Requirements at a glance
| Agency | Idaho Division of Occupational and Professional Licenses (DOPL); exam by PSI |
|---|---|
| Exam | 40 questions, 2 hours, 70% to pass |
| Books allowed | 2020 or 2023 NEC (or NEC Handbook) and Ugly's Electrical References (any edition) |
| Fees | $75 per exam to PSI, plus DOPL license application fees |
Installers applying to Idaho DOPL for a limited electrical installer license in limited energy work.
Official links
How to get licensed, step by step
Check your experience
Make sure you meet DOPL's requirements for the Limited Energy Installer license before you test; you prove them when you apply.
DOPL: electrical program information and exams (opens in a new tab)
Register and pay with PSI
Create a PSI account, pick the Idaho Limited Energy Installer exam and pay the $75 fee, then schedule a seat at a PSI center. The fee is good for one year.
Schedule with PSI (Idaho contractor and trade exams) (opens in a new tab)
Pass the exam
Bring your tabbed references and score 70% or higher.
Schedule with PSI (Idaho contractor and trade exams) (opens in a new tab)
Apply to DOPL
After you pass, apply through eDOPL for the Limited Energy Installer license.
DOPL online license application (eDOPL) (opens in a new tab)
How to prepare
- Bring your own 2020 or 2023 NEC (or NEC Handbook) and Ugly's (any edition). The PSI outline is labeled by 2017 NEC chapter, so focus on rules that read the same in each edition.
- Tab your books before exam day with permanent tabs. You can highlight and underline, but not write in them; sticky notes are removed.
- Chapter 7 special conditions is 18 of 40 questions: tab the articles on Class 1, 2 and 3 circuits, fire alarm systems (760) and optical fiber (770).
- Article 90 is 6 questions and Chapter 3 wiring methods 8; know the Chapter 3 rules that apply to low-voltage cabling.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2020 or 2023 Edition (or the NEC Handbook)Essential
Bring your own; the outline is labeled by 2017 NEC chapter. Tab Article 90, Articles 100 and 110, Chapters 2 to 4, the articles for your specialty and Chapter 9.
NFPA store (opens in a new tab)Free online access (opens in a new tab)
Ugly's Electrical References (any edition)
Allowed in the exam room. Formulas for Ohm's law, voltage drop, motors and transformers.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC) or NEC Handbook, 2020 or 2023 Edition
- Ugly's Electrical References (any edition)
- Optional: Ferm's Fast Finder Index or Tom Henry's Key Word Index (2020 and 2023 editions)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| NEC Article 90: Introduction | 6 | |
| NEC Chapter 1: General | 4 | |
| NEC Chapter 2: Wiring and Protection | 3 | |
| NEC Chapter 3: Wiring Methods and Materials | 8 | |
| NEC Chapter 7: Special Conditions | 18 | |
| NEC Calculations | 1 |
Exam day details
- Administered by PSI Services for the Idaho Division of Occupational and Professional Licenses (DOPL).
- Fee: $75 per exam, paid to PSI when you schedule. The fee is good for one year, isn't refundable, and each retake costs it again. DOPL license application fees are separate.
- 40 questions in 2 hours; 70% to pass. The one calculation question uses Chapter 2.
- Open book: bring your own 2020 or 2023 NEC (or NEC Handbook) and Ugly's Electrical References (any edition). The PSI outline lists its topics by 2017 NEC chapter; the chapters are the same in the 2020 and 2023 editions, though some articles and section numbers changed.
- Pass the exam with PSI first, then apply to DOPL for the limited license. Book online at PSI; no DOPL approval is needed to sit.
- You may highlight, underline and add permanent tabs to your references, but not write in them. Sticky notes and loose papers aren't allowed.
- Your score shows on screen when you finish.
- Cancel or reschedule at least 2 days before your appointment to keep your fee.
Frequently asked questions
What's on the Idaho limited energy installer exam?
Per DOPL's December 2025 PSI bulletin, 40 NEC questions: Chapter 7 special conditions 18, Chapter 3 wiring methods 8, the introduction (Article 90) 6, Chapter 1 4, Chapter 2 3 and 1 calculation from Chapter 2.
Which NEC edition do I bring?
DOPL's December 2025 PSI bulletin allows the 2020 or 2023 NEC (or the NEC Handbook) plus Ugly's Electrical References (any edition). The outline itself is labeled by 2017 NEC chapter, so focus on rules that read the same in every edition.
Free questions with answers
Show all 10 free questions and answers
A low-voltage installer is asked what the NEC is fundamentally for. Per 90.1(A), its purpose is:
Answer: The practical safeguarding of persons and property from electrical hazards
90.1(A) states the purpose of the Code is the practical safeguarding of persons and property from hazards arising from the use of electricity. It is not a design manual or a performance standard for signal quality. Same in 2017, 2020 and 2023.
Reference: NFPA 70, National Electrical Code, 2023, 90.1(A)
According to 90.3, how do the requirements of Chapters 1 through 7 apply to Chapter 8 (Communications Systems)?
Answer: They do not apply unless specifically referenced in Chapter 8
90.3 states that Chapter 8 covers communications systems and is not subject to the requirements of Chapters 1 through 7 except where the requirements are specifically referenced in Chapter 8. Chapters 5, 6 and 7, by contrast, supplement or modify Chapters 1-7. Same arrangement in 2017, 2020 and 2023.
Reference: NFPA 70, National Electrical Code, 2023, 90.3
As defined in Article 100, 'listed' equipment is equipment that:
Answer: Is included in a list published by an organization acceptable to the AHJ that evaluates products
Article 100 defines Listed as equipment or materials included in a list published by an organization acceptable to the AHJ and concerned with evaluation of products, which maintains periodic inspection and whose listing states the equipment meets standards or has been tested and found suitable. 'Accepted by the AHJ' is the definition of Approved. Same in 2017, 2020 and 2023.
Reference: NFPA 70, National Electrical Code, 2023, Article 100, Listed
An inspector cites a jumble of loose cables lying on a suspended ceiling and draped across light fixtures. Which Chapter 1 requirement most directly addresses this?
Answer: 110.12, neat and workmanlike manner
110.12 requires electrical equipment to be installed in a neat and workmanlike manner. Informational notes point to ANSI/NECA standards describing accepted practice. Support rules in Chapter 3 and Chapter 7 also apply, but 110.12 is the Chapter 1 workmanship rule. Same in 2017, 2020 and 2023.
Reference: NFPA 70, National Electrical Code, 2023, 110.12
An intersystem bonding termination is installed at a building's service for bonding communications and CATV systems. It must have capacity for connecting at least how many intersystem bonding conductors?
Answer: Three
250.94 requires an intersystem bonding termination device, accessible and outside enclosures, with capacity for connection of not less than three intersystem bonding conductors (for example telephone, CATV and satellite). It must be connected to the service equipment enclosure, meter enclosure or grounding electrode conductor as the section specifies. The three-conductor capacity is the same in 2017, 2020 and 2023 (2020 and 2023 place it in 250.94(A)).
Reference: NFPA 70, National Electrical Code, 2023, 250.94(A)
An installer drills a hole through a fire-rated wall to pass a raceway. What must be done to the opening around the penetration?
Answer: Firestop it using approved methods
300.21 requires openings around electrical penetrations into or through fire-resistant-rated walls, partitions, floors or ceilings to be firestopped using approved methods to maintain the fire resistance rating. Fiberglass batts and cover plates do not restore the rating. Articles 725, 760 and 770 also require compliance with 300.21. Same in 2017, 2020 and 2023.
Reference: NFPA 70, National Electrical Code, 2023, 300.21
An installer wants to pull conductors into a partly installed EMT run and finish connecting the last sections afterward. Under 300.18(A), this is:
Answer: Not permitted; the raceway must be complete first
300.18(A) requires raceways (other than busways or exposed raceways with hinged or removable covers) to be installed complete between outlet, junction or splicing points before conductors are installed, to avoid damaging conductors. There is no length or pulling-speed allowance. Same in 2017, 2020 and 2023.
Reference: NFPA 70, National Electrical Code, 2023, 300.18(A)
A doorbell transformer supplies 16-volt wiring to a chime. Under the NEC definition, the Class 2 circuit is the wiring:
Answer: From the transformer's load side to the chime
A Class 2 circuit is the portion of the wiring system between the load side of a Class 2 power source and the connected equipment; its power limits make it safe from a fire initiation standpoint and give acceptable protection from shock. The primary side is a normal power circuit under Chapters 2-4. The definition is in Article 100 (2023) and 725.2 (2017 and 2020).
Reference: NFPA 70, National Electrical Code, 2023, Article 100, Class 2 Circuit
Compared with Class 2, a Class 3 circuit:
Answer: Allows higher levels and needs added shock safeguards
A Class 3 circuit is defined as one whose power source permits higher voltage and current levels than Class 2, so additional safeguards are specified to protect against electric shock. Class 3 is still power-limited by its source (Chapter 9, Tables 11(A) and 11(B)). The definitions are in Article 100 in 2023 and in 725.2 in 2017 and 2020.
Reference: NFPA 70, National Electrical Code, 2023, Article 100, Class 3 Circuit
A 120-volt branch circuit supplies three access-control power supplies drawing 4.2 A, 3.5 A and 4.8 A, all continuous loads. What is the minimum standard rating of the branch-circuit overcurrent device?
Answer: 20 A
Total continuous load = 4.2 + 3.5 + 4.8 = 12.5 A. 210.20(A) requires the OCPD to be at least the noncontinuous load plus 125% of the continuous load: 12.5 x 1.25 = 15.6 A. The next standard size per 240.6(A) is 20 A. 15 A forgets the 125% factor. Same in 2017, 2020 and 2023.
Reference: NFPA 70, National Electrical Code, 2023, 210.20(A)
Sources
- Idaho DOPL: Combined PSI Candidate Bulletin (effective 12.10.2025, PDF) (opens in a new tab)
- Idaho DOPL: Electrical program information and exams (opens in a new tab)
- PSI: Idaho contractor and trade exams (candidate bulletins) (opens in a new tab)
Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.