What does the IMC require?
Answer: That the transfer fluid be compatible with the makeup water
Section 1207.2 says the transfer fluid shall be compatible with the makeup water supplied to the system, so a glycol inhibitor package, for example, is not diluted or upset.
Reference: 2024 International Mechanical Code, Section 1207.2
Where a storage water heater is installed and leaks would cause damage, what does the IMC require?
Answer: A pan of galvanized steel, aluminum or approved plastic
Section 1002.4 requires a pan wherever water leakage from the tank would cause damage. Galvanized steel or aluminum must be at least 0.0236 inch thick, and plastic at least 0.036 inch with the stated flame spread and smoke ratings.
Reference: 2024 International Mechanical Code, Section 1002.4
A closed-loop hydronic heating system has a maximum design pressure of 85 psi. At what minimum pressure is the hydrostatic test run under Section 1208.1?
Answer: 127.5 psi for at least 15 minutes
Section 1208.1 requires 1.5 times the maximum design pressure, but not less than 100 psi, held at least 15 minutes. 85 x 1.5 = 127.5 psi, which is above the 100 psi floor. Using 2 times gives 170 psi; using only the 100 psi floor ignores the multiplier.
Reference: 2024 International Mechanical Code, Section 1208.1
Where must pressure relief devices from a refrigerant machinery room discharge under the IMC?
Answer: Outside, at least 15 feet above grade and 20 feet from any window or opening
Section 1105.7 requires relief devices, fusible plugs and purge systems in the machinery room to terminate outside the structure at least 15 feet above grade and at least 20 feet from any window, ventilation opening or exit.
Reference: 2024 International Mechanical Code, Section 1105.7
Sources
- Kirkwood Community College: Iowa state discipline exams, outlines and references (opens in a new tab)
- Iowa DIAL: plumbing and mechanical examination (opens in a new tab)
- Iowa Administrative Code 481-429 (PMSB licensing and examination rules) (opens in a new tab)
Questions last verified November 10, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.