Connecticut licensing exam

Connecticut S-1 Unlimited Heating, Piping and Cooling Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for Connecticut's S-1 unlimited heating, piping and cooling contractor license: 80 questions on the IMC, fuel gas, hydronics, refrigeration, oil burners and load calculations. Open book.

Questions
80
Time limit
3 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Oil Burners

An oil burner is served by a two-pipe system whose tank is buried outdoors. Where must the supply and return piping connect to the tank, and what may not be installed in the return line, under IMC Chapter 13?

Requirements at a glance

AgencyConnecticut Department of Consumer Protection (DCP); exams by PSI
ExperienceAt least 2 years as a licensed unlimited journeyperson in the trade, or equivalent experience and training DCP accepts (CGS 20-334a; RCSA 20-332); age 18
ExamsS-1 heating, piping and cooling exam: 80 questions, 3 hours, 70%, plus the Business and Law exam
Books allowedIMC (2015, 2018 and 2021), NFPA 54 (2012), NFPA 31, NFPA 58, NFPA 56, ACCA Manual N 5th edition, Modern Refrigeration and Air Conditioning 22nd edition, SMACNA duct standards and 29 CFR 1926
Fees$59 per PSI exam portion; DCP $150 application fee (CGS 20-333) and $150 initial license fee (CGS 20-335); renews yearly for $150

Heating, piping and cooling contractors with at least 2 years as a journeyperson applying for a Connecticut S-1 license from the Department of Consumer Protection.

How to get licensed, step by step

  1. Confirm you qualify

    Contractor licenses need at least 2 years as a licensed journeyperson (or equivalent experience and training DCP accepts), plus both the Business and Law exam and the trade exam.

    Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)

  2. Apply to DCP

    DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.

    Connecticut DCP: trade license examinations (opens in a new tab)

  3. Pass both exam portions with PSI

    Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.

    Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)

  4. Get licensed

    Send DCP your passing score report or reports with the license fee shown on it.

    Connecticut DCP: trade license examinations (opens in a new tab)

How to prepare

  • Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
  • Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
  • Fuel gas systems is 10 of 80 questions. The bulletin says to use the longest length method for gas pipe sizing.
  • Load calculations (7) come from ACCA Manual N; hydronics, ducts and oil burners are 6 each.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the IMC and NFPA 54. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • International Mechanical Code (IMC), 2015, 2018 or 2021 (Connecticut adopts 2021 with amendments)Essential

    Allowed in the exam room. The core of the heating, piping and cooling exams.

    ICC store (opens in a new tab)

  • NFPA 54: National Fuel Gas Code (or Handbook), 2012Essential

    Allowed in the exam room. Connecticut uses NFPA 54 rather than the IFGC. Use the longest length method for pipe sizing.

    NFPA store (opens in a new tab)

  • NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011

    Allowed in the exam room. Oil burner and tank installation.

    NFPA store (opens in a new tab)

  • NFPA 58: Liquefied Petroleum Gas Code, 2014

    Allowed in the exam room. LP-gas storage, piping and appliances.

    NFPA store (opens in a new tab)

  • ACCA Manual N: Load Calculation for Small Commercial Buildings, 5th Edition

    Allowed in the S-1 exam room. Source for the load calculation questions.

    ACCA manuals (opens in a new tab)

  • Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)

    Refrigeration cycle, troubleshooting, piping and controls.

    Goodheart-Willcox (opens in a new tab)

  • 29 CFR 1926 (OSHA Construction Standards), sections on your reference list

    Trenching, scaffolds, fall protection and ladders. Print just the listed sections.

    Read free (eCFR) (opens in a new tab)

Official reference list (as published by the testing agency)
  • International Mechanical Code or Commentary, 2015, 2018 and 2021 editions (allowed in the exam room)
  • NFPA 54: National Fuel Gas Code or Handbook, 2012; use the longest length method for gas pipe sizing (allowed in the exam room)
  • NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011 (allowed in the exam room)
  • NFPA 58: Liquefied Petroleum Gas Code, 2014 (allowed in the exam room)
  • NFPA 56: Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems (allowed in the exam room)
  • ACCA Manual N: Load Calculation for Small Commercial Buildings, 5th Edition (allowed in the exam room)
  • Modern Refrigeration and Air Conditioning, 22nd Edition (allowed in the exam room)
  • HVAC Duct Construction Standards, 2005, 3rd Edition, SMACNA, and the ACCA Ductulator (allowed in the exam room)
  • 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Insulation1
Hangers and Supports2
Sound/Vibration/Seismic Control1
Heating and Cooling Principles3
Refrigerants and Refrigeration5
Testing, Adjusting and Balancing3
Controls4
Machine Room1
A/C and Heat Pump Equipment3
Furnaces and Heaters4
Hydronics6
Chimneys, Flues and Vents5
Combustion Air2
Fuel Gas Systems10
Ducts6
Chillers2
Ventilation and Exhaust2
Safety4
Oil Burners6
Load Calculations7
Boilers3

Exam day details

  • Administered by PSI Services for the Connecticut Department of Consumer Protection.
  • Fee: $59 to PSI per exam portion. DCP license fees are separate.
  • 80 questions in 3 hours; 70% to pass.
  • Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
  • Connecticut has not adopted the International Fuel Gas Code. Gas questions are based on NFPA 54 (2012 on the bulletin, longest length method), NFPA 58 and NFPA 56.
  • Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
  • Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
  • Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
  • Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.

Frequently asked questions

What's on the Connecticut S-1 exam?

80 questions: fuel gas systems 10, load calculations 7, hydronics 6, ducts 6, oil burners 6, refrigerants and refrigeration 5, chimneys, flues and vents 5, then smaller sections including controls, furnaces, safety, boilers, heating and cooling principles and testing and balancing.

Which pipe sizing method applies to NFPA 54 questions?

The bulletin says you must use the longest length method for all gas pipe sizing questions.

Do I also need the Business and Law exam?

Yes. Contractor licenses need both the Business and Law exam and the S-1 trade exam.

Free questions with answers

Show all 10 free questions and answers
  1. An oil burner is served by a two-pipe system whose tank is buried outdoors. Where must the supply and return piping connect to the tank, and what may not be installed in the return line, under IMC Chapter 13?

    Answer: Both connect to the top of the tank, and no valves may be installed in the return piping

    IMC 1305.3 requires supply piping to connect to the top of the tank (the exception covers inside or above-ground tanks) and 1305.4 requires return piping to connect to the top and prohibits valves in return piping. A closed valve in a return line could pressurize and rupture the line or pump seal.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 1305.3 and 1305.4

  2. Fibrous glass ductwork is being sealed with pressure-sensitive tape. Under IMC 603.9, how must the tape be listed and marked?

    Answer: Listed and labeled to UL 181A and marked 181 A-P

    IMC 603.9 requires tapes and mastics for fibrous glass ducts to be listed and labeled to UL 181A and marked 181 A-P for pressure-sensitive tape, 181 A-M for mastic and 181 A-H for heat-sensitive tape.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 603.9

  3. A low-pressure residential gas system will operate at 7 inches of water column (about 0.25 psig). What minimum test pressure applies under NFPA 54 8.1.4.2?

    Answer: 3 psi

    8.1.4.2 requires at least 1 1/2 times the working pressure but never less than 3 psi irrespective of design pressure. 1.5 x 0.25 = 0.375 psi would be far below the 3 psi minimum, so the minimum controls.

    Reference: NFPA 54 (2012 edition; rule checked identical in 2006 and 2024 text), 8.1.4.2

  4. A single-wall vent connector will serve an oil-fired boiler connected to a chimney that is 20 feet tall. What is the maximum horizontal length of the connector under IMC 803.10.2?

    Answer: 15 feet

    IMC 803.10.2 limits a single-wall connector to a horizontal length of 75 percent of the height of the chimney or vent: 0.75 x 20 ft = 15 ft. The 20-foot answer treats the limit as 100 percent of the height.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 803.10.2

  5. A hydronic heating system has a maximum design pressure of 80 psi. What is the minimum hydrostatic test pressure under IMC 1208.1?

    Answer: 120 psi

    IMC 1208.1 requires a hydrostatic test at 1.5 times the maximum design pressure but not less than 100 psi, held at least 15 minutes. 1.5 x 80 = 120 psi, which exceeds the 100 psi minimum, so 120 controls. The 100 psi answer applies only where 1.5 x design is lower than 100.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 1208.1

  6. Can a technician top off a system with a refrigerant that has a different ASHRAE 34 designation than the refrigerant already in the system?

    Answer: No, except where the equipment manufacturer permits it to improve oil return

    IMC 1102.2.1 prohibits mixing refrigerants with different ASHRAE 34 designations. The exception allows a second refrigerant where the equipment manufacturer permits it to improve low-temperature oil return, in the amount the manufacturer specifies.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 1102.2.1

  7. An oil-fired vented wall furnace is being located near a hinged door. How close may the door swing to an air inlet or outlet of the furnace under IMC 909.3?

    Answer: A door may not swing within 12 inches of an air inlet or outlet, measured at right angles to the opening

    IMC 909.3 requires wall furnaces to be located so a door cannot swing within 12 inches of an air inlet or outlet, measured at right angles to the opening. Doorstops or door closers may not be used to gain this clearance.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 909.3

  8. Rooftop HVAC units are installed on a commercial roof where service personnel must climb higher than 16 feet above grade. What does IMC 306.5 require for access?

    Answer: An interior or exterior means of access that does not require portable ladders

    IMC 306.5: where personnel must climb higher than 16 feet above grade, an interior or exterior means of access shall be provided that does not require portable ladders, climbing over obstructions over 30 inches high or walking on roofs steeper than 4 in 12. Group R-3 is excepted.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 306.5

  9. A heat-loss calculation uses the conduction equation Q = U x A x delta T. A net wall area of 400 square feet has an overall assembly U-factor of 0.05 Btu/hr-sq ft-F. Indoor design temperature is 70 F and outdoor design is 0 F. What is the wall heat loss?

    Answer: 1,400 Btu/hr

    Q = U x A x delta T = 0.05 x 400 x (70 - 0) = 1,400 Btu/hr. This is the same as area x delta T / R, since U = 1/R (R = 20 here). The 560,000 figure multiplies by the R-value (20 x 400 x 70) instead of dividing by it, 28,000 leaves out the U-factor (400 x 70), and 20 leaves out the temperature difference (0.05 x 400).

    Reference: Pisupati, Energy Conservation for Environmental Protection (Engineering LibreTexts), 7.4 Residential Heat Loss (hourly heat loss = area x temperature difference / R-value) and 10.9 (U-factor is the inverse of R-value)

  10. Under IMC 1006.8, which statement about a boiler's electrical control system is correct?

    Answer: Control voltage may not exceed 150 volts nominal, and control and limit devices must interrupt the ungrounded side of the circuit

    IMC 1006.8 requires a two-wire grounded branch circuit (or isolation transformer), control voltage not over 150 volts nominal line to line, control and limit devices interrupting the ungrounded side, and a lockable manual disconnect so the burner is inoperative when deenergized.

    Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 1006.8

Sources

Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.