Hawaii licensing exam

Hawaii C-60 Solar Power Systems Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for Hawaii's C-60 solar power systems contractor classification: 50 questions on photovoltaic components, installation, interconnection, design and the 2020 NEC. Open book with the NEC provided.

Questions
50
Time limit
2 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Photovoltaic Theory

On a cold, clear winter morning a crystalline silicon string is measured at open circuit. Compared with its voltage at 25 degrees C cell temperature, the open-circuit voltage will most likely be

Requirements at a glance

AgencyHawaii Contractors License Board (DCCA PVL); exams by PSI
ExperienceAt least 4 years of supervisory experience (foreman, supervising employee or contractor) in the classification within the past 10 years (HAR 16-77-18); the Board may accept equivalent training or experience
ExamsC-60 Solar Power Systems Contractor: 50 questions, 2 hours, 75%, plus the Business and Law exam for new applicants
Books allowedNone; the 2020 NEC is provided in the testing center (no notes)
Fees$80 to PSI per exam ($85 for B and A), plus the Board's application and license fees and required insurance

Qualifiers for a Hawaii C-60 solar power systems contractor license from the Contractors License Board, in addition to the Business and Law exam. C-60 covers photovoltaic panels, batteries, controls and related low voltage D.C. wiring.

How to get licensed, step by step

  1. Apply to the Board

    Send the Contractors License Board your application. You can't register with PSI until the Board approves it and sends a letter of approval.

    Contractors License Board (opens in a new tab)Hawaii Administrative Rules 16-77 (contractors) (opens in a new tab)

  2. Schedule Business and Law and the C-60 exam with PSI

    Register online or call PSI at 833-333-4754. Your approval is good for 6 months and you can test as often as you like in that time. After 6 months you need a new application.

    Schedule with PSI (Hawaii trade exams) (opens in a new tab)

  3. Pass both exams

    Each exam needs 75%. If you already hold a Hawaii license and add a classification, you take only the new trade exam.

    Schedule with PSI (Hawaii trade exams) (opens in a new tab)

  4. Get licensed

    Send the Board your results and proof of the insurance (workers' compensation and liability) the license requires.

    Contractors License Board (opens in a new tab)Hawaii Revised Statutes chapter 444 (contractors) (opens in a new tab)

How to prepare

  • Hawaii's trade exams are PSI exams on specific editions: the 2020 NEC, the 2018 UPC, IMC, IFGC and IBC. Hawaii's state electrical code is older than the 2020 NEC, so study to the editions on PSI's bulletin, and check the bulletin again before test day.
  • Contractor exams are closed book except C-13, where PSI provides the NEC. Electrician exams provide the NEC too. Plumber and other contractor exams allow no reference books.
  • Estimating, calculations and design (12) and photovoltaic components (10) are 22 of the 50 questions; practice string sizing and voltage and current calculations.
  • Electrical interconnection (8) and installation (7) draw on NEC Article 690 and related articles.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2020 NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2020 National Electrical Code (NEC), NFPA 70Essential

    Provided in the exam center, so you can't bring your own. Practice finding answers fast.

    NFPA store (opens in a new tab)

Official reference list (as published by the testing agency)
  • NFPA 70: National Electrical Code, 2020 edition (provided in the testing center; no highlighting or notes)
  • National Electrical Safety Code, 2017 edition, IEEE (not allowed in the exam room)
  • Ugly's Electrical References, 2020, Jones and Bartlett (not allowed)
  • Photovoltaic Systems, 3rd edition, James Dunlop, American Technical Publishers (not allowed)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Photovoltaic Theory5
Electrical Interconnection8
Permitting, Inspection, and Utility Interconnections3
Photovoltaic Components10
Photovoltaic Installation7
Estimating, Calculations, and Design12
Safety OSHA5

Exam day details

  • Administered by PSI Services for the Hawaii Contractors License Board.
  • Fee: $80 to PSI. The Contractors License Board's application and license fees are separate.
  • 50 scored questions in 2 hours; 38 correct (75%) to pass. The 2020 NEC is provided and you cannot mark it.
  • The Board must approve your application before you can register with PSI. Your eligibility lasts 6 months, and you can test as often as you like within it.
  • PSI may add up to 10 unscored pretest questions; they do not count against your time.
  • Closed-book and open-book rules are on each exam page. PSI provides an online calculator, or you can bring a silent, non-programmable one.

Frequently asked questions

What's on the Hawaii C-60 exam?

50 scored questions: estimating, calculations and design 12, photovoltaic components 10, electrical interconnection 8, photovoltaic installation 7, photovoltaic theory 5, safety OSHA 5 and permitting, inspection and utility interconnections 3.

Which code is used?

The 2020 NEC, provided in the testing center. Photovoltaic Systems (3rd edition, Dunlop) and Ugly's are on PSI's reference list but not allowed in the room.

Do I also take Business and Law?

Yes, if you are a new applicant.

Free questions with answers

Show all 10 free questions and answers
  1. On a cold, clear winter morning a crystalline silicon string is measured at open circuit. Compared with its voltage at 25 degrees C cell temperature, the open-circuit voltage will most likely be

    Answer: higher, because module open-circuit voltage rises as cell temperature falls

    Crystalline silicon modules have a negative voltage temperature coefficient: colder cells give higher voltage. That is why NEC 690.7(A) requires the maximum system voltage to be corrected for the lowest expected ambient temperature (Table 690.7(A) factors above 1.00 below 25 degrees C). Current changes only slightly with temperature.

    Reference: 2020 National Electrical Code (NFPA 70), 690.7(A), Table 690.7(A)

  2. For a dwelling with a center-fed panelboard, the NEC permits a PV source connection at either end of the busbar when 125 percent of the source output current plus the rating of the overcurrent device protecting the busbar does not exceed what percentage of the busbar rating?

    Answer: 120 percent

    705.12(B)(3)(4) permits a connection at either end of a center-fed panelboard in a dwelling where the sum does not exceed 120 percent of the busbar rating. 100 percent is the limit for the general busbar method in (B)(3)(1). 125 percent is the continuous-load multiplier on the source current, not the busbar limit.

    Reference: 2020 National Electrical Code (NFPA 70), 705.12(B)(3)(4)

  3. An inverter output is connected on the supply side of the service disconnecting means, as 230.82(6) permits. What is the smallest copper conductor allowed between the service-conductor connection point and the first overcurrent device of the power source?

    Answer: 6 AWG

    705.11(B) (2020) says the power source output conductors from the point of connection to the service conductors to the first overcurrent device are sized in accordance with 705.28 and may be no smaller than 6 AWG copper or 4 AWG aluminum. These conductors are on the supply side of the service disconnect, so they get a minimum size beyond the ampacity calculation.

    Reference: 2020 National Electrical Code (NFPA 70), 705.11(B)

  4. A homeowner's grid-tied PV system has passed final inspection. What must still happen before the system is operated in parallel with the utility grid?

    Answer: The utility must give written approval or permission to operate for the interconnection

    Hawaiian Electric's DER application form has the customer agree not to interconnect and operate the proposed system without prior written approval from Hawaiian Electric (often called permission to operate), and requires the facility to meet the Rule 14 Appendix I interconnection standard. The building inspection covers code compliance; it does not replace the utility's own review of grid impacts.

    Reference: Hawaiian Electric DER Application Submittal Form (11/2023), Acknowledgements: no interconnection or operation without prior written approval

  5. What is the purpose of bypass diodes in a crystalline PV module?

    Answer: To give current an alternate path around shaded or damaged cell groups

    Bypass diodes sit across groups of cells (usually three per module). When a group is shaded or cracked, the diode conducts so the string current can pass around it, limiting power loss and cell hot spots. Preventing night discharge is the job of a blocking diode or charge controller; diodes do not convert dc to ac.

    Reference: General practice (PV systems), Module construction: bypass diodes

  6. Compared with a PWM charge controller, an MPPT charge controller is usually chosen for a battery system because it

    Answer: Converts higher array voltage to battery voltage while operating the array near its maximum power point

    An MPPT controller steps the array voltage down to the battery voltage and tracks the maximum power point, so it can use a higher-voltage array and harvest more energy, especially in cold weather or with a deeply discharged battery. A PWM controller effectively ties the array to the battery voltage. Neither device removes the need for overcurrent protection or prevents over-discharge by itself.

    Reference: General practice (PV systems), Charge controllers: MPPT and PWM

  7. A PV output circuit has a maximum circuit current of 30.4 A calculated under 690.8(A). The circuit is run in 90 degree C-rated PV wire to equipment with terminals rated 75 degrees C, and no ambient or adjustment factors apply. What is the smallest copper conductor that complies?

    Answer: 8 AWG

    690.8(B)(1) requires an ampacity of at least 125 percent x 30.4 = 38 A. Under 110.14(C) the conductor ampacity cannot be used above the 75 degree C column when the terminals are rated 75 degrees C. Table 310.16, 75 degrees C copper: 10 AWG = 35 A (too low), 8 AWG = 50 A. Using the 90 degree C column (10 AWG = 40 A) would give the wrong size, and 12 AWG (30 A at 90 degrees C) is too small in either column.

    Reference: 2020 National Electrical Code (NFPA 70), 690.8(B)(1); 110.14(C); Table 310.16

  8. A string has 12 crystalline silicon modules, each with a rated open-circuit voltage of 49.5 V at STC. The lowest expected ambient temperature is 10 degrees C. Using the correction factors in Table 690.7(A), what is the maximum PV system voltage of the string?

    Answer: 629.6 V

    Table 690.7(A) gives a factor of 1.06 for ambient temperatures of 14 to 10 degrees C. Maximum voltage = 12 x 49.5 V x 1.06 = 629.6 V. 594.0 V (12 x 49.5) skips the correction. 653.4 V uses the 1.10 factor for 4 to 0 degrees C, and 742.5 V applies 1.25, the continuous-current multiplier, which has nothing to do with voltage.

    Reference: 2020 National Electrical Code (NFPA 70), 690.7(A), Table 690.7(A)

  9. A one-family dwelling's array uses modules with Voc = 41.5 V at STC. The lowest expected ambient temperature is 12 degrees C (Table 690.7(A) factor 1.06). What is the largest number of modules that may be placed in series?

    Answer: 13

    Corrected module voltage = 41.5 x 1.06 = 44.0 V. PV dc circuits on or in one- and two-family dwellings are limited to 600 V (690.7), so 600 / 44.0 = 13.6, rounded down to 13 modules (572 V). 14 modules results from ignoring the temperature correction (600 / 41.5 = 14.5), 24 uses the 1000 V limit for other buildings with no correction (1000 / 41.5 = 24.1), and 11 applies a 1.25 factor to voltage (600 / 51.9 = 11.6).

    Reference: 2020 National Electrical Code (NFPA 70), 690.7; Table 690.7(A)

  10. At what height above a lower level must an employee on an unprotected roof edge be protected from falling by a guardrail, safety net or personal fall arrest system under the OSHA construction standard?

    Answer: 6 feet or more

    29 CFR 1926.501(b)(1) requires fall protection for each employee on a walking/working surface with an unprotected side or edge 6 feet (1.8 m) or more above a lower level. The 4 ft rule is a general industry value, and 10 ft is the scaffold threshold in 1926.451(g)(1).

    Reference: 29 CFR Part 1926, 1926.501(b)(1)

Sources