Requirements at a glance
| Agency | Georgia State Licensing Board for Residential and General Contractors; exams by PSI |
|---|---|
| Exam | Residential-Light Commercial exam (90 questions, 230 minutes, open book, 70% (63) to pass) plus the Business and Law exam |
| Books allowed | 2018 IBC, 2018 IRC, 2015 IECC, 29 CFR 1926, Carpentry and Building Construction, BCSI truss guide, ACI concrete guide, Modern Masonry and the other references on the PSI list |
| Fees | $72 (Residential-Basic or Residential-Light Commercial), $106 (General Contractor) or $60 (Business and Law) to PSI per the PSI bulletin, plus the Board's application and license fees |
Individuals and qualifying agents applying for a Georgia Residential-Light Commercial contractor license from the State Licensing Board for Residential and General Contractors, in addition to the Business and Law exam.
Official links
How to get licensed, step by step
Apply to the Board
Get approved by the Residential and General Contractors board first, then register with PSI. You need both the Business and Law exam and the trade exam.
Georgia State Licensing Board for Residential and General Contractors (opens in a new tab)
Register with PSI
Book and pay PSI online or at 855-744-0314.
Schedule with PSI (Georgia residential and general contractors) (opens in a new tab)PSI bulletin: Georgia residential and general contractors (opens in a new tab)
Mind the attempt limits
You get 2 attempts per exam approval within the 1-year eligibility period. After two failures of the same exam you must wait at least 1 year (O.C.G.A. 43-41-6(g)).
PSI bulletin: Georgia residential and general contractors (opens in a new tab)
How to prepare
- General code and construction knowledge (20) and carpentry (16) are 36 of the 90 questions: tab the 2018 IBC and IRC chapters on construction types, egress, framing and roofing.
- Code questions use only the editions on the PSI list (2018 IBC and IRC, 2015 IECC); other references may be later editions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IBC and the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Building Code (IBC): 2018 edition for Residential-Light Commercial; 2021 or 2024 edition for General ContractorEssential
Allowed in the exam room. Georgia's 2024 IBC with Georgia amendments is the current state code, but the Residential-Light Commercial list pins the 2018 edition.
2018 International Residential Code (IRC)Essential
Allowed in the Residential-Basic exam room. Code questions are based only on the 2018 edition.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- International Building Code, 2018 (ICC)
- International Residential Code, 2018 (ICC)
- International Energy Conservation Code, 2015 (ICC)
- 29 CFR Part 1926 (OSHA construction standards)
- Carpentry and Building Construction, 2010 or 2016 (Feirer and Feirer)
- BCSI: Guide to Good Practice for Handling, Installing, Restraining, and Bracing of Metal Plate Connected Wood Trusses (2018)
- Georgia Accessibility Code and Georgia amendments to the state minimum standard codes (DCA)
- The other references on the PSI list (ACI concrete guide, Modern Masonry, Pipe and Excavation Contracting, USG Gypsum Handbook, SJI and SDI manuals)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Sitework, Footings and Foundation | 8 | |
| Concrete and Concrete Reinforcement | 8 | |
| Metals | 5 | |
| Masonry | 6 | |
| Carpentry | 16 | |
| Roofing | 10 | |
| General Code and Construction Knowledge | 20 | |
| Associated Trades | 10 | |
| OSHA Safety | 7 |
Exam day details
- Administered by PSI Services for the Georgia State Licensing Board for Residential and General Contractors.
- Fee: $72 to PSI per the PSI bulletin. The Board's application and license fees are separate.
- 90 scored questions in 230 minutes; 63 correct (70%) to pass.
- Open book. Code questions are based only on the code editions on the PSI list (2018 IBC and IRC, 2015 IECC). References may be highlighted, underlined and indexed with permanent tabs, but not written in.
- Residential-Light Commercial licensing also requires the Georgia Business and Law exam, which you pass once for all residential and general contractor licenses.
- Under the PSI bulletin you get 2 attempts per exam approval within the 1-year eligibility period; after two failures of the same exam you must wait at least 1 year (O.C.G.A. 43-41-6(g)).
Frequently asked questions
What's on the Georgia Residential-Light Commercial exam?
90 questions: general code and construction knowledge 20, carpentry 16, roofing 10, associated trades 10, sitework, footings and foundation 8, concrete 8, OSHA safety 7, masonry 6 and metals 5.
How is it different from the Residential-Basic exam?
It is longer (90 questions instead of 80) and adds metals and the 2018 International Building Code to the 2018 IRC. Roofing and masonry also carry more weight.
Which exams do I need for a Residential-Light Commercial license?
The Residential-Light Commercial exam and the Georgia Business and Law exam.
Free questions with answers
Show all 10 free questions and answers
Under the 2018 IBC, a light commercial building is being graded. With no exception applied, how must the ground immediately adjacent to the foundation be sloped?
Answer: Away from the building at not less than 1 unit vertical in 20 horizontal (5 percent) for at least 10 feet
IBC Section 1804.4 requires a 5 percent slope (1:20) away from the foundation for a minimum of 10 feet measured perpendicular to the wall. The 2 percent figure is only the reduced slope allowed where climate or soil conditions warrant, and for impervious surfaces and swales near the building.
Reference: 2018 International Building Code (same text in the 2024 IBC), Section 1804.4
What is the minimum yield strength of the steel reinforcement permitted in IRC footings and stem walls under the seismic reinforcement provisions?
Answer: 40,000 psi (Grade 40)
Section R403.1.3.5.1 requires reinforcement to meet ASTM A615, A706 or A996 with a minimum yield strength of 40,000 psi (Grade 40). Grade 60 is commonly used but is not the code minimum, and Grade 30 does not qualify.
Reference: 2018 International Residential Code (Georgia State Minimum Standard One and Two Family Dwelling Code), Section R403.1.3.5.1
A plumber wants to drill a hole in the web of a load-bearing cold-formed steel wall stud without reinforcing it. What is the maximum length of the hole along the web?
Answer: 4 1/2 inches
Section R603.2.6.1 limits unreinforced web holes to 4 1/2 inches long, a width of no more than 0.5 times the member depth or 1 1/2 inches, on the web centerline, at least 24 inches center to center and at least 10 inches from the edge of the bearing surface. 10 inches is the patching limit in R603.2.6.3, not the unreinforced limit.
Reference: 2018 International Residential Code (Georgia State Minimum Standard One and Two Family Dwelling Code), Section R603.2.6.1
A brick unit is 2 1/4 inches high and 3 5/8 inches thick. Under IRC corbeling rules, what is the maximum projection of one unit beyond the unit below, using the more restrictive limit?
Answer: 1.13 inches
Section R606.5.2 limits projection of one unit to one-half the unit height or one-third the thickness at right angles to the wall, whichever is less. Half the height = 2.25 / 2 = 1.125 inches. One-third of the thickness = 3.625 / 3 = 1.21 inches. The smaller, 1.13 inches, governs. 2.25 is the full height, and 1.81 is half the thickness.
Reference: 2018 International Residential Code (Georgia State Minimum Standard One and Two Family Dwelling Code), Section R606.5.2
Floor joists will frame into the side of a wood girder. How does the IRC require them to be supported?
Answer: By approved framing anchors, or on ledger strips at least nominal 2 inches by 2 inches
Section R502.6.2 requires joists framing into the side of a wood girder to be supported by approved framing anchors or on ledger strips of not less than nominal 2 x 2 inches. Toenails alone are not an approved support.
Reference: 2018 International Residential Code (Georgia State Minimum Standard One and Two Family Dwelling Code), Section R502.6.2
Slate shingles are specified for a new residence. What is the minimum roof slope the IRC allows for slate?
Answer: 4 units vertical in 12 horizontal (33 percent)
Section R905.6.2 allows slate shingles only on slopes of 4:12 (33 percent) or greater. 3:12 is the metal shingle minimum and 2:12 is the asphalt shingle minimum.
Reference: 2018 International Residential Code (Georgia State Minimum Standard One and Two Family Dwelling Code), Section R905.6.2
Under the 2018 IBC, a retail sales floor is 7,200 square feet gross. What is the minimum design occupant load for that space?
Answer: 120 occupants
Table 1004.5 gives the occupant load factor for mercantile uses as 60 square feet gross per occupant. 7,200 / 60 = 120. Using 150 (the business factor) gives 48, using 30 gives 240, and using 15 gives 480. Section 1004.5 says to divide the floor area by the table factor for the function of the space.
Reference: 2018 International Building Code (Table 1004.5 values are the same in the 2024 IBC), Table 1004.5
Under the 2018 IBC, what minimum clear opening width must an egress door provide, and how is it measured on a swinging door?
Answer: 32 inches, between the face of the door and the stop with the door open 90 degrees
Section 1010.1.1 requires a minimum clear opening of 32 inches, measured between the face of the door and the stop with the door open 90 degrees. Where two leaves are used without a mullion, one leaf must provide the 32 inches.
Reference: 2018 International Building Code (same text in the 2024 IBC), Section 1010.1.1
A furnace is installed under the floor of a house. The passageway to it runs 8 inches below the adjoining grade. Is any lining of the passageway walls required?
Answer: No; walls need lining with concrete or masonry only where the passageway or service space goes more than 12 inches below grade
Section M1305.1.3 requires the walls of the passageway to be lined with concrete or masonry extending 4 inches above the adjoining grade only if the passageway or service space depth exceeds 12 inches below grade. At 8 inches below grade no lining is required. The passageway must still be at least 30 inches high, 22 inches wide and no more than 20 feet long, with a 22 by 30 inch rough-framed access opening.
Reference: 2018 International Residential Code (Georgia State Minimum Standard One and Two Family Dwelling Code), Section M1305.1.3
A new 12,000-square-foot building under construction needs portable fire extinguishers. Under OSHA's construction fire protection rule, what is the minimum number of 2A-rated extinguishers, and the maximum travel distance to the nearest one?
Answer: 4 extinguishers; travel distance not over 100 feet
29 CFR 1926.150(c)(1)(i) requires a fire extinguisher rated not less than 2A for each 3,000 square feet of the protected building area, or major fraction thereof: 12,000 / 3,000 = 4. Travel distance from any point of the protected area to the nearest extinguisher may not exceed 100 feet.
Reference: 29 CFR 1926, 1926.150(c)(1)(i)
Sources
- PSI: Georgia Residential and General Contractors Candidate Information Bulletin (opens in a new tab)
- Georgia State Licensing Board for Residential and General Contractors (opens in a new tab)
Questions last verified November 15, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.