California licensing exam

California C-10 Electrical Contractor Exam: Practice Test & Licensing Guide

CSLB's trade exam for the C-10 Electrical license: planning and estimating, rough wiring, finish wiring and trim, startup and troubleshooting, and safety. Closed book.

Questions
Not published by California
Time limit
3.5 hours
Passing score
Not published by California
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Planning and Estimating

A job needs 23 duplex receptacles. The supplier charges $2.40 each plus 7.75% sales tax and gives one free receptacle for every 10 purchased. If you buy only as many as needed to end up with 23, what is the total cost?

Requirements at a glance

AgencyCalifornia Contractors State License Board (CSLB); exams by PSI
Experience4 years of journey-level experience in the trade within the last 10 years
ExamsC-10 Electrical trade exam, plus the Law and Business exam
FormatClosed book, 4-choice, 3.5 hours per exam; question count and pass score not published
Study references2025 California Electrical Code (NEC 2023 base); American Electricians' Handbook
Fees$450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints

Qualifiers for a California C-10 Electrical contractor license. Taken together with the Law and Business exam. Electricians who work for a C-10 contractor take the separate DIR certification exam.

How to get licensed, step by step

  1. Pick your classification

    Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.

    CSLB: Get Licensed to Build (PDF) (opens in a new tab)

  2. Apply to CSLB

    Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.

    California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)

  3. Schedule Law and Business and the C-10 exam with PSI

    Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.

    PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)

  4. Bond, fees and fingerprints

    After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.

How to prepare

  • The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
  • Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
  • Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
  • Planning and estimating (about 28%) and rough wiring (about 27%) are over half the exam: practice load calculations, conductor and conduit sizing, and box fill.
  • Solar PV, wind, generators and batteries appear inside the main sections, so review the NEC articles on solar PV, interconnected sources, energy storage and standby systems.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • CSLB C-10 Electrical study guide (6/2024)
  • 2025 California Electrical Code (based on the 2023 NEC), California Building Code, Energy Code and Fire Code
  • Cal/OSHA Title 8 safety orders
  • American Electricians' Handbook; Photovoltaic Systems (ATP)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Planning and Estimating28
Rough Wiring27
Finish Wiring and Trim11
Startup, Troubleshooting, and Maintenance16
Safety18

Exam day details

  • Administered by PSI Services for the California Contractors State License Board (CSLB).
  • Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
  • Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
  • You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
  • Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
  • The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
  • Work worth $500 or more (labor and materials) requires a California contractor license.

Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.

Frequently asked questions

What's on the California C-10 exam?

CSLB lists approximate weights: planning and estimating 28%, rough wiring 27%, safety 18%, startup, troubleshooting and maintenance 16% and finish wiring and trim 11%. Energy production and storage (solar PV, wind, generators, batteries) appears inside the first four sections.

Which electrical code edition does the C-10 exam use?

CSLB's study guide cites the 2025 California Electrical Code, which is the 2023 NEC with California amendments, in effect from January 1, 2026.

Is the C-10 exam the same as the DIR electrician certification?

No. The C-10 exam licenses the contracting business through CSLB. Electricians who work for a C-10 contractor are certified separately by the DIR Electrician Certification Unit.

How many questions are on the exam and what score do I need?

CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.

Free questions with answers

Show all 10 free questions and answers
  1. A job needs 23 duplex receptacles. The supplier charges $2.40 each plus 7.75% sales tax and gives one free receptacle for every 10 purchased. If you buy only as many as needed to end up with 23, what is the total cost?

    Answer: $54.31

    With the free-item deal, buying 21 receptacles yields 2 free, so 23 are in hand. 21 x $2.40 = $50.40. Tax is 7.75%: $50.40 x 1.0775 = $54.31. Paying for all 23 gives $59.48; buying only 20 leaves you short; $50.40 omits the tax.

    Reference: General trade practice, material takeoff and sales-tax arithmetic

  2. A single-phase 120-volt, 20-ampere load is 100 feet from the panel (one-way distance) on 12 AWG copper (12.9 ohm-CM per foot, 6,530 circular mils). What is the approximate voltage drop?

    Answer: 7.9 volts

    Single-phase drop = 2 x K x I x L / CM = 2 x 12.9 x 20 x 100 / 6,530 = 7.9 V (about 6.6% of 120 V). 3.95 V forgets the factor of 2 for the round trip; 15.8 V doubles the length twice; 11.2 V does not follow from the formula. The 3% / 5% figures are Informational Note recommendations in 210.19 and 215.2(A).

    Reference: 2025 California Electrical Code (NEC 2023 base), 210.19(A) Informational Note and Chapter 9 Table 8

  3. A new 20-inch-wide panelboard is being mounted on a wall. What is the minimum width of the working space in front of it?

    Answer: 30 inches

    The working space width must be the width of the equipment or 30 in., whichever is greater, and must allow doors to open at least 90 degrees. The panel is only 20 in., so 30 in. governs. 24 in. is the minimum width of an entrance to the working space for large equipment, a different rule.

    Reference: 2025 California Electrical Code (NEC 2023 base), 110.26(A)(2)

  4. The working space in front of new electrical panelboards must be clear from the floor up to a minimum height of what?

    Answer: 6 1/2 feet or the height of the equipment, whichever is greater

    The working space extends from grade, floor or platform to 6 1/2 ft (2.0 m) or the height of the equipment, whichever is greater. There is a limited exception for existing dwelling units with service equipment or panelboards of 200 A or less.

    Reference: 2025 California Electrical Code (NEC 2023 base), 110.26(A)(3)

  5. What is the maximum height of the center of the operating handle of a panelboard circuit breaker or switch in its highest position above the floor?

    Answer: 6 ft 7 in.

    Switches and circuit breakers used as switches must be reachable from a readily accessible place, with the center of the handle in its highest position not more than 6 ft 7 in. above the floor or working platform (with limited exceptions such as busway and equipment-adjacent switches).

    Reference: 2025 California Electrical Code (NEC 2023 base), 404.8(A) and 240.24(A)

  6. A single-pole wall switch will control a ceiling light in a new hallway on a general-purpose grounded branch circuit. Under the 2023-based Code, what is generally required in the switch box?

    Answer: A grounded (neutral) conductor, with limited exceptions

    404.2(C) requires the grounded circuit conductor at switch locations controlling lighting loads on grounded general-purpose branch circuits serving bathrooms, hallways, stairways and habitable rooms, with listed exceptions. It is there so electronic controls can be powered later.

    Reference: 2025 California Electrical Code (NEC 2023 base), 404.2(C)

  7. After applying locks and tags to isolate a panel feeding a machine, what must the authorized employee do before starting work?

    Answer: Verify that isolation and de-energization have been achieved

    The energy control procedure requires verification of isolation before work starts on locked-out or tagged-out equipment, for example by testing that the equipment will not operate and by checking for stored energy. Locks and tags are never removed to begin work.

    Reference: 29 CFR (federal OSHA), 29 CFR 1910.147(d)(6)

  8. Rubber insulating gloves marked Class 0 are rated for a maximum use voltage of what?

    Answer: 1,000 volts ac

    Table I-4 in the OSHA standard on electrical protective equipment lists maximum use voltages: Class 00 is 500 V ac, Class 0 is 1,000 V ac, Class 1 is 7,500 V ac, Class 2 is 17,000 V ac. Gloves must also be inspected before each use and electrically tested at set intervals.

    Reference: 29 CFR (federal OSHA), 29 CFR 1910.137, Table I-4

  9. An electrician replaces a worn receptacle in a dwelling bedroom. The branch circuit is not protected by an AFCI breaker, and no upstream AFCI device is present. Which replacement satisfies the Code's arc-fault protection rule for replaced receptacles?

    Answer: A listed outlet branch-circuit type AFCI receptacle

    If a receptacle in an area listed in 210.12 (such as a bedroom) is replaced, the replacement must be an outlet branch-circuit type AFCI receptacle, be protected by one, or be on a combination-type AFCI breaker. GFCI and surge devices do not provide arc-fault protection, and the exception that allows some extensions without AFCI does not apply to replacements.

    Reference: 2025 California Electrical Code, 406.4(D)(4); 210.12

  10. A 40-ampere circuit is wired with 8 AWG copper THHN (90 degree C insulation) to a breaker marked only for 14 AWG through 1 AWG conductors, with no listing for higher temperatures. The 60, 75 and 90 degree C ampacities of 8 AWG copper are 40, 50 and 55 amperes. Which ampacity limits the circuit at the terminations?

    Answer: 40 A, the 60 degree C column

    For circuits of 100 A or less, or equipment marked for 14 AWG through 1 AWG, terminals are presumed 60 degree C unless listed and marked otherwise. Higher-rated insulation may be used, but the ampacity is taken from the 60 degree C column (40 A). The 90 degree rating can be used only for derating calculations, not to exceed the terminal rating.

    Reference: 2025 California Electrical Code, 110.14(C)(1)(a)

Sources

Questions last verified October 26, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.