Georgia licensing exam

Georgia Utility Manager Exam: Practice Test & Licensing Guide

The PSI exam for the Georgia Utility Manager license from the Division of Utility Contractors: 80 scored questions on laws, regulations, job planning, line work, concrete, process equipment and safety. Open book, 70 to pass.

Questions
80
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Regulations, Laws, and Administrative Functions: Laws Compliance

A utility contractor has had 18 employees on each working day for the last 30 weeks. Is it covered by the employment provisions of the Americans with Disabilities Act (Title I)?

Requirements at a glance

AgencyGeorgia Construction Industry Licensing Board (Division of Utility Contractors); exams by PSI
ExperienceSet by the Division of Utility Contractors; check the Board's application for the experience and reference requirements
Exam80 scored questions plus 15 beta questions, 4 hours, open book, 70 to pass
Books allowedThe NASCLA Georgia guide, Walker's Building Estimator's Reference Book, 29 CFR 1926, IRS Circular E, DIPRA ductile iron pipe guide, CRSI Placing Reinforcing Bars, GDOT Standard Specifications, the GSWCC erosion manual and the GA 811 Excavator Manual
FeesThe Utility Division's application, exam and license fees are not published in the PSI handbook; check the Board's application and PSI before you apply.

Utility managers applying for a Georgia utility contractor license from the Division of Utility Contractors of the Construction Industry Licensing Board (water, sewer and similar underground utility work).

How to get licensed, step by step

  1. Apply to the Board

    Submit the application, three references on the Board's form and the $40 fee to the Construction Industry Licensing Board (Macon; (404) 424-9966). The Board must approve you before you can register with PSI.

    Georgia State Board of Utility Contractors (CILB) (opens in a new tab)Georgia Rules 121-3 (CILB license requirements) (opens in a new tab)

  2. Register with PSI

    After approval, register and pay PSI online or at 855-898-0711. Bring the allowed references and a silent, non-programmable calculator.

    Schedule with PSI (Georgia CILB exams) (opens in a new tab)PSI handbook: Georgia utility managers (opens in a new tab)

  3. Take the exam

    Scaled score, 70 to pass. If you fail twice, the PSI bulletin requires a Board-approved review course before a third attempt.

    PSI handbook: Georgia utility managers (opens in a new tab)

  4. Finish licensing

    Send your results and the license fee to the Board.

    Georgia State Board of Utility Contractors (CILB) (opens in a new tab)

How to prepare

  • Georgia's exams are scaled with 70 to pass. The Board's 2026 reference lists apply to exams through December 31, 2026; check for the updated list if you test later.
  • Tab your books with permanent tabs before exam day. Highlighting and underlining are allowed; notes, sticky flags and loose papers are not.
  • Safety and quality control programs (20), job planning (14) and line work (14) are 48 of the 80 questions: trenching, pipe installation and testing, backfill and compaction.
  • Know OSHA 29 CFR 1926 trenching rules and the Georgia 811 excavation notice requirements.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • Contractors Guide to Business, Law, and Project Management: Georgia Construction Industry Licensing Board, 5th Edition (NASCLA)

    On the Board's reference lists for the electrical, conditioned air and plumbing exams.

    NASCLA store (opens in a new tab)

  • 29 CFR 1926 (OSHA Construction Standards), sections on your reference list

    Trenching, scaffolds, fall protection and ladders. Print just the listed sections.

    Read free (eCFR) (opens in a new tab)

Official reference list (as published by the testing agency)
  • Contractors Guide to Business, Law, and Project Management, Georgia Construction Industry Licensing Board, 5th Edition (NASCLA)
  • Walker's Building Estimator's Reference Book, 32nd Edition (2021)
  • 29 CFR Part 1926 (OSHA construction standards)
  • IRS Circular E (Publication 15), 2024 or 2025
  • Installation Guide for Ductile Iron Pipe (DIPRA, rev. 5/2021)
  • Placing Reinforcing Bars, 10th Edition (CRSI, 2022)
  • GDOT Standard Specifications, 2021
  • Manual for Erosion and Sediment Control in Georgia, 2016 (GSWCC)
  • Excavator Manual, 2025 Edition (Georgia 811)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Regulations, Laws, and Administrative Functions: Laws Compliance4
Regulations, Laws, and Administrative Functions: Regulations Compliance4
Regulations, Laws, and Administrative Functions: Administrative Requirements Compliance4
Technical Functions: Job Planning14
Technical Functions: Job Start-Up12
Technical Functions: Line Work14
Technical Functions: Concrete Work and Testing4
Technical Functions: Process Equipment Installation and Testing4
Technical Functions: Safety and Quality Control Programs20

Exam day details

  • Administered by PSI Services for the Georgia Construction Industry Licensing Board.
  • Fee: The Utility Division's application, exam and license fees are not published in the PSI handbook; check the Board and PSI before you apply.
  • 80 scored questions plus 15 unscored beta (pretest) questions in 4 hours.
  • Open book: only the references on the Board's list are allowed (listed here for exams through December 31, 2026).
  • Technical functions (job planning, start-up, line work, concrete, process equipment, safety and quality control) are 68 of the 80 questions; safety and quality control programs alone are 20.
  • Scores are scaled and you need 70 to pass.

Frequently asked questions

What's on the Georgia Utility Manager exam?

80 scored questions: regulations, laws and administrative functions 12 (4 each on laws, regulations and administrative requirements) and technical functions 68 (safety and quality control 20, job planning 14, line work 14, job start-up 12, concrete 4, process equipment 4).

Which board licenses utility managers?

The Division of Utility Contractors of the Georgia Construction Industry Licensing Board. PSI administers the exam.

How much does the exam cost?

The Division's candidate handbook does not print an exam fee. Confirm the PSI fee when you register.

Free questions with answers

Show all 10 free questions and answers
  1. A utility contractor has had 18 employees on each working day for the last 30 weeks. Is it covered by the employment provisions of the Americans with Disabilities Act (Title I)?

    Answer: Yes, since Title I covers employers with 15 or more employees for 20 or more weeks

    42 U.S.C. 12111(5)(A) defines an employer as one with 15 or more employees for each working day in 20 or more calendar weeks in the current or preceding year. Eighteen employees for 30 weeks meets both tests. The 25-employee figure was an early phase-in number that no longer applies.

    Reference: 42 U.S.C. 12111 (ADA Title I definitions), 12111(5)(A)

  2. Before a crew uses a trenching machine to dig for a new water service in Georgia, to whom is the locate request submitted?

    Answer: The Utilities Protection Center (UPC), which relays it to member facility owners

    O.C.G.A. 25-9-6(a) requires a locate request to the UPC before blasting or mechanized excavating. The UPC is the joint notification center that passes the request to its members. Separate calls to each owner are not the statutory route.

    Reference: Georgia Underground Facility Protection Act, O.C.G.A. 25-9, 25-9-6(a)

  3. A sewer contract allows 90 calendar days and carries liquidated damages of $850 per day. A change order granted 3 extra days for rain, and the work is actually finished on day 104. What liquidated damages apply?

    Answer: $9,350, charged for 11 days past the adjusted 93-day completion time

    The adjusted allowance is 90 + 3 = 93 days. Days late = 104 - 93 = 11. Damages = 11 x $850 = $9,350. Charging 14 days ignores the change order, and 17 days wrongly adds the extension to the delay.

    Reference: General business practice: liquidated damages and time extensions, Contract time and liquidated damages

  4. Why does a utility contractor send shop drawings for precast manholes to the engineer before the structures are ordered?

    Answer: So the engineer can confirm the product meets the plans and specifications before it is made

    A shop drawing or submittal lets the design engineer check dimensions, reinforcement, openings and pipe connections against the contract documents before fabrication, so errors are caught on paper. It does not shift responsibility or change the contract.

    Reference: General trade practice: shop drawings and submittals, Submittal review before fabrication

  5. A crew must install a water main across a state route. What should the utility manager obtain before moving equipment onto the right-of-way?

    Answer: The utility or encroachment permit from the agency that controls the road

    Work in a public road right-of-way is done under a permit from the road authority (the state DOT, county or city), obtained before mobilizing. A verbal OK, a delivery ticket or an insurance letter is not a permit to work in the right-of-way.

    Reference: General trade practice: permits for routing and right-of-way work, Obtaining permits before mobilizing

  6. Which excavation does 29 CFR 1926.652(a)(1) allow without any cave-in protective system?

    Answer: A 12-foot-deep excavation made entirely in stable rock

    Protection is required unless the excavation is made entirely in stable rock, or is less than 5 feet deep and a competent person's examination shows no indication of a potential cave-in. Depth alone does not matter in stable rock. The clay, sand and Type A trenches are 5 feet or deeper or lack a competent person's finding, so they need protection.

    Reference: 29 CFR 1926.652, 1926.652(a)(1)

  7. A thrust block will be 4 feet by 4 feet by 3 feet. The contractor orders 10% extra for spillage and over-excavation. How many cubic yards should be ordered, to the nearest tenth?

    Answer: 2.0 cubic yards

    Volume = 4 x 4 x 3 = 48 cubic feet. In cubic yards, 48 / 27 = 1.78. Adding 10%, 1.78 x 1.10 = 1.96, which rounds to 2.0 cubic yards. 1.8 omits the extra, 5.3 divides by 9 instead of 27 (48 / 9 = 5.33) and leaves out the extra, and 2.7 adds 50% instead of 10%.

    Reference: General trade practice: concrete quantity takeoff, Volume in cubic yards = cubic feet / 27

  8. A crew will enter a permit-required confined space, a sewer wet well, with alternate entry procedures. Before entry, in what order must the atmosphere be tested?

    Answer: Oxygen, then flammable gases and vapors, then potential toxic air contaminants

    1926.1203(e)(2)(iii) requires the internal atmosphere to be tested with a calibrated direct-reading instrument for oxygen content first, then for flammable gases and vapors, then for potential toxic air contaminants, in that order. Oxygen goes first because other sensors may depend on it.

    Reference: 29 CFR 1926 Subpart AA (Confined Spaces in Construction), 1926.1203(e)(2)(iii)

  9. A 7-foot-deep open trench is left over the weekend and no one will enter it until Monday. Is a competent person's inspection required on Saturday under 29 CFR 1926.651(k)?

    Answer: No, because the inspections are required only when employee exposure can be reasonably anticipated

    1926.651(k)(1) requires daily inspections by a competent person before work starts and as needed through the shift, and after every rainstorm or other hazard-increasing event, but it says the inspections are required only when employee exposure can be reasonably anticipated. Inspection must happen before anyone enters on Monday.

    Reference: 29 CFR 1926.651, 1926.651(k)(1)

  10. Under 29 CFR 1926.21(b)(2), what must an employer do for each employee about unsafe conditions and the regulations that apply to the work?

    Answer: Instruct each employee in recognizing and avoiding unsafe conditions and the applicable regulations

    1926.21(b)(2) says the employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the regulations applicable to his work environment to control or eliminate hazards or other exposure to illness or injury. Training duties are owed to each employee under 1926.20(f)(2).

    Reference: 29 CFR 1926.21, 1926.21(b)(2)

Sources

Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.