Requirements at a glance
| Agency | Connecticut Department of Consumer Protection (DCP); exams by PSI |
|---|---|
| Experience | A completed bona fide apprenticeship in the specific area of the trade; the experience required for a limited license may be less than 4 years (CGS 20-334a(a)(2)); age 18 |
| Exams | S-4 limited heating, cooling and piping exam: 50 questions, 2 hours, 70% |
| Books allowed | IMC (2015, 2018 and 2021), NFPA 54 (2012), NFPA 31, NFPA 58, NFPA 56, Modern Refrigeration and Air Conditioning 22nd edition and 29 CFR 1926 |
| Fees | $59 at PSI; DCP $90 application fee (CGS 20-333) and $120 initial license fee (CGS 20-335); renews yearly for $120 |
Workers with a registered apprenticeship and experience in the trade (or equivalent DCP accepts) applying for a Connecticut S-4 license from the Department of Consumer Protection.
Official links
How to get licensed, step by step
Confirm you qualify
Journeyperson licenses need a completed registered apprenticeship with at least 4 years of experience (or equivalent experience and training DCP accepts), then the trade exam only.
Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
Apply to DCP
DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.
Connecticut DCP: trade license examinations (opens in a new tab)
Pass the trade exam with PSI
Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.
Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)
Get licensed
Send DCP your passing score report or reports with the license fee shown on it.
Connecticut DCP: trade license examinations (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
- Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
- Fuel gas systems is 8 of 50 questions, hydronics 7 and oil burners 6.
- Piping (5), boilers (3), controls (3) and ducts (3) are the next largest sections.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IMC and NFPA 54. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2015, 2018 or 2021 (Connecticut adopts 2021 with amendments)Essential
Allowed in the exam room. The core of the heating, piping and cooling exams.
NFPA 54: National Fuel Gas Code (or Handbook), 2012Essential
Allowed in the exam room. Connecticut uses NFPA 54 rather than the IFGC. Use the longest length method for pipe sizing.
NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011
Allowed in the exam room. Oil burner and tank installation.
NFPA 58: Liquefied Petroleum Gas Code, 2014
Allowed in the exam room. LP-gas storage, piping and appliances.
NFPA 56: Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems
Allowed in the S-3 and S-4 exam rooms. Purging and cleaning of gas piping.
Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
Refrigeration cycle, troubleshooting, piping and controls.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- International Mechanical Code or Commentary, 2015, 2018 and 2021 editions (allowed in the exam room)
- NFPA 54: National Fuel Gas Code or Handbook, 2012; use the longest length method for gas pipe sizing (allowed in the exam room)
- NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011 (allowed in the exam room)
- NFPA 58: Liquefied Petroleum Gas Code, 2014 (allowed in the exam room)
- NFPA 56: Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems (allowed in the exam room)
- Modern Refrigeration and Air Conditioning, 22nd Edition (allowed in the exam room)
- 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)
- Residential Oil Burners, 3rd Edition; Modern Hydronic Heating; Steam Plant Operation, 10th Edition (recommended for study; NOT allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Chimneys, Flues and Vents | 2 | |
| Insulation | 1 | |
| General Knowledge | 2 | |
| Controls | 3 | |
| Hydronics | 7 | |
| Fuel Gas Systems | 8 | |
| Oil Burners | 6 | |
| Piping | 5 | |
| Boilers | 3 | |
| Combustion Air | 2 | |
| Storage Tanks | 2 | |
| Ducts | 3 | |
| Heating and Chilled Water Equipment | 3 | |
| OSHA Safety | 3 |
Exam day details
- Administered by PSI Services for the Connecticut Department of Consumer Protection.
- Fee: $59 to PSI per exam portion. DCP license fees are separate.
- 50 questions in 2 hours; 70% to pass. Open book.
- The license covers heating, boiler, steam, hydronic piping and oil burner work, excluding sheet metal, air conditioning and refrigeration (RCSA 20-332).
- Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
- Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
- Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
- Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
- Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.
Frequently asked questions
What's on the Connecticut S-4 exam?
50 questions: fuel gas systems 8, hydronics 7, oil burners 6, piping 5, then boilers, controls, ducts and heating and chilled water equipment (3 each) and smaller sections.
Is the S-4 open book?
Yes. You may bring the allowed references listed on the PSI bulletin, tabbed with permanent tabs, and use a silent, non-programmable calculator.
Do I need the Business and Law exam for the S-4?
No. Journeyperson applicants take only the trade exam.
Free questions with answers
Show all 10 free questions and answers
Under IMC 1205.1.4, where must shutoff valves be installed with respect to a pressure-reducing valve in a hydronic piping system?
Answer: On both sides of the pressure-reducing valve
IMC 1205.1.4 requires shutoff valves on both sides of a pressure-reducing valve so the valve can be isolated for service. One valve on a single side would leave the reducing valve under pressure from the other side.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 1205.1.4
A 400,000 Btu/h hot water heating boiler has a manhole on its top. What is the minimum clearance from the top of the boiler to the ceiling or overhead obstruction under IMC Table 1004.3.1?
Answer: 3 feet
IMC Table 1004.3.1 lists a minimum 3 ft top clearance for all boilers with manholes on top, except where a greater clearance is given elsewhere in the table. Boilers without top manholes are generally 2 ft. The 7 ft figure applies only to certain large high-pressure steam boilers.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), Table 1004.3.1
An oil-fired appliance is being equipped with a device that stops the burner if the venting system becomes blocked. How must that device reset under IMC 801.21?
Answer: By a manual reset, installed per the manufacturer's instructions
IMC 801.21 requires oil-fired appliances to have a device that stops burner operation when the venting system is obstructed. The device must have a manual reset, so the burner cannot restart on its own into a blocked vent.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 801.21
A vent connector runs 6 feet horizontally to the chimney. Using the minimum pitch in IMC 803.10.5, how much must it rise over that run?
Answer: 1-1/2 inches
IMC 803.10.5 requires connectors to rise to the chimney or vent with a minimum pitch of 1/4 unit vertical in 12 units horizontal (1/4 inch per foot, 2 percent slope). 6 ft x 1/4 in/ft = 1-1/2 in. 3/4 in uses 1/8 in per foot, 3 in uses 1/2 in per foot, and 6 in uses 1 in per foot.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 803.10.5
A gas system includes CSST. Under NFPA 54 7.13.2, where must the bonding jumper to the electrical service grounding electrode system connect to the gas piping?
Answer: To a metallic pipe or fitting between the point of delivery and the first downstream CSST fitting
NFPA 54 7.13.2 requires CSST gas piping systems to be bonded to the electrical service grounding electrode system. The bonding jumper connects to a metallic pipe or fitting between the point of delivery and the first downstream CSST fitting, and is not smaller than 6 AWG copper or equivalent. Appliance grounding conductors count as bonding only for non-CSST piping (7.13.1).
Reference: NFPA 54 National Fuel Gas Code (2012), 7.13.2
An oil-fired furnace is being set in a basement. Under NFPA 31, what minimum separations are required from an electrical panelboard and from an unenclosed fuel oil tank?
Answer: 3 feet from the panelboard and 5 feet from the tank
NFPA 31 (4.3.6 in the 2001 text) requires oil-burning appliances to be installed so that a minimum 3 ft separation is kept from any electrical panelboard and a minimum 5 ft separation from any unenclosed fuel oil tank.
Reference: NFPA 31 (2001 text on file; exam allows 2006 or 2011), 4.3.6 Appliance Separations
Copper pipe (not tubing) is supported along a horizontal run and then up a vertical riser. Which maximum spacings apply under IMC Table 305.4?
Answer: 12 feet horizontal and 10 feet vertical
IMC Table 305.4 gives copper or copper-alloy PIPE 12 ft horizontal and 10 ft vertical. Copper TUBING is 8 ft horizontal and 10 ft vertical, and steel pipe is 12 ft horizontal and 15 ft vertical, so each distractor mixes a neighboring row.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), Table 305.4
A return air opening is being placed in a room that also holds a gas water heater with a draft hood. What minimum distance must the opening be from the draft hood under IMC 601.5?
Answer: 10 feet in any direction
IMC 601.5 requires return air openings to be at least 10 ft, measured in any direction, from an open combustion chamber or draft hood of another appliance in the same room or space. This keeps the return from pulling flue gases back into the air system.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 601.5
A cooling tower for a chilled-water system discharges a vapor plume near an air intake. What separation does IMC 908.3 require between the plume discharge and any building ventilation inlet?
Answer: Not less than 5 feet above or 20 feet away
IMC 908.3 requires cooling towers, evaporative condensers and fluid coolers to be located so plume discharge does not enter occupied spaces: the plume must be at least 5 ft above or 20 ft away from any ventilation inlet to a building.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 908.3
A guardrail system on a roof must withstand what minimum force applied within 2 inches of the top edge, under 29 CFR 1926.502(b)(3)?
Answer: 200 pounds, in any outward or downward direction
29 CFR 1926.502(b)(3) requires guardrail systems to withstand, without failure, a force of at least 200 pounds applied within 2 in. of the top edge in any outward or downward direction, at any point along the top edge.
Reference: 29 CFR 1926, 1926.502(b)(3)
Sources
- PSI: Connecticut Heating, Piping and Cooling Examinations Candidate Information Bulletin (updated 2/4/2026) (opens in a new tab)
- Connecticut Department of Consumer Protection: trade license examinations (opens in a new tab)
- Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
- Connecticut DAS: State Building Code regulations (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.