Requirements at a glance
| Agency | Idaho Division of Occupational and Professional Licenses (DOPL); exam by PSI |
|---|---|
| Exam | 50 questions, 2.5 hours, 75% to pass |
| Books allowed | 2015 Uniform Plumbing Code or 2017 Idaho State Plumbing Code |
| Fees | $75 per exam to PSI, plus DOPL license fees |
Installers applying to Idaho DOPL for a plumbing specialty journeyman license in the appliance category.
Official links
How to get licensed, step by step
Check your experience
Make sure you meet DOPL's requirements for the specialty journeyman license before you test.
Register and pay with PSI
Create a PSI account, pick the Idaho Plumbing Specialty Appliance Journeyman exam, pay the $75 fee and book a seat.
Schedule with PSI (Idaho contractor and trade exams) (opens in a new tab)
Pass the exam
Bring your tabbed UPC or ISPC and score 75% or higher.
Schedule with PSI (Idaho contractor and trade exams) (opens in a new tab)
Apply to DOPL
After you pass, apply through eDOPL.
DOPL online license application (eDOPL) (opens in a new tab)DOPL: plumbing licensing (opens in a new tab)
How to prepare
- Idaho is a UPC state. Don't study from IPC material.
- Water heaters (Chapter 5) are 20 of the 50 questions. Tab venting, relief valves, seismic strapping and garage installation, and read Idaho's amendments to 503.1 and 507.13.
- Administration (7), general regulations (7), definitions (6), water supply (5) and fuel gas piping (5) are the rest.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2015 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2015 Uniform Plumbing Code (UPC) or 2017 Idaho State Plumbing CodeEssential
Bring one. Idaho adopted the 2015 UPC with amendments as its plumbing code, so the numbering matches. Tab Chapters 5, 6, 7, 9 and 12 and the sizing tables.
IAPMO store (opens in a new tab)Read free (IAPMO) (opens in a new tab)
Official reference list (as published by the testing agency)
- 2015 Uniform Plumbing Code (UPC), IAPMO
- 2017 Idaho State Plumbing Code (ISPC): the 2015 UPC as adopted with Idaho amendments (IDAPA 24.39.20)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| ISPC Chapter 1: Administration | 7 | |
| ISPC Chapter 2: Definitions | 6 | |
| ISPC Chapter 3: General Regulations | 7 | |
| ISPC Chapter 5: Water Heaters | 20 | |
| ISPC Chapter 6: Water Supply and Distribution | 5 | |
| ISPC Chapter 12: Fuel Gas Piping | 5 |
Exam day details
- Administered by PSI Services for the Idaho Division of Occupational and Professional Licenses (DOPL).
- Fee: $75 per exam, paid to PSI when you schedule. The fee is good for one year, isn't refundable, and each retake costs it again. DOPL license application fees are separate.
- 50 questions in 2.5 hours; 75% to pass.
- Open book: bring your own 2015 UPC or 2017 Idaho State Plumbing Code. Idaho amends several water heater rules (for example venting tests in 503.1 and garage installation in 507.13), so read the amendments too.
- You may highlight, underline and add permanent tabs to your references, but not write in them. Sticky notes and loose papers aren't allowed.
- Your score shows on screen when you finish.
- Cancel or reschedule at least 2 days before your appointment to keep your fee.
Frequently asked questions
What's on the Idaho plumbing specialty appliance exam?
Per DOPL's December 2025 PSI bulletin, 50 questions: water heaters (Chapter 5) 20, administration 7, general regulations 7, definitions 6, water supply and distribution 5 and fuel gas piping 5.
Which code book do I bring?
The 2015 Uniform Plumbing Code or the 2017 Idaho State Plumbing Code (the 2015 UPC with Idaho amendments). Not the International Plumbing Code.
Free questions with answers
Show all 10 free questions and answers
The 2015 UPC sets minimum storage water heater capacity by first-hour rating in Table 501.1(1). How does Idaho's adoption rule treat that table?
Answer: Idaho deletes Table 501.1(1)
IDAPA 24.39.20.600 deletes Table 501.1(1), First Hour Rating, so the 2017 ISPC has no code-mandated minimum first-hour rating based on bedrooms and bathrooms. None of the other modifications appear in the amendment list.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 501.1 and Table 501.1(1), deleted by IDAPA 24.39.20.600
A homeowner hires you to swap an old water heater for a new one of the same size in the same spot. Under Section 502.1, is a permit required?
Answer: Yes, replacing a water heater requires a permit
Section 502.1 makes it unlawful to install, remove or replace a water heater, or cause it to be done, without first obtaining a permit from the AHJ. There is no like-for-like exemption for water heaters.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 502.1, General (Permits)
Which detail of a T&P relief discharge pipe meets Section 608.5?
Answer: Full size of the valve outlet, ending unthreaded and pointing down
Section 608.5 requires relief discharge piping to be equal to the size of the valve outlet and run full size, with no valves, obstructions or means of isolation, a terminal end that is not threaded, and the outlet pointing down. Reducing, capping or valving the line is prohibited.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 608.5, Discharge Piping
Who does Section 102.3 make responsible for maintaining the plumbing system, including water heater safety devices, in a building?
Answer: The owner or the owner's designated agent
Section 102.3 requires existing and new plumbing systems to be maintained in a sanitary and safe operating condition, with required devices and safeguards maintained under the code edition in which they were installed, and makes the owner or the owner's designated agent responsible. The AHJ may reinspect to check compliance but is not responsible for maintenance.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 102.3, Maintenance
A retail store is converted to a restaurant, a change of occupancy under the building code. Under Section 102.6, which plumbing requirements apply?
Answer: Those applicable to the new use or occupancy
Section 102.6 says plumbing systems in a building undergoing a change in use or occupancy must comply with the code requirements applicable to the new use or occupancy. Grandfathering under 102.2 does not carry over to a new occupancy.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 102.6, Changes in Building Occupancy
A gas shutoff valve for a water heater is behind a screwed-on access panel. How does Chapter 2 classify the valve?
Answer: Accessible, but not readily accessible
Chapter 2 defines 'accessible' as having access that may first require removing an access panel, door or similar obstruction, while 'readily accessible' means direct access without removing a panel, door or similar obstruction. A valve behind a screwed panel is accessible but not readily accessible.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 203.0, Definitions: Accessible; Accessible, Readily
A sealed-combustion water heater takes all combustion air directly from outdoors through one pipe and sends flue gases outdoors through another. What does Chapter 2 call this type of appliance?
Answer: Direct-vent appliance
Chapter 2 defines direct-vent appliances as appliances constructed and installed so that air for combustion is derived directly from the outdoors and flue gases are discharged to the outdoors. A mechanical draft appliance uses a fan to produce draft but is not defined by where its combustion air comes from, and a draft-hood appliance takes combustion air from the room.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 206.0, Definitions: Direct-Vent Appliances
An ABS drain line from a water heater pan runs outside where it is exposed to direct sunlight. What protection does Section 312.13 accept?
Answer: Water-based synthetic latex paint
Section 312.13 prohibits exposing ABS piping to direct sunlight, except where it is protected by water-based synthetic latex paints. The other coatings are not listed; unprotected ABS is not allowed in sunlight.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 312.13, Exposed ABS Piping
Hubless cast-iron drain pipe with shielded couplings runs horizontally, with pieces longer than 4 feet between couplings. Under Table 313.3, how often must it be supported horizontally?
Answer: At every joint
Table 313.3 says horizontal hubless cast iron is supported every other joint, unless the pipe between joints is over 4 ft, in which case each joint is supported. With pieces longer than 4 ft, support is required at every joint. 15 ft is the vertical cast-iron limit.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Table 313.3, Hangers and Supports
An old gas water heater is removed and will not be replaced right away. Under Section 1210.9.1, what must be done with the gas outlet?
Answer: Cap or plug it gastight
Section 1210.9.1 requires each outlet, including a valve, to be closed gastight with a threaded plug or cap; where an appliance is disconnected and the outlet will not be used again immediately, it must be capped or plugged gastight. A closed valve with an open end or tape is not acceptable.
Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 1210.9.1, Cap Outlets
Sources
- Idaho DOPL: Combined PSI Candidate Bulletin (effective 12.10.2025, PDF) (opens in a new tab)
- Idaho DOPL: Plumbing licensing (opens in a new tab)
- PSI: Idaho contractor and trade exams (candidate bulletins) (opens in a new tab)
Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.