Requirements at a glance
| Agency | Connecticut Department of Consumer Protection (DCP); exams by PSI |
|---|---|
| Experience | At least 2 years as a licensed journeyperson in the specific area of the trade, or equivalent experience and training DCP accepts (CGS 20-334a(a)(1)); age 18 |
| Exams | D-1 warm air, A/C and refrigeration exam: 70 questions, 3 hours, 70%, plus the Business and Law exam |
| Books allowed | IMC (2015, 2018 and 2021), ACCA Manual J 8th edition and Manual N 5th edition, NFPA 54 (2012), NFPA 58, Modern Refrigeration and Air Conditioning 22nd edition, SMACNA duct standards and 29 CFR 1926 |
| Fees | $59 per PSI exam portion; DCP $150 application fee (CGS 20-333) and $150 initial license fee (CGS 20-335); renews yearly for $150 |
Contractors with at least 2 years as a licensed journeyperson (or experience DCP accepts) applying for a Connecticut D-1 license from the Department of Consumer Protection.
Official links
How to get licensed, step by step
Confirm you qualify
Contractor licenses need at least 2 years as a licensed journeyperson (or equivalent experience and training DCP accepts), plus both the Business and Law exam and the trade exam.
Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
Apply to DCP
DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.
Connecticut DCP: trade license examinations (opens in a new tab)
Pass both exam portions with PSI
Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.
Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)
Get licensed
Send DCP your passing score report or reports with the license fee shown on it.
Connecticut DCP: trade license examinations (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
- Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
- Fuel gas systems is 10 of 70 questions, so tab NFPA 54 sizing tables and use the longest length method the bulletin requires.
- Refrigerants and refrigeration (8), ducts (6) and load calculations (6) come from Modern Refrigeration, the IMC and ducts standards, and Manual J and N.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IMC and NFPA 54. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2015, 2018 or 2021 (Connecticut adopts 2021 with amendments)Essential
Allowed in the exam room. The core of the heating, piping and cooling exams.
ACCA Manual J: Residential Load Calculation, 8th Edition (2006 reprint)
Allowed in the D-1 exam room. Source for the residential load calculation questions.
ACCA Manual N: Load Calculation for Small Commercial Buildings, 5th Edition
Allowed in the S-1 exam room. Source for the load calculation questions.
NFPA 54: National Fuel Gas Code (or Handbook), 2012Essential
Allowed in the exam room. Connecticut uses NFPA 54 rather than the IFGC. Use the longest length method for pipe sizing.
NFPA 58: Liquefied Petroleum Gas Code, 2014
Allowed in the exam room. LP-gas storage, piping and appliances.
Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
Refrigeration cycle, troubleshooting, piping and controls.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- International Mechanical Code or Commentary, 2015, 2018 and 2021 editions (allowed in the exam room)
- ACCA Manual J: Residential Load Calculation, 8th Edition (2006 reprint) (allowed in the exam room)
- ACCA Manual N: Load Calculation for Small Commercial Buildings, 5th Edition (allowed in the exam room)
- NFPA 54: National Fuel Gas Code or Handbook, 2012; use the longest length method for gas pipe sizing (allowed in the exam room)
- NFPA 58: Liquefied Petroleum Gas Code, 2014 (allowed in the exam room)
- Modern Refrigeration and Air Conditioning, 22nd Edition (allowed in the exam room)
- HVAC Duct Construction Standards, 2005, 3rd Edition, SMACNA, and the ACCA Ductulator (allowed in the exam room)
- 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Insulation | 1 | |
| Hangers and Supports | 2 | |
| Sound/Vibration/Seismic Control | 1 | |
| Heating and Cooling Principles | 5 | |
| Refrigerants and Refrigeration | 8 | |
| Testing, Adjusting and Balancing | 2 | |
| Controls | 5 | |
| Machine Room | 1 | |
| A/C and Heat Pump Equipment | 5 | |
| Furnaces and Heaters | 4 | |
| Chimneys, Flues and Vents | 2 | |
| Combustion Air | 2 | |
| Fuel Gas Systems | 10 | |
| Ducts | 6 | |
| Chillers | 3 | |
| Ventilation and Exhaust | 3 | |
| Safety | 4 | |
| Load Calculations | 6 |
Exam day details
- Administered by PSI Services for the Connecticut Department of Consumer Protection.
- Fee: $59 to PSI per exam portion. DCP license fees are separate.
- 70 questions in 3 hours; 70% to pass. Open book.
- The license covers warm air heating, air conditioning and refrigeration work (RCSA 20-332).
- Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
- NFPA 31 oil burning and hydronics are not on the D-1 list; the focus is warm air, cooling, refrigeration and gas.
- Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
- Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
- Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
- Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.
Frequently asked questions
What's on the Connecticut D-1 exam?
70 questions: fuel gas systems 10, refrigerants and refrigeration 8, ducts 6, load calculations 6, then heating and cooling principles, controls and A/C and heat pump equipment (5 each) and smaller sections.
Is the D-1 open book?
Yes. You may bring the allowed references listed on the PSI bulletin, tabbed with permanent tabs, and use a silent, non-programmable calculator.
Do I also need the Business and Law exam?
Yes. Contractor licenses need both the Business and Law exam and the D-1 trade exam.
Free questions with answers
Show all 10 free questions and answers
An installer plans a 10-foot run of listed Class 1 flexible air connector (not flexible air duct) that would drop through a ceiling to a diffuser. What do IMC 603.6.2.1 and 603.6.2.2 say about it?
Answer: It is not allowed, because flexible air connectors may not pass through any wall, floor or ceiling
IMC 603.6.2.1 limits flexible air connectors to 14 feet, and 603.6.2.2 says flexible air connectors shall not pass through any wall, floor or ceiling. A 10-foot length is within the limit, but the ceiling penetration is not allowed for a connector; listed flexible air duct, which 603.6.1.1 does not limit in length, would be needed instead.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 603.6.2.1 and 603.6.2.2
Under IMC 1110.2, when must field-installed refrigerant pipe and joints be visible for inspection and testing?
Answer: Before being covered or enclosed
IMC 1110.2 requires field-installed refrigerant pipe and joints to be exposed for visual inspection and testing prior to being covered or enclosed. Hidden joints cannot be inspected or leak tested afterward.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 1110.2
A chiller machinery room uses R-123, a refrigerant whose vapor is heavier than air. Under IMC 1105.6.1.1, where must the indoor mechanical exhaust intake openings be located?
Answer: Where leaked refrigerant is likely to concentrate, based on its density relative to air and the air current paths
IMC 1105.6.1.1 requires indoor mechanical exhaust intake openings to be located where refrigerant leakage is likely to concentrate, based on the refrigerant's relative density to air and the locations of air current paths and refrigerating machinery. For a vapor heavier than air that usually means low in the room. The exhaust itself discharges outdoors at least 20 feet from property lines and building openings (1105.6.1).
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 1105.6.1.1
A rooftop makeup air heater is fed from a gas line that must run inside a building at 10 psig. Which situation lets NFPA 54 5.5.1 permit an interior operating pressure over 5 psi?
Answer: The piping is located inside a boiler room or mechanical room, or is welded
NFPA 54 5.5.1 limits design operating pressure in piping inside buildings to 5 psi unless the piping is welded, in a ventilated chase or otherwise enclosed against gas accumulation, in industrial, research or warehouse areas, in boiler or mechanical rooms, temporary for construction, serving agricultural equipment, or LP-Gas over 20 psi per NFPA 58. Paint, insulation or large appliance input do not qualify.
Reference: NFPA 54 (2012 edition), 5.5.1
A furnace is located in an underfloor crawl space, and the passageway to it is 14 inches below adjoining grade. What does IMC 306.4 require of the passageway walls?
Answer: The walls must be lined with concrete or masonry where the depth exceeds 12 inches below grade
IMC 306.4 covers appliances under floors: the passageway must be at least 30 inches high and 22 inches wide, not more than 20 feet long, with a level 30 by 30 inch service space at the appliance. If the depth of the passageway or service space exceeds 12 inches below adjoining grade, the walls must be lined with concrete or masonry.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 306.4
A 60-ton chiller-type air handling system has cooling coils that produce condensate. What minimum condensate drain diameter does IMC Table 307.2.2 require?
Answer: 1 1/4 inches
Over 40 tons to 90 tons of refrigeration requires a 1 1/4 inch condensate pipe in Table 307.2.2. 1 inch covers over 20 to 40 tons and 1 1/2 inches covers over 90 to 125 tons.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), Table 307.2.2
Above what design capacity do IMC 606.2.1 return air systems need smoke detectors (when no exception applies)?
Answer: Greater than 2,000 cfm
IMC 606.2.1 requires smoke detectors in return air systems with a design capacity greater than 2,000 cfm, in the return duct or plenum upstream of filters, exhaust connections and outdoor air connections. The 15,000 cfm figure is the return air riser threshold in 606.2.3.
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 606.2.1
A furnace is to be installed in a private garage under IMC 304.7. What clearance applies unless the appliance is protected from vehicle impact and the ignition source is elevated?
Answer: At least 6 feet above the floor
IMC 304.7: appliances in private garages and carports shall be installed with at least 6 feet of clearance above the floor, except where they are protected from motor vehicle impact and installed with the ignition source elevated at least 18 inches (304.3).
Reference: 2021 International Mechanical Code (2022 Connecticut State Building Code), 304.7
A condenser's high-side pressure corresponds to a saturation temperature of 112 degrees F, and the liquid line leaving the condenser measures 98 degrees F. What is the subcooling?
Answer: 14 degrees F
Subcooling = condensing (saturation) temperature minus liquid line temperature = 112 - 98 = 14 degrees F. Reversing the order gives a negative number, and adding the two temperatures gives 210.
Reference: Trade math: HVAC refrigeration-cycle diagnostics (superheat, subcooling, EER), Subcooling = liquid saturation temperature minus liquid line temperature
A house has 1,500 square feet of floor with 8-foot ceilings and an estimated infiltration of 0.5 air changes per hour. Indoor design is 70 degrees F and outdoor design is 5 degrees F. Using cfm = volume x ACH / 60 and Q = 1.08 x cfm x TD, what is the infiltration heat loss?
Answer: 7,020 Btu/hr
Volume = 1,500 x 8 = 12,000 cubic feet. cfm = 12,000 x 0.5 / 60 = 100 cfm. TD = 65 degrees F, so Q = 1.08 x 100 x 65 = 7,020 Btu/hr. 421,200 skips the division by 60, 3,510 uses 0.25 ACH, and 8,424 uses 0.6 ACH.
Reference: Trade math: sensible and total heat formulas (Q = 1.08 x cfm x TD; Q = 4.5 x cfm x delta h), Q = 1.08 x cfm x TD
Sources
- PSI: Connecticut Heating, Piping and Cooling Examinations Candidate Information Bulletin (updated 2/4/2026) (opens in a new tab)
- Connecticut Department of Consumer Protection: trade license examinations (opens in a new tab)
- Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
- Connecticut DAS: State Building Code regulations (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.