Illinois licensing exam

Chicago Concrete Masonry Contractor Exam (C Card): Practice Test & Licensing Guide

Practice for the City of Chicago concrete masonry contractor (C card) written exam given by CTS: 3 hours on concrete materials, methods, reinforcing steel, tools, estimating, formwork and safety. 70 to pass, closed book.

Questions
Not published by Illinois
Time limit
3 hours
Passing score
70%
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Concrete Materials

A concrete footing will bear on soil that tests high in sulfates. Which portland cement type under ASTM C150 is made for high sulfate resistance?

Requirements at a glance

AgencyCity of Chicago Department of Buildings; exam by Continental Testing Services (CTS)
EligibilityAge 21; C card for Concrete Masonry Contractors. Passing both B and C card exams may qualify you for the A card
ExamWritten exam timed at 3 hours, 70 to pass; question count not published
Book allowedClosed book: no books, notes or references; bring a non-programmable, non-printing calculator
Fee$150 (CTS); not refundable

Masonry contractors applying to the City of Chicago for a Concrete Masonry Contractor license (C card). Candidates must be 21. Passing both the B and C card exams may qualify you for the Masonry Contractor A card.

How to get licensed, step by step

  1. Apply with the City

    Return the application with supporting documents and fees (check or money order to the City of Chicago) by the deadline for your exam date.

    Continental Testing Services: City of Chicago exams (opens in a new tab)City of Chicago Department of Buildings: trade licenses (opens in a new tab)

  2. Register and pay

    There are no make-up exams and no refunds; a missed exam is re-registered for the next date.

    Continental Testing Services: City of Chicago exams (opens in a new tab)

  3. Study the CTS references

    Masonry Skills, the PCA Concrete Masonry Handbook, 29 CFR 1926, ASTM C94, Formwork for Concrete, Design and Control of Concrete Mixtures and Placing Reinforcing Bars.

    Continental Testing Services: City of Chicago exams (opens in a new tab)

  4. Pass with 70

    A pass notice includes the licensure application.

    Continental Testing Services: City of Chicago exams (opens in a new tab)

How to prepare

  • CTS does not publish a question count, so our test length is a practice setting only.
  • Reinforcing and installing steel (20%) and concrete methods (18%) are the largest topics; materials and tools are 14% each, estimating and safety 12% each, formwork 11%.
  • Closed book: practice the estimating by hand with a basic calculator.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

  • Kreh, Masonry Skills, 7th Edition (2015)Essential

    CTS reference for both the B and C card exams.

  • Concrete Masonry Handbook for Architects, Engineers and Builders, 6th Edition (2008)

    PCA handbook; a CTS reference for both masonry exams.

Official reference list (as published by the testing agency)
  • Kreh, Masonry Skills, 7th Edition (2015)
  • Panarese, Kosmatka and Randall, Concrete Masonry Handbook for Architects, Engineers and Builders, 6th Edition (2008)
  • 29 CFR 1926 (OSHA construction standards)
  • ASTM C94/C94M, Standard Specification for Ready-Mixed Concrete
  • Johnston, Formwork for Concrete, 8th Edition (2014)
  • Wilson and Tennis, Design and Control of Concrete Mixtures, 17th Edition (2021)
  • Collins, Panarese and Bradley, Concrete Finishers's Guide (2006)
  • Placing Reinforcing Bars, 10th Edition (2018), CRSI

What's on the exam

Official content outline from Continental Testing Services (CTS) (number of questions per topic):

TopicQuestions
Concrete Materials14
Concrete Methods & Installations18
Reinforcing & Installing Steel20
Concrete Tools, Equipment & Fasteners14
Quantity Surveying & Estimating12
Formwork11
Safety, Inspection & Quality Control12

The outline totals 101; the other items on the 100-question exam are unscored or unassigned.

Exam day details

  • Administered by Continental Testing Services (CTS) for the City of Chicago Department of Buildings.
  • Fee: $150
  • The written exam is timed at 3 hours; 70 to pass. CTS does not publish the number of questions, so our length is a practice setting only.
  • Closed book: CTS says candidates may not use books, notes or other references. Bring two No. 2 pencils and a non-programmable, non-printing calculator.
  • Topic weights are the percentages printed in CTS's guide (they add to 101%). Reinforcing and installing steel (20%) and concrete methods (18%) are the largest.
  • CTS exam fee is $150, not refundable; there are no make-up exams, and a missed exam is re-registered for the next date.

Note: CTS does not publish the question count, so our length is an estimate. The exam time, 70 pass mark, closed-book rule and topic weights are from CTS's guide.

Frequently asked questions

How many questions are on the Chicago concrete masonry exam?

CTS does not publish a question count. The exam is timed at 3 hours with 70 to pass.

Is the C card exam open book?

No. CTS's guide says candidates may not use books, notes or other reference materials.

What books does CTS recommend?

Masonry Skills, the Concrete Masonry Handbook and 29 CFR 1926 for both cards, plus ASTM C94, Formwork for Concrete, Design and Control of Concrete Mixtures, the Concrete Finishers's Guide and Placing Reinforcing Bars for the C card.

Free questions with answers

Show all 10 free questions and answers
  1. A concrete footing will bear on soil that tests high in sulfates. Which portland cement type under ASTM C150 is made for high sulfate resistance?

    Answer: Type V

    ASTM C150 Type V is the high sulfate-resistant cement. Type I is the general-purpose cement, Type III gives high early strength, and Type IV is the low-heat type used in massive pours. Type II is the moderate sulfate-resistance cement, so it would be the wrong pick for a high-sulfate exposure.

    Reference: Design and Control of Concrete Mixtures, 17th Edition (Wilson and Tennis), Concept: types of portland cement (ASTM C150)

  2. A precast yard must strip forms and move units after about one day in cool weather. Which portland cement type is made for high early strength?

    Answer: Type III

    Type III is ground finer and reacts faster, so it develops strength sooner; it also gives off more heat. Type II is moderate-sulfate and moderate-heat, Type IV is slow, low-heat cement for mass concrete, and Type V is for sulfate exposure; none is chosen for speed.

    Reference: Design and Control of Concrete Mixtures, 17th Edition (Wilson and Tennis), Concept: types of portland cement (ASTM C150)

  3. What condition should the subgrade be in just before slab concrete is placed on it?

    Answer: Compacted, uniformly firm and slightly damp, with no standing water or frozen soil

    A uniform, compacted subgrade prevents differential settlement and cracking. A slightly damp surface will not rob the mix of water, but puddles weaken the bottom of the slab, and concrete must never be placed on frozen ground because it thaws and settles under the slab. Loose soil settles unevenly.

    Reference: Design and Control of Concrete Mixtures, 17th Edition (Wilson and Tennis), Concept: subgrade and subbase preparation for slabs

  4. Under an interior slab that will receive a floor covering, a polyethylene sheet is often placed over the granular base. What is its main job?

    Answer: It slows moisture vapor rising from the ground into the slab

    A vapor retarder limits moisture moving up from the soil, which protects flooring and adhesives. It breaks bond and adds no structural strength, and it slows rather than speeds drainage through the base.

    Reference: Concrete Finisher's Guide (Collins, Panarese and Bradley), Concept: slab-on-ground preparation and vapor retarders

  5. Which reinforcing bar specification is intended for bars that will be welded?

    Answer: ASTM A706, low-alloy weldable bars

    A706 bars have controlled chemistry for welding. A615 bars are not weldable without special procedures and preheat per the welding code, and A775 refers to epoxy coating. A185 covers welded wire reinforcement, not bars.

    Reference: Placing Reinforcing Bars, 10th Edition (CRSI), Concept: reinforcing bar specifications and welding

  6. A foundation wall is cast in forms, and the formed face will be exposed to earth after backfilling. Using usual structural cover requirements, which minimum cover applies to No. 6 and larger bars on that face?

    Answer: 2 inches

    Formed concrete exposed to earth or weather has 2 inches of cover for No. 6 through No. 18 bars and 1-1/2 inches for No. 5 and smaller. 3 inches is for concrete cast directly against the soil, and 3/4 inch is for interior surfaces not exposed to weather. (The IRC footing and stem wall cover rule restates these ACI values.)

    Reference: Placing Reinforcing Bars, 10th Edition (CRSI), Concept: minimum concrete cover for reinforcement

  7. A threaded rod will be set in a drilled hole in hardened concrete with an adhesive anchor. Which step is most important to a reliable anchor?

    Answer: Clean the hole of dust with brushing and blowing before injecting the adhesive

    Dust in the hole acts as a bond breaker and sharply lowers the holding value of an adhesive anchor, so hole cleaning per the manufacturer's instructions is critical. Water and an oversized hole both reduce bond.

    Reference: Concrete Masonry Handbook, 6th Edition (Panarese et al.), Concept: anchors and fasteners in concrete

  8. A foundation wall is 48 ft long, 6 ft high and 10 inches thick. Adding 6 percent for waste, how many cubic yards should be ordered (nearest 0.1)?

    Answer: 9.4 cubic yards

    10 in = 0.833 ft. Volume = 48 x 6 x 0.833 = 240 cu ft; 240 / 27 = 8.89 cu yd; x 1.06 = 9.42, or 9.4 cu yd. 8.9 leaves out the waste, 9.5 divides by 0.94 instead of multiplying by 1.06, and 24.0 is a unit slip.

    Reference: General trade practice, General trade practice: wall volume with waste allowance

  9. Fresh concrete weighs about 150 pounds per cubic foot and acts like a fluid on a wall form. What is the full fluid pressure at the bottom of a form filled to a depth of 4 feet?

    Answer: 600 pounds per square foot

    Fluid pressure = unit weight x depth = 150 x 4 = 600 psf. 150 psf forgets the depth, 37.5 psf divides by the depth, and 2,400 psf squares the depth (150 x 16). In practice the pressure is capped by rate of placement and temperature, but the full liquid head is the upper bound.

    Reference: Formwork for Concrete, 8th Edition (Johnston), Concept: lateral pressure of concrete on formwork

  10. Under 29 CFR 1926.701(b), what must be done with protruding reinforcing steel that employees could fall onto?

    Answer: Guard it to eliminate the impalement hazard

    1926.701(b) requires all protruding reinforcing steel onto and into which employees could fall to be guarded against impalement, typically with rebar caps, troughs or by bending the ends in a way that removes the hazard. Paint or signs do not remove the hazard.

    Reference: 29 CFR Part 1926, 1926.701(b)

Sources

Questions last verified November 13, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.