Requirements at a glance
| Agency | Connecticut Department of Consumer Protection (DCP); exams by PSI |
|---|---|
| Experience | At least 2 years as a licensed journeyperson in the specific area of the trade, or equivalent experience and training DCP accepts (CGS 20-334a(a)(1)); age 18 |
| Exams | S-3 limited heating, cooling and piping exam: 60 questions, 2 hours, 70%, plus the Business and Law exam |
| Books allowed | IMC (2015, 2018 and 2021), NFPA 54 (2012), NFPA 31, NFPA 58, NFPA 56, Modern Refrigeration and Air Conditioning 22nd edition and 29 CFR 1926 |
| Fees | $59 per PSI exam portion; DCP $150 application fee (CGS 20-333) and $150 initial license fee (CGS 20-335); renews yearly for $150 |
Contractors with at least 2 years as a licensed journeyperson (or experience DCP accepts) applying for a Connecticut S-3 license from the Department of Consumer Protection.
Official links
How to get licensed, step by step
Confirm you qualify
Contractor licenses need at least 2 years as a licensed journeyperson (or equivalent experience and training DCP accepts), plus both the Business and Law exam and the trade exam.
Connecticut DCP: trade license examinations (opens in a new tab)Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
Apply to DCP
DCP decides whether you are eligible to test. Once approved, you contact PSI to pay and schedule.
Connecticut DCP: trade license examinations (opens in a new tab)
Pass both exam portions with PSI
Both are open book at $59 each. You can test as often as needed for up to one year from your eligibility date. A passing Business and Law score counts for 2 years toward another contractor license.
Schedule with PSI (Connecticut occupational licenses) (opens in a new tab)
Get licensed
Send DCP your passing score report or reports with the license fee shown on it.
Connecticut DCP: trade license examinations (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's list. You can highlight, underline, annotate and index them with permanent tabs, but you can't write in them during the exam and Post-It notes are not allowed.
- Connecticut's 2022 State Building Code uses the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments, and points to NFPA 54 and NFPA 58 for fuel gas (the IFGC is not adopted). The bulletin allows several editions, so check it for your test date.
- Fuel gas systems is 11 of 60 questions and oil burners 7; the S-3 covers heating, boilers, steam and hydronic piping but not sheet metal, air conditioning or refrigeration.
- Piping (6), boilers (5), hydronics (5) and general knowledge (5) make up most of the rest.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the IMC and NFPA 54. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
International Mechanical Code (IMC), 2015, 2018 or 2021 (Connecticut adopts 2021 with amendments)Essential
Allowed in the exam room. The core of the heating, piping and cooling exams.
NFPA 54: National Fuel Gas Code (or Handbook), 2012Essential
Allowed in the exam room. Connecticut uses NFPA 54 rather than the IFGC. Use the longest length method for pipe sizing.
NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011
Allowed in the exam room. Oil burner and tank installation.
NFPA 58: Liquefied Petroleum Gas Code, 2014
Allowed in the exam room. LP-gas storage, piping and appliances.
NFPA 56: Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems
Allowed in the S-3 and S-4 exam rooms. Purging and cleaning of gas piping.
Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
Refrigeration cycle, troubleshooting, piping and controls.
29 CFR 1926 (OSHA Construction Standards), sections on your reference list
Trenching, scaffolds, fall protection and ladders. Print just the listed sections.
Official reference list (as published by the testing agency)
- International Mechanical Code or Commentary, 2015, 2018 and 2021 editions (allowed in the exam room)
- NFPA 54: National Fuel Gas Code or Handbook, 2012; use the longest length method for gas pipe sizing (allowed in the exam room)
- NFPA 31: Standard for the Installation of Oil-Burning Equipment, 2006 or 2011 (allowed in the exam room)
- NFPA 58: Liquefied Petroleum Gas Code, 2014 (allowed in the exam room)
- NFPA 56: Standard for Fire and Explosion Prevention During Cleaning and Purging of Flammable Gas Piping Systems (allowed in the exam room)
- Modern Refrigeration and Air Conditioning, 22nd Edition (allowed in the exam room)
- 29 CFR Part 1926 (OSHA), or the PSI selections (allowed in the exam room)
- Residential Oil Burners, 3rd Edition; Modern Hydronic Heating; Steam Plant Operation, 10th Edition (recommended for study; NOT allowed in the exam room)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Chimneys, Flues and Vents | 2 | |
| Insulation | 1 | |
| General Knowledge | 5 | |
| Controls | 3 | |
| Hydronics | 5 | |
| Fuel Gas Systems | 11 | |
| Oil Burners | 7 | |
| Piping | 6 | |
| Boilers | 5 | |
| Combustion Air | 2 | |
| Storage Tanks | 3 | |
| Ducts | 3 | |
| Heating and Chilled Water Equipment | 3 | |
| OSHA Safety | 4 |
Exam day details
- Administered by PSI Services for the Connecticut Department of Consumer Protection.
- Fee: $59 to PSI per exam portion. DCP license fees are separate.
- 60 questions in 2 hours; 70% to pass. Open book.
- The license covers heating, boiler, steam, hydronic piping and oil burner work, excluding sheet metal, air conditioning and refrigeration (RCSA 20-332).
- Connecticut's 2022 State Building Code (effective 10/1/2022) is based on the 2021 IPC and IMC and the 2020 NEC, each with Connecticut amendments. The PSI bulletin (updated 2/4/2026) still lists the 2020 or 2023 NEC and the 2015, 2018 or 2021 IPC or IMC; check the current bulletin for your test date.
- Open book: bring your own copies of the allowed references. You may highlight, underline, annotate and index them beforehand, but not write in them during the exam. Permanent tabs only; Post-It notes are not allowed.
- Use a silent, nonprinting, non-programmable calculator. For code questions the exam is based only on the edition of the code book listed in the bulletin.
- Candidates may test as often as needed for up to one year from the date of eligibility. Contractor exam portions (business and trade) are each valid for 2 years from the date passed.
- Contractor and dealer licenses need two portions: the Business and Law exam and the trade exam. Journeyperson licenses need only the trade exam.
Frequently asked questions
What's on the Connecticut S-3 exam?
60 questions: fuel gas systems 11, oil burners 7, piping 6, then general knowledge, hydronics and boilers (5 each) and smaller sections.
Is the S-3 open book?
Yes. You may bring the allowed references listed on the PSI bulletin, tabbed with permanent tabs, and use a silent, non-programmable calculator.
Do I also need the Business and Law exam?
Yes. Contractor licenses need both the Business and Law exam and the S-3 trade exam.
Free questions with answers
Show all 10 free questions and answers
A new gas piping system will operate at a maximum working pressure of 6 psig. Under the NFPA 54 pressure-test rules, what is the minimum test pressure?
Answer: 9 psig
NFPA 54 Section 8.1.4 requires a test pressure of at least 1-1/2 times the proposed maximum working pressure, and never less than 3 psig. 1.5 x 6 = 9 psig, which is above the 3 psig floor. Testing at 6 psig is the working pressure itself, and 12 psig doubles it instead of using the 1.5 factor.
Reference: NFPA 54 (2012), 8.1.4.2 Test Pressure
A mechanic is sizing the return line from an oil burner pump back to the tank using copper tubing. What is the minimum return line size under IMC 1305.1?
Answer: 5/16-inch outside diameter tubing
IMC 1305.1 sets the minimum return line at 1/4-inch inside diameter nominal pipe or 5/16-inch outside diameter tubing. The supply line minimum is larger: 3/8-inch inside diameter pipe or 3/8-inch outside diameter tubing. Copper tubing must have 0.035-inch nominal wall (0.032-inch minimum).
Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 1305.1 Size
A 275-gallon fuel oil tank will be set in a basement. How far horizontally must it be from any source of heat, in or outside the oil-burning appliance, under NFPA 31?
Answer: At least 5 feet
NFPA 31 Section 7.5.6 keeps tanks of 10 to 660 gallons at least 5 ft horizontally from any source of heat, and also prohibits tanks from obstructing access to meters, panelboards or shutoff valves. The 2 ft figure applies only to tanks of less than 10 gallons (7.5.5).
Reference: NFPA 31 (2001 text on file; exam allows 2006 or 2011), 7.5.6 Installation of Tanks Inside Buildings
What minimum unobstructed passageway width must be kept around all sides of a boiler under IMC 1004.3, unless otherwise approved?
Answer: 18 inches
IMC 1004.3 requires clearances around boilers to allow inspection, service, repair and replacement and visibility of gauges, and passageways around all sides with an unobstructed width of at least 18 inches unless otherwise approved.
Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 1004.3 Working Clearance
A hydronic system has a maximum design pressure of 90 psi. What minimum hydrostatic test pressure applies under IMC 1208.1, and for how long?
Answer: 135 psi for at least 15 minutes
IMC 1208.1 requires a hydrostatic test at 1-1/2 times the maximum system design pressure but not less than 100 psi, held at least 15 minutes. 1.5 x 90 = 135 psi, above the 100 psi floor. Testing at 100 psi would apply only if 1.5 times design were less than 100 (a design pressure under about 67 psi). Doubling the pressure gives 180 psi.
Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 1208.1 General
A horizontal run of steel pipe and a vertical riser of steel pipe are being hung. What maximum support spacings does IMC Table 305.4 give?
Answer: 12 feet horizontal and 15 feet vertical
IMC Table 305.4 lists steel pipe at 12 ft maximum horizontal spacing and 15 ft maximum vertical spacing. Steel tubing and copper tubing are 8 ft horizontal and 10 ft vertical, so those values are tempting but belong to different rows.
Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), Table 305.4 Piping Support Spacing
An installer wants to use a flexible air connector (not a flexible air duct) for a 16-foot run from a trunk to a ceiling diffuser. Is that permitted under IMC 603.6.2.1?
Answer: No. Flexible air connectors are limited to 14 feet, so a flexible air duct or rigid duct must be used
IMC 603.6.2.1 limits flexible air connectors to 14 feet. A 16-foot run exceeds that, so the installer must use a flexible air duct (603.6.1.1 says flexible air ducts are not limited in length) or rigid duct. Connectors also may not pass through any wall, floor or ceiling (603.6.2.2).
Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 603.6.2.1 Connector Length
An oil-fired furnace needs a device against a blocked flue. What does IMC 801.21 require?
Answer: A manual-reset device that stops burner operation if the venting system is obstructed
IMC 801.21 requires oil-fired appliances to have a device that stops burner operation if the venting system is obstructed, with a manual reset, installed per the manufacturer's instructions. A manual reset forces a technician to find and fix the blockage.
Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 801.21 Blocked Vent Switch
A unit requiring service sits 8 feet from a roof edge that is 25 feet above the ground, and no fall arrest or restraint anchorage devices are installed. How high must the guard be under IMC 304.11?
Answer: The top of the guard at least 42 inches above the adjacent surface
IMC 304.11 requires guards where serviceable components are within 10 feet of a roof edge that is more than 30 inches above the surface below. Here the unit is within 10 feet and the edge is 25 feet up. The guard top must be at least 42 inches above the adjacent surface, and it extends 30 inches past each end of the equipment. The only exception is where ANSI/ASSP Z359.1 fall arrest or restraint anchorage connectors are installed, which the stem rules out.
Reference: 2021 International Mechanical Code (Connecticut amendments, 2022 CSBC), 304.11 Guards
A wood job-made ladder with spliced side rails has a working length of 16 feet. About how far from the top support should its foot be placed under 29 CFR 1926.1053(b)(5)(ii)?
Answer: About 2 feet
29 CFR 1926.1053(b)(5)(ii) sets wood job-made ladders with spliced side rails at an angle where the horizontal distance is one-eighth of the working length: 16 / 8 = 2 feet. The one-quarter rule in (b)(5)(i), which gives 4 feet, applies to other non-self-supporting ladders.
Reference: 29 CFR 1926, 1926.1053(b)(5)(ii)
Sources
- PSI: Connecticut Heating, Piping and Cooling Examinations Candidate Information Bulletin (updated 2/4/2026) (opens in a new tab)
- Connecticut Department of Consumer Protection: trade license examinations (opens in a new tab)
- Connecticut General Statutes Chapter 393 (trade licensing) (opens in a new tab)
- Connecticut DAS: State Building Code regulations (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.