California licensing exam

California General Electrician Certification Exam: Practice Test & Licensing Guide

The DIR Electrician Certification Unit exam for California General Electricians: 100 questions on safety, system requirements, installation, and maintenance and repair. 70% to pass; the NEC 2023 is on screen.

Questions
100
Time limit
4.5 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Installation

A service uses 400 kcmil copper ungrounded service-entrance conductors, and the grounding electrode conductor runs to the metal underground water pipe electrode. Using Table 250.66, what is the minimum size copper grounding electrode conductor for this service?

Requirements at a glance

AgencyCalifornia DIR, Division of Labor Standards Enforcement: Electrician Certification Unit (ECU)
WhoElectricians working for a C-10 or C-7 electrical contractor (Labor Code 108)
Format100 questions, 4 hours 30 minutes, 70% to pass; NEC 2023, NFPA 70E 2024 and the Cal/OSHA Pocket Guide are on screen
RetestWait 60 days after a failed attempt; $100 retest fee
RenewalEvery 3 years with 32 hours of continuing education

Electricians who install, construct or maintain electrical systems covered by the NEC for a C-10 or C-7 electrical contractor in California (Labor Code 108).

How to get licensed, step by step

  1. Apply to the ECU

    Send the General Electrician application and supporting documents to DLSE's Electrician Certification Unit and wait for approval.

    DIR/DLSE: Electrician Certification Unit test information (opens in a new tab)

  2. Schedule with Pearson VUE

    After approval you schedule the exam through Pearson VUE. Exams on or after June 1, 2026 are administered by CPS HR Consulting.

    Pearson VUE: ECU Candidate Information Bulletin (PDF) (opens in a new tab)

  3. Take the exam

    The NEC 2023, NFPA 70E 2024 and the Cal/OSHA Pocket Guide are searchable on screen. Your certification card is mailed after you pass.

How to prepare

  • Installation is 66% of the exam, so spend most of your time on NEC Chapters 2 to 4 and the special occupancies and equipment chapters.
  • You can't bring books, so practice finding rules in a searchable NEC quickly; time is about 2.7 minutes per question.
  • Take at least two full timed simulations before exam day.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the on-screen NEC 2023. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • National Electrical Code (NEC) 2023, provided on screen during the exam
  • NFPA 70E 2024, provided on screen during the exam
  • Cal/OSHA Electrical Safety Orders Pocket Guide, 2022, provided on screen during the exam

What's on the exam

Official content outline from CPS HR Consulting (number of questions per topic):

TopicQuestions
Safety6
Determination of Electrical System Requirements22
Installation66
Maintenance and Repair6

Exam day details

  • Administered by CPS HR Consulting for the DIR Division of Labor Standards Enforcement (DLSE), at Pearson VUE test centers.
  • Fee: $75 application fee paid to DLSE, plus $100 to take the exam (the same $100 for each retake, which can't be taken until 60 days after a failed attempt). Certification renewal is $100.
  • 100 questions in 4 hours 30 minutes; 70% to pass. Exams taken on or after June 1, 2026 are delivered by CPS HR Consulting through Pearson VUE.
  • You can't bring your own books: the NEC, NFPA 70E and Cal/OSHA Pocket Guide are available on the exam screen. Practice finding articles and tables quickly.
  • If you fail, wait 60 days from the exam date, then send a retest application and the $100 fee.
  • Certification is renewed every 3 years with 32 hours of continuing education from an approved California provider.

Frequently asked questions

What's on the California General Electrician exam?

100 questions: installation 66%, determination of electrical system requirements 22%, safety 6% and maintenance and repair 6%.

Can I bring a code book?

No. The NEC 2023, NFPA 70E 2024 and the Cal/OSHA Pocket Guide are provided on screen.

Is this the same as a C-10 contractor license?

No. The C-10 license is a CSLB contracting business license. The General Electrician certificate is for the electricians who work for a C-10 or C-7 contractor.

Free questions with answers

Show all 10 free questions and answers
  1. A service uses 400 kcmil copper ungrounded service-entrance conductors, and the grounding electrode conductor runs to the metal underground water pipe electrode. Using Table 250.66, what is the minimum size copper grounding electrode conductor for this service?

    Answer: 1/0 AWG copper

    Table 250.66 is entered with the size of the largest ungrounded service conductor. For copper conductors over 350 kcmil through 600 kcmil, the table gives 1/0 AWG copper. The 2 AWG value applies to conductors over 3/0 through 350 kcmil, and 2/0 AWG applies only above 600 kcmil. The 4 AWG value is for 2/0 or 3/0 conductors.

    Reference: NEC 2023, Table 250.66

  2. A metal outlet box will contain one single-pole switch (one yoke) and two 12/2 NM cables with ground that enter the box, with no cable clamps, fittings or other devices. Both cables have their conductors spliced or terminated inside the box. Using 2.25 in³ per 12 AWG conductor, what is the smallest box in Table 314.16(A) that meets the volume requirement?

    Answer: 4 in. x 1-1/4 in. square (18.0 in³)

    Count: 4 insulated 12 AWG conductors at 2.25 = 9.00; all equipment grounding conductors together count once = 2.25; the switch yoke counts twice the largest conductor = 4.50. Total 15.75 in³. The 4 x 1-1/2 round/octagonal box holds only 15.5 in³, just short, so the smallest adequate box is the 18.0 in³ square box. The 21.0 in³ box works but is not the smallest.

    Reference: NEC 2023, 314.16(B) and Table 314.16(A)

  3. Using the standard (Part III) method, a 1,800 ft² dwelling has a general lighting load calculated at 3 VA/ft², plus two 1,500 VA small-appliance circuits and one 1,500 VA laundry circuit. After applying Table 220.45, what is the demand load for these items?

    Answer: 5,415 VA

    Lighting: 1,800 x 3 = 5,400 VA. Add small-appliance 3,000 VA and laundry 1,500 VA = 9,900 VA. Table 220.45 for dwellings takes the first 3,000 VA at 100% and 3,001 to 120,000 VA at 35%: 3,000 + (6,900 x 0.35 = 2,415) = 5,415 VA. Using 9,900 VA applies no demand factor, 3,465 VA applies 35% to everything, and 6,900 VA is just the amount over 3,000.

    Reference: NEC 2023, 220.41, 220.52 and Table 220.45

  4. An 8,000 ft² office building needs its minimum general lighting load calculated under 220.42 using Table 220.42(A) (office occupancy, 1.3 VA/ft²). What is the minimum general lighting load to use?

    Answer: 10,400 VA

    8,000 ft² x 1.3 VA/ft² = 10,400 VA. The Note to Table 220.42(A) says the 125% continuous-load multiplier is already included, so adding another 25% (13,000 VA) double counts it. The values 28,000 VA (3.5 VA/ft²) and 24,000 VA (3 VA/ft²) are older or dwelling-style unit loads, not the table value for offices.

    Reference: NEC 2023, Table 220.42(A)

  5. A dwelling has a household electric clothes dryer with a nameplate rating of 4,000 W. For a service or feeder load calculation under 220.54, what load must be used for this single dryer?

    Answer: 5,000 VA

    Section 220.54 requires the larger of 5,000 W (VA) or the nameplate rating for each dryer. The nameplate is only 4,000 W, so 5,000 VA is used. The 3,200 VA value applies an unjustified 80% factor, and 6,250 VA adds 125% that the section does not call for.

    Reference: NEC 2023, 220.54

  6. Which of these is the type of equipment that 110.16(A) requires to be field or factory marked with an arc-flash hazard warning?

    Answer: A 400-A enclosed panelboard in an office building electrical room

    Section 110.16(A) applies to equipment such as switchboards, switchgear, enclosed panelboards, industrial control panels, meter socket enclosures and motor control centers in other than dwelling units that is likely to need examination, adjustment, servicing or maintenance while energized. A dwelling-unit panelboard is excluded, and switches and luminaires are not in this equipment list.

    Reference: NEC 2023, 110.16(A)

  7. In other than dwelling units, a permanent arc-flash label that includes the date it was applied is required by 110.16(B) on service equipment and feeder-supplied equipment rated at what minimum amperage?

    Answer: 1000 A or more

    Section 110.16(B) adds a permanent arc-flash label, field or factory applied, with the application date, for service equipment and feeder-supplied equipment rated 1000 amperes or more in other than dwelling units. Smaller equipment still falls under the general marking rule of 110.16(A), but the dated permanent label requirement starts at 1000 A.

    Reference: NEC 2023, 110.16(B)

  8. A non-self-supporting portable ladder rests against a wall so that its working length (the distance along the ladder from its foot to the top support) is 16 ft. About how far from the wall should the foot of the ladder be set?

    Answer: 4 ft

    OSHA's ladder rule calls for the horizontal distance from the top support to the foot of the ladder to be about one quarter of the working length. 16 ft / 4 = 4 ft. Two feet makes the ladder too steep and prone to tipping backward, while 6 ft makes it too shallow and prone to sliding.

    Reference: 29 CFR 1926.1053, 1926.1053(b)(5)(i)

  9. An old two-wire, nongrounding receptacle in a dwelling is being replaced, and there is no equipment grounding conductor in the box or any practical way to run one. Which replacement complies with 406.4(D)(2)?

    Answer: A GFCI receptacle with its cover plate or face marked "No Equipment Ground"

    Where no grounding means exists in the box, 406.4(D)(2) allows a nongrounding receptacle to be replaced with another nongrounding type, with a GFCI-type receptacle marked "No Equipment Ground" (with no equipment grounding conductor run from it to downstream outlets), or with a grounding-type receptacle supplied through a GFCI and marked "GFCI Protected" and "No Equipment Ground." Tying the ground terminal to the neutral creates a hazard and is not permitted.

    Reference: NEC 2023, 406.4(D)(2)

  10. You are replacing one receptacle on a multiwire branch circuit that serves several other outlets downstream, and the neutral passes through the device terminals. How should the neutral be connected so the repair complies with 300.13(B)?

    Answer: Splice the neutrals with a wire connector and a pigtail to the receptacle terminal

    Section 300.13(B) says that on multiwire branch circuits the continuity of the grounded conductor must not depend on device connections such as receptacles, so removing a device would not interrupt the neutral of downstream loads. A pigtail from a splice to the receptacle keeps the neutral continuous. If the neutral were left to pass through the terminals, removing the device would open the neutral and could overvoltage 120-volt loads.

    Reference: NEC 2023, 300.13(B)

Sources

Questions last verified October 26, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.