Requirements at a glance
| Agency | City of Chicago Department of Buildings; exam by Continental Testing Services (CTS) |
|---|---|
| Eligibility | Age 21; B card for Brick Masonry Contractors. Passing both B and C card exams may qualify you for the A card |
| Exam | Written exam timed at 3 hours, 70 to pass; question count not published |
| Book allowed | Closed book: no books, notes or references; bring a non-programmable, non-printing calculator |
| Fee | $150 (CTS); not refundable |
Masonry contractors applying to the City of Chicago for a Brick Masonry Contractor license (B card). Candidates must be 21. Passing both the B and C card exams may qualify you for the Masonry Contractor A card.
Official links
How to get licensed, step by step
Apply with the City
Return the application with supporting documents and fees (check or money order to the City of Chicago) by the deadline for your exam date.
Continental Testing Services: City of Chicago exams (opens in a new tab)City of Chicago Department of Buildings: trade licenses (opens in a new tab)
Register and pay
There are no make-up exams and no refunds; a missed exam is re-registered for the next date.
Continental Testing Services: City of Chicago exams (opens in a new tab)
Study the CTS references
Kreh's Masonry Skills, the PCA Concrete Masonry Handbook and 29 CFR 1926.
Continental Testing Services: City of Chicago exams (opens in a new tab)
Pass with 70
A pass notice includes the licensure application.
Continental Testing Services: City of Chicago exams (opens in a new tab)
How to prepare
- CTS does not publish a question count, so our test length is a practice setting only.
- Masonry installations (25%) and safety regulations (23%) are the largest topics; materials is 17%, tools 14%, estimating and business math 11% each.
- Closed book: practice the estimating and business math by hand with a basic calculator.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
Kreh, Masonry Skills, 7th Edition (2015)Essential
CTS reference for both the B and C card exams.
Concrete Masonry Handbook for Architects, Engineers and Builders, 6th Edition (2008)
PCA handbook; a CTS reference for both masonry exams.
Official reference list (as published by the testing agency)
- Kreh, Masonry Skills, 7th Edition (2015)
- Panarese, Kosmatka and Randall, Concrete Masonry Handbook for Architects, Engineers and Builders, 6th Edition (2008)
- 29 CFR 1926 (OSHA construction standards)
What's on the exam
Official content outline from Continental Testing Services (CTS) (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Masonry Materials | 17 | |
| Masonry Installations | 25 | |
| Masonry Tools, Equipment & Fasteners | 14 | |
| Quantity Surveying & Estimating | 11 | |
| Business Math | 11 | |
| Safety Regulations | 23 |
The outline totals 101; the other items on the 100-question exam are unscored or unassigned.
Exam day details
- Administered by Continental Testing Services (CTS) for the City of Chicago Department of Buildings.
- Fee: $150
- The written exam is timed at 3 hours; 70 to pass. CTS does not publish the number of questions, so our length is a practice setting only.
- Closed book: CTS says candidates may not use books, notes or other references. Bring two No. 2 pencils and a non-programmable, non-printing calculator.
- Topic weights are the percentages printed in CTS's guide (they add to 101%). Masonry installations (25%) and safety regulations (23%) are the largest.
- CTS exam fee is $150, not refundable; there are no make-up exams, and a missed exam is re-registered for the next date.
Note: CTS does not publish the question count, so our length is an estimate. The exam time, 70 pass mark, closed-book rule and topic weights are from CTS's guide.
Frequently asked questions
How many questions are on the Chicago brick masonry exam?
CTS does not publish a question count. The exam is timed at 3 hours with 70 to pass.
Is the B card exam open book?
No. CTS's guide says candidates may not use books, notes or other reference materials.
What is the difference between the B card and C card?
The B card licenses brick masonry contractors and the C card licenses concrete masonry contractors. Passing both may qualify you for the A card.
Free questions with answers
Show all 10 free questions and answers
Which of the four mortar types M, N, O and S is the weakest in compressive strength, so that it is limited to non-loadbearing work not subject to freezing while saturated?
Answer: Type O, with a minimum strength of about 350 psi
The ASTM C270 property-specification strengths are M 2,500 psi, S 1,800 psi, N 750 psi, O 350 psi and K 75 psi. Of M, N, O and S, Type O is lowest. It is used for non-loadbearing walls (typically interior, or exterior where not exposed to freezing when wet).
Reference: ASTM C270 (Mortar for Unit Masonry), Table of property specification, minimum compressive strength by type
Mortar on the board has dried out and lost its workability but has not yet begun to stiffen from cement hydration. What is the accepted way to restore it?
Answer: Add water to replace what evaporated, remix, and use it within the time limit
Retempering with water to replace evaporation loss is allowed so long as the mortar is still plastic and inside the use-time limit (about 2-1/2 hours). Mortar that has begun to harden by hydration must be discarded. Adding cement changes the mix proportions, and calcium chloride corrodes embedded metal.
Reference: ASTM C270 (Mortar for Unit Masonry), Retempering (Masonry Skills, mortar chapter)
When should a mason tool the mortar joints in a freshly laid wall?
Answer: When the mortar is thumbprint hard, firm enough that it leaves a clean print
Tooling too early smears the face and pulls out wet mortar. Too late and the joint will not compact and can leave color variations. The right moment is when thumb pressure leaves a print without sinking in.
Reference: Kreh, Masonry Skills, 7th Edition (2015), Tooling joints
A brick set on end with its long narrow face exposed in the wall is called a
Answer: Soldier
A soldier is stood vertically with the narrow side toward the face. A sailor is also on end but shows its wide (flat) face. A header lies flat showing its end, and a rowlock lies on its edge.
Reference: Kreh, Masonry Skills, 7th Edition (2015), Brick positions and bond terminology
Which hand tool is used to compress and shape the mortar in a joint after the brick is laid?
Answer: A jointer
A jointer (convex, V, or other profile) compresses the surface of the mortar and gives it a profile. A brick set cuts brick, a margin trowel is a small flat trowel for tight spots, and a plumb bob checks vertical.
Reference: Kreh, Masonry Skills, 7th Edition (2015), Jointing tools
Which tool snaps a straight reference line on a slab or wall by transferring chalk to the surface?
Answer: A chalk line
A chalk line is pulled taut and snapped to leave a straight line. It is used to lay out the first course and foundation locations.
Reference: Kreh, Masonry Skills, 7th Edition (2015), Layout tools
How many 16-inch-long nominal blocks make up one course of a wall that is 48 feet long?
Answer: 36 blocks
48 ft x 12 = 576 in. 576 / 16 = 36 blocks. Dividing by 8-inch courses or counting by feet gives other numbers.
Reference: Panarese et al., Concrete Masonry Handbook, 6th Edition (2008), Coursing and modular dimensions
A crew of 4 masons each lay 150 bricks an hour for an 8-hour day. How many working days are needed to lay 9,000 bricks?
Answer: 2 days
Daily output = 4 x 150 x 8 = 4,800 bricks. 9,000 / 4,800 = 1.875, which rounds up to 2 working days.
Reference: CTS Chicago Masonry Contractors Candidate Guide (2025), B card content outline, V. Business Math (B card content outline)
Under OSHA's masonry rule, a limited access zone is required when a masonry wall is being built. For a wall to be 10 feet high, how far from the wall must the zone extend?
Answer: 14 feet, which is the wall height plus 4 feet
1926.706(a)(2) sets the zone at the wall height plus 4 feet and along the whole length of the wall: 10 + 4 = 14 ft.
Reference: 29 CFR 1926.706(a)(2), Limited access zone
A scaffold plank 8 feet long is used as a platform. How far may each end extend past its support?
Answer: Reach at least 6 inches over the support center and extend no more than 12 inches past it
1926.451(b)(4)-(5): each platform end must extend at least 6 inches over the centerline of its support, and for a platform 10 feet or less the overhang is limited to 12 inches unless designed to avoid tipping.
Reference: 29 CFR 1926.451(b)(4)-(5), Platform construction
Sources
- Continental Testing Services (CTS): City of Chicago exams (opens in a new tab)
- City of Chicago Department of Buildings: trade licenses (opens in a new tab)
- CTS: Chicago Masonry Contractors study guide (opens in a new tab)
Questions last verified November 13, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.