Idaho licensing exam

Idaho Plumbing Contractor Exam: Practice Test & Licensing Guide

Idaho's plumbing contractor exam, given by PSI: 100 questions, 60 on DOPL's Contractor's Business and Law Reference Manual and 40 on the 2017 Idaho State Plumbing Code (2015 UPC), including 8 sizing questions. Open book, 4 hours, 75% to pass.

Questions
100
Time limit
4 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10ISPC Chapter 5: Water Heaters

A high-efficiency gas water heater with a Category IV PVC vent is installed in an Idaho home. Under Idaho's amendment to the vent inspection section, how must the vent be tested?

Requirements at a glance

AgencyIdaho Division of Occupational and Professional Licenses (DOPL); exam by PSI
Exam100 questions (60 business and law, 32 plumbing code, 8 sizing), 4 hours, 75% to pass
Books allowedDOPL Contractor's Business and Law Reference Manual (printed, in a three-ring binder) and the 2015 UPC or 2017 Idaho State Plumbing Code
Fees$75 per exam to PSI, plus DOPL license fees

Plumbing businesses applying to Idaho DOPL for a plumbing contractor license. The exam mixes business and law with plumbing code.

How to get licensed, step by step

  1. Get the books

    Download DOPL's free manual, print it, hole-punch it and put it in a three-ring binder. Bring your own 2015 UPC or 2017 ISPC.

    DOPL: Contractor's Business and Law Reference Manual (PDF) (opens in a new tab)

  2. Register and pay with PSI

    Pick the Idaho Plumbing Contractor exam, pay the $75 fee and book a seat.

    Schedule with PSI (Idaho contractor and trade exams) (opens in a new tab)

How to prepare

  • The manual is 60 questions, but not with the public works weights: human resources (Section 6) 20, insurance (Section 7) 15 and safety (Section 11) 10 are 45 of them.
  • The 8 sizing questions use schematics handed out at the exam. Practice sizing water supply and drainage from a riser diagram with the UPC tables.
  • On the code side, water heaters, water supply, indirect wastes and vents are 5 questions each. Idaho is a UPC state; don't study IPC material.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the DOPL manual and the 2015 UPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • DOPL Contractor's Business and Law Reference ManualEssential

    Free from DOPL. Idaho's public works, electrical, plumbing and HVAC contractor exams are written from it; bring it printed, hole-punched and in a three-ring binder.

    DOPL (PDF) (opens in a new tab)

  • 2015 Uniform Plumbing Code (UPC) or 2017 Idaho State Plumbing CodeEssential

    Bring one. Idaho adopted the 2015 UPC with amendments as its plumbing code, so the numbering matches. Tab Chapters 5, 6, 7, 9 and 12 and the sizing tables.

    IAPMO store (opens in a new tab)Read free (IAPMO) (opens in a new tab)

Official reference list (as published by the testing agency)
  • DOPL Contractor's Business and Law Reference Manual (free PDF; bring it printed, hole-punched and in a three-ring binder)
  • 2015 Uniform Plumbing Code (UPC), IAPMO
  • 2017 Idaho State Plumbing Code (ISPC): the 2015 UPC as adopted with Idaho amendments (IDAPA 24.39.20)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
ISPC Chapter 2: Definitions1
ISPC Chapter 5: Water Heaters5
ISPC Chapter 6: Water Supply and Distribution5
ISPC Chapter 7: Sanitary Drainage2
ISPC Chapter 8: Indirect Wastes5
ISPC Chapter 9: Vents5
ISPC Chapter 10: Traps and Interceptors3
ISPC Chapter 11: Storm Drainage2
ISPC Chapter 12: Fuel Gas Piping4
Plumbing Sizing from Schematics8
Manual Section 1: Business Plan Outline1
Manual Section 2: Developing Professional Relationships1
Manual Section 3: Business Organization1
Manual Section 4: Licensing Information1
Manual Section 5: Accounting and Finance1
Manual Section 6: Human Resources20
Manual Section 7: Insurance15
Manual Section 8: Estimating and Bidding3
Manual Section 9: Contracts1
Manual Section 10: Project Management2
Manual Section 11: Safety10
Manual Section 12: Taxes1
Manual Section 13: Lien Laws3

Exam day details

  • Administered by PSI Services for the Idaho Division of Occupational and Professional Licenses (DOPL).
  • Fee: $75 per exam, paid to PSI when you schedule. The fee is good for one year, isn't refundable, and each retake costs it again. DOPL license application fees are separate.
  • 100 questions in 4 hours; 75% to pass. 60 questions come from the DOPL manual (human resources 20, insurance 15 and safety 10 lead), 32 from the plumbing code chapters and 8 are sizing questions worked from schematics handed out at the exam.
  • Bring the manual printed, hole-punched and in a three-ring binder, plus your own 2015 UPC or 2017 Idaho State Plumbing Code (the 2015 UPC with Idaho amendments).
  • You may highlight, underline and add permanent tabs to your references, but not write in them. Sticky notes and loose papers aren't allowed.
  • Your score shows on screen when you finish.
  • Cancel or reschedule at least 2 days before your appointment to keep your fee.

Frequently asked questions

What's on the Idaho plumbing contractor exam?

Per DOPL's December 2025 PSI bulletin, 60 manual questions (human resources 20, insurance 15, safety 10, estimating and bidding 3, lien laws 3, project management 2, one each from the other seven sections), 32 plumbing code questions (water heaters, water supply, indirect wastes and vents 5 each, fuel gas 4, traps 3, drainage 2, storm drainage 2, definitions 1) and 8 sizing questions from schematics.

Which books can I bring?

DOPL's Contractor's Business and Law Reference Manual (printed, hole-punched, in a three-ring binder) and the 2015 Uniform Plumbing Code or 2017 Idaho State Plumbing Code.

What score do I need to pass?

75%, or 75 of the 100 questions, in 4 hours. That's higher than the 70% for Idaho's plumbing journeyman exam.

Free questions with answers

Show all 10 free questions and answers
  1. A high-efficiency gas water heater with a Category IV PVC vent is installed in an Idaho home. Under Idaho's amendment to the vent inspection section, how must the vent be tested?

    Answer: The entire vent tested with 5 psi of air for 15 minutes

    IDAPA 24.39.20.600 adds to Section 503.1 that water heaters using Category III or IV exhaust venting must have the vent tested in its entirety with 5 pounds of air for 15 minutes, and plastic vents must follow the manufacturer's instructions. Testing only concealed joints does not meet the 'entire vent' requirement, and the 10-ft water head is the DWV water test, not a vent test.

    Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 503.1, Inspection of Chimneys or Vents, as amended by IDAPA 24.39.20.600

  2. A pressure relief valve is installed on a hot water storage system. What is the maximum pressure setting allowed for the valve?

    Answer: 150 psi

    Section 608.4 requires each pressure relief valve to be an approved automatic type with a drain, set at not more than 150 psi, with no shutoff valve between it and the system. 100 psi is the maximum setting for relief valves used in place of expansion tanks in engineered systems under 608.2, and 80 psi is the static-pressure limit.

    Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 608.4, Pressure Relief Valves

  3. A plumbing contractor is digging a 7-foot-deep trench in clay to replace a sewer lateral. Under 29 CFR 1926.652(a)(1) as summarized in the manual, what does the employer need to protect workers in the trench from cave-ins?

    Answer: An adequate protective system, because the trench is 5 feet or deeper and is not in stable rock

    29 CFR 1926.652(a)(1), cited in Section 11, requires each employee in an excavation to be protected from cave-ins by an adequate protective system unless the excavation is made entirely in stable rock, or is less than 5 feet deep and a competent person's examination shows no indication of a potential cave-in. A 7-foot trench in clay meets neither exception, so a protective system is needed. A competent person or spotter at the top does not replace the protective system.

    Reference: DOPL Contractor's Business and Law Reference Manual, Section 11, Section 11: Safety, Construction Industry Digest (29 CFR 1926.652(a)(1), Protective Systems)

  4. A restaurant potato peeler has a 3/4-inch drain outlet and must discharge through an air gap to a floor sink. Under Idaho's amendment to Section 801.3.3, what is the minimum size of the indirect waste pipe from the peeler?

    Answer: 1 inch

    Idaho's added text in Section 801.3.3 says the piping from listed food-handling equipment (including potato peelers) to the receptor must not be smaller than the drain on the unit and not smaller than 1 inch. The 3/4-inch outlet is therefore increased to 1 inch. 3/4 inch is the ice-maker minimum in 801.3.1, and 1/2 inch is the general indirect-waste minimum in 803.3.

    Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 801.3.3, Food-Handling Fixtures, as amended by IDAPA 24.39.20.600

  5. A plumbing contractor wants every applicant for a service plumber opening to pass a company-paid physical before it decides whom to hire. According to the manual's ADA discussion, what is the rule?

    Answer: The employer may not require a medical exam before extending a job offer

    Section 6 says an employer may not ask job applicants to answer medical questions or take a medical exam before extending a job offer, and may not ask applicants whether they have a disability. It may ask whether they can perform the job's duties. Treating every applicant alike or paying for the exam does not make a pre-offer exam lawful.

    Reference: DOPL Contractor's Business and Law Reference Manual, Section 6, Section 6: Human Resources, Americans with Disabilities Act (ADA)

  6. A lavatory P-trap is being assembled with tubular fittings. How many slip joint fittings may be used on the outlet side of the trap?

    Answer: One

    Section 1003.2 allows a maximum of one approved slip joint fitting on the outlet side of a trap, and a tubing trap needs a listed tubing trap adapter. Slip joints are permitted, so 'none' is wrong, and two or more on the outlet side are not allowed.

    Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 1003.2, Slip Joint Fittings

  7. A drainage stack in a 14-story building serves fixtures on every floor. Besides a parallel vent stack, what does Section 907.1 require between the vent stack and the drainage stack?

    Answer: A yoke vent at each fifth floor, counting down from the uppermost fixture drain

    Section 907.1 applies to drainage stacks of 10 or more stories: a parallel vent stack connects at or just below the lowest fixture drain and is tied to the drainage stack at each fifth floor, counted down from the uppermost fixture drain, by a yoke vent not smaller than the smaller of the two stacks. Every-third-floor and every-floor spacings are not in the section.

    Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 907.1, Drainage Stack

  8. New threaded steel gas piping in a house will carry natural gas at 7 inches water column. What test does Section 1213.3 require before it is covered?

    Answer: 10 psi of air, CO2 or nitrogen for at least 15 minutes

    Section 1213.3 requires gas piping to stand an air, CO2 or nitrogen test of not less than 10 psi for at least 15 minutes with no perceptible drop. 60 psi for 30 minutes applies to welded piping or gas above 14 inches water column, and 30 psi for 30 minutes to CSST above 14 inches water column.

    Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 1213.3, Test Pressure

  9. A newly licensed plumbing contractor asks which insurance coverages Idaho requires. According to the opening of the manual's insurance section, what does the State require, with few exceptions?

    Answer: Workers' compensation and unemployment insurance, and contractors must also provide proof of liability insurance

    Section 7 opens by saying the State of Idaho requires businesses to carry workers' compensation insurance and unemployment insurance, with few exceptions, and that contractors are also required to provide proof of liability insurance. Builder's risk, professional and pollution liability are listed as common or specialty coverages, and Idaho has no state disability program beyond workers' compensation.

    Reference: DOPL Contractor's Business and Law Reference Manual, Section 7, Section 7: Insurance

  10. A natural gas schematic (1,000 Btu per cubic foot, under 2 psi, 0.5 in. w.c. drop) shows the meter feeding one main that serves a 90,000 Btu/h furnace, a 40,000 Btu/h water heater, a 65,000 Btu/h range and a 35,000 Btu/h dryer. The longest run from the meter to the most remote outlet is 56 feet. Table 1216.2(1) excerpt, schedule 40 pipe, cfh: 50 ft: 3/4 in = 151, 1 in = 284; 60 ft: 3/4 in = 137, 1 in = 257, 1-1/4 in = 528. What size is the first section of main carrying all four appliances?

    Answer: 1 inch

    Load = 90,000 + 40,000 + 65,000 + 35,000 = 230,000 Btu/h = 230 cfh. 56 ft is not a table row, so use the next longer row, 60 ft (Section 1216.4). In that row 3/4 inch carries 137 cfh (too small) and 1 inch carries 257 cfh, so 1 inch is the minimum. 1-1/4 inch would work but is oversized; 3/4 inch fails even in the 50-ft row.

    Reference: 2015 Uniform Plumbing Code (2017 Idaho State Plumbing Code), Section 1216.4 and Table 1216.2(1), Schedule 40 Metallic Pipe

Sources

Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.