Requirements at a glance
| Agency | Connecticut Department of Consumer Protection (DCP); exams by PSI |
|---|---|
| Experience | A completed registered apprenticeship with at least 4 years of experience in the trade, or equivalent experience and training DCP accepts (CGS 20-334a; RCSA 20-332); age 18 |
| Exams | S-2 heating, piping and cooling exam: 70 questions, 3 hours, 70% |
| Books allowed | IMC (2015, 2018 and 2021), NFPA 54 (2012), NFPA 31, NFPA 58, NFPA 56, Modern Refrigeration and Air Conditioning 22nd edition, SMACNA duct standards and 29 CFR 1926 |
| Fees | $59 at PSI; DCP $90 application fee (CGS 20-333) and $120 initial license fee (CGS 20-335); renews yearly for $120 |
Heating, piping and cooling workers with a registered apprenticeship and at least 4 years of experience applying for a Connecticut S-2 journeyperson license.
Official links
How to get licensed, step by step
Confirm you qualify
Journeyperson licenses need a completed registered apprenticeship with at least 4 years of experience (or equivalent experience and training DCP accepts), then the trade exam only.
Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
Apply to DCP
DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.
Connecticut DCP: trade license examinations (opens in a new tab)
Pass the trade exam with PSI
Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.
Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)
Get licensed
Send DCP your passing score report or reports with the license fee shown on it.
Connecticut DCP: trade license examinations (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
- Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
- Fuel gas systems is 10 of 70 questions. The bulletin says to use the longest length method for gas pipe sizing.
- There is no load calculation section on the S-2; hydronics, ducts and oil burners are 6 questions each.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IMC and NFPA 54. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2015, 2018 or 2021 (Connecticut adopts 2021 with amendments)Essential
Allowed in the exam room. The core of the heating, piping and cooling exams.
NFPA 54: National Fuel Gas Code (or Handbook), 2012Essential
Allowed in the exam room. Connecticut uses NFPA 54 rather than the IFGC. Use the longest length method for pipe sizing.
NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011
Allowed in the exam room. Oil burner and tank installation.
NFPA 58: Liquefied Petroleum Gas Code, 2014
Allowed in the exam room. LP-gas storage, piping and appliances.
Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
Refrigeration cycle, troubleshooting, piping and controls.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- International Mechanical Code or Commentary, 2015, 2018 and 2021 editions (allowed in the exam room)
- NFPA 54: National Fuel Gas Code or Handbook, 2012; use the longest length method for gas pipe sizing (allowed in the exam room)
- NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011 (allowed in the exam room)
- NFPA 58: Liquefied Petroleum Gas Code, 2014 (allowed in the exam room)
- NFPA 56: Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems (allowed in the exam room)
- Modern Refrigeration and Air Conditioning, 22nd Edition (allowed in the exam room)
- HVAC Duct Construction Standards, 2005, 3rd Edition, SMACNA, and the ACCA Ductulator (allowed in the exam room)
- 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Insulation | 1 | |
| Hangers and Supports | 2 | |
| Sound/Vibration/Seismic Control | 1 | |
| Heating and Cooling Principles | 4 | |
| Refrigerants and Refrigeration | 5 | |
| Testing, Adjusting and Balancing | 1 | |
| Controls | 4 | |
| Machine Room | 1 | |
| A/C and Heat Pump Equipment | 3 | |
| Furnaces and Heaters | 4 | |
| Hydronics | 6 | |
| Chimneys, Flues and Vents | 3 | |
| Combustion Air | 2 | |
| Fuel Gas Systems | 10 | |
| Ducts | 6 | |
| Chillers | 2 | |
| Ventilation and Exhaust | 2 | |
| Safety | 4 | |
| Oil Burners | 6 | |
| Boilers | 3 |
Exam day details
- Administered by PSI Services for the Connecticut Department of Consumer Protection.
- Fee: $59 to PSI per exam portion. DCP license fees are separate.
- 70 questions in 3 hours; 70% to pass. The S-2 has no load calculation section.
- Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
- Journeyperson applicants take only the trade exam; there is no Business and Law portion.
- Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
- Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
- Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
- Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.
Frequently asked questions
What's on the Connecticut S-2 exam?
70 questions: fuel gas systems 10, hydronics 6, ducts 6, oil burners 6, refrigerants and refrigeration 5, then smaller sections including heating and cooling principles, controls, furnaces and heaters, safety, chimneys, flues and vents and boilers.
How does the S-2 differ from the S-1?
It has 70 questions instead of 80 and no load calculation section. It is also a trade-only exam with no Business and Law portion.
What experience do I need for the S-2?
A registered Connecticut Department of Labor apprenticeship and at least 4 years of experience, as set out in CGS 20-334a. Confirm current requirements with DCP.
Free questions with answers
Show all 10 free questions and answers
A buried gas line must cross a gravel parking area where delivery trucks turn, so damage from external forces is likely. Under NFPA 54, what minimum cover applies?
Answer: 18 inches
NFPA 54 7.1.2.1(A) raises the minimum cover from 12 in. to 18 in. where external damage to the pipe or tubing from external forces is likely to result, such as under a truck-traffic area. The base 12 in. applies only where such damage is not expected. The rule reads the same in the 2006 and 2024 texts.
Reference: NFPA 54 (2012 edition per CT bulletin; 2006 and 2024 text compared), 7.1.2.1(A)
A crimped joint is being made in round galvanized supply duct. Under IMC 603.4.2, what is the minimum lap and which duct end goes inside the next section?
Answer: 1 inch lap, male end extending into the adjoining duct in the direction of airflow
IMC 603.4.2 requires crimp joints for round and oval metal ducts to be lapped at least 1 in. with the male end extending into the adjoining duct in the direction of airflow, so the air stream does not catch the seam edge.
Reference: 2021 International Mechanical Code (Connecticut 2022 CSBC), 603.4.2
A closed hydronic system uses an expansion tank with no diaphragm (a plain steel tank with an air cushion). What does IMC 1205.1.6 require at its connection?
Answer: A shutoff valve at the tank connection
IMC 1205.1.6 requires shutoff valves at connections to nondiaphragm-type expansion tanks so the tank can be isolated for servicing. Diaphragm tanks are not covered by that item.
Reference: 2021 International Mechanical Code (Connecticut 2022 CSBC), 1205.1.6
A fuel oil pump has a valve downstream of the pump, and the pump can produce more pressure than the piping system is rated for. What does IMC 1307.3 require?
Answer: A relief valve on the pump discharge line
IMC 1307.3 requires a relief valve on the pump discharge line where a valve is located downstream of the pump and the pump is capable of exceeding the pressure limits of the system. Under 1307.5 the relief valve discharge line connects to the fuel oil tank.
Reference: 2021 International Mechanical Code (Connecticut 2022 CSBC), 1307.3
A technician measures a suction line temperature of 55 degrees F at the evaporator outlet. The suction pressure corresponds to a saturation temperature of 41 degrees F. What is the superheat?
Answer: 14 degrees F
Superheat is the actual vapor temperature minus the saturation (boiling) temperature at the measured pressure: 55 - 41 = 14 F. Adding the numbers gives 96, and 41 or 55 alone are just one of the readings.
Reference: HVAC School, Solving Superheat (hvacrschool.com; refrigeration-cycle principles, as in Modern Refrigeration and Air Conditioning), What is Superheat?
A contractor wants to attach a supply duct to a vented wall furnace to heat a second room. What does IMC 909.4 say?
Answer: Ducts shall not be attached to wall furnaces
IMC 909.4 prohibits attaching ducts to wall furnaces, and casing extension boots may not be installed unless they are listed as part of the appliance. Insulation, short lengths or a damper do not change the rule.
Reference: 2021 International Mechanical Code (Connecticut 2022 CSBC), 909.4
A downflow air handler sits in a closet with an auxiliary drain pan under the coil. Where insulation or equipment would be damaged when the pan fills, where does IMC 307.2.3.2 say that part must be placed?
Answer: Above the rim of the pan
IMC 307.2.3.2 says where appliances, equipment or insulation are subject to water damage when auxiliary drain pans fill, that portion must be installed above the rim of the pan. Supports inside the pan must be water resistant and approved.
Reference: 2021 International Mechanical Code (Connecticut 2022 CSBC), 307.2.3.2
A power exhauster serves an automatically fired appliance. What does IMC 804.3.2 require?
Answer: Electrical connection so the appliance cannot run when the exhauster is off
IMC 804.3.2 requires power exhausters serving automatically fired appliances to be electrically connected to each appliance to prevent its operation when the exhauster is not operating, so combustion products cannot back up into the building.
Reference: 2021 International Mechanical Code (Connecticut 2022 CSBC), 804.3.2
A furnace delivers 1,200 cfm with a 20 degree F temperature rise. Using the sensible heat formula Q = 1.08 x cfm x temperature difference, how much heat is added?
Answer: 25,920 Btu/h
Q = 1.08 x cfm x delta T = 1.08 x 1,200 x 20 = 25,920 Btu/h. Leaving out the 1.08 factor gives 24,000, dividing 1,200 by 20 gives 60, and 21,600 uses 1,000 cfm instead of 1,200.
Reference: Workforce LibreTexts, Introduction to Residential HVAC Level 1, Conversions and Formulas in HVAC, Section 7.06 Sensible Heat Formula
A portable ladder is used to reach a roof for rooftop unit service. How far must the side rails extend above the upper landing surface under 29 CFR 1926.1053(b)(1)?
Answer: At least 3 feet
29 CFR 1926.1053(b)(1) requires ladder side rails to extend at least 3 feet above the upper landing surface, or the ladder must be secured at its top to a rigid support with a grasping device if that extension is not possible.
Reference: 29 CFR 1926 (OSHA construction standards), 1926.1053(b)(1)
Sources
- PSI: Connecticut Heating, Piping and Cooling Examinations Candidate Information Bulletin (updated 2/4/2026) (opens in a new tab)
- Connecticut Department of Consumer Protection: trade license examinations (opens in a new tab)
- Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
- Connecticut DAS: State Building Code regulations (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.