California licensing exam

California C-7 Low Voltage Systems Contractor Exam: Practice Test & Licensing Guide

CSLB's trade exam for the C-7 Low Voltage Systems license: job planning and design, material selection, wire and cable installation, systems configuration, testing and closeout, troubleshooting and safety. Closed book.

Questions
Not published by California
Time limit
3.5 hours
Passing score
Not published by California
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Safety

A technician sets a 25-foot non-self-supporting extension ladder (working length 25 ft) against a wall to reach a ceiling-level cable tray. Following the T8 ladder rule, how far from the wall should the base of the ladder be placed?

Requirements at a glance

AgencyCalifornia Contractors State License Board (CSLB); exams by PSI
Experience4 years of journey-level experience in the trade within the last 10 years
ExamsC-7 Low Voltage Systems trade exam, plus the Law and Business exam
FormatClosed book, 4-choice, 3.5 hours per exam; question count and pass score not published
Study referencesCalifornia Electrical Code (NEC art. 725, 760, 770, 800, 820, 830, 840); BICSI TDMM; TIA standards
Fees$450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints

Qualifiers for a California C-7 Low Voltage Systems contractor license. Taken together with the Law and Business exam. Electricians who work for a C-7 contractor take the separate DIR certification exam.

How to get licensed, step by step

  1. Pick your classification

    Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.

    CSLB: Get Licensed to Build (PDF) (opens in a new tab)

  2. Apply to CSLB

    Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.

    California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)

  3. Schedule Law and Business and the C-7 exam with PSI

    Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.

    PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)

  4. Bond, fees and fingerprints

    After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.

How to prepare

  • The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
  • Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
  • Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
  • The sections are spread evenly (planning 18%, testing and closeout 17%, configuration 16%, materials 15%, safety 15%), so cover every system type: communications, fire alarm, sound and security.
  • Review the NEC articles for Class 2 and 3 circuits, power-limited fire alarm, optical fiber, communications, coaxial and network-powered broadband circuits.
  • Know firestopping of cable penetrations and cable separation rules.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • CSLB C-7 Low Voltage Systems study guide (applies to exams on or after October 1, 2023)
  • 2022 California Building, Electrical and Fire Codes as named in the guide (CEC articles 725, 760, 770, 800, 820, 830 and 840)
  • ANSI/J-STD-710; BICSI Telecommunications Distribution Methods Manual (14th ed.); TIA wiring standards; Ugly's Electrical References
  • Cal/OSHA Title 8 safety orders (2023)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Job Planning and Design18
Material Selection and Estimation15
Wire/Cable Installation and Termination12
Systems Configuration and Installation16
Testing and Project Closeout17
System Troubleshooting, Repairs, or Replacements7
Safety15

Exam day details

  • Administered by PSI Services for the California Contractors State License Board (CSLB).
  • Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
  • Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
  • You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
  • Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
  • The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
  • Work worth $500 or more (labor and materials) requires a California contractor license.

Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.

Frequently asked questions

What's on the California C-7 exam?

CSLB lists approximate weights: job planning and design 18%, testing and project closeout 17%, systems configuration and installation 16%, material selection and estimation 15%, safety 15%, wire and cable installation and termination 12% and troubleshooting, repairs or replacements 7%.

Is the C-7 exam the same as the DIR electrician certification?

No. The C-7 exam licenses the contracting business through CSLB. Electricians who work for a C-7 contractor are certified separately by the DIR Electrician Certification Unit.

How many questions are on the exam and what score do I need?

CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.

Free questions with answers

Show all 10 free questions and answers
  1. A technician sets a 25-foot non-self-supporting extension ladder (working length 25 ft) against a wall to reach a ceiling-level cable tray. Following the T8 ladder rule, how far from the wall should the base of the ladder be placed?

    Answer: 6 ft 3 in

    Section 3276(e)(9) calls for a pitch where the horizontal distance from the top support to the foot is one-quarter of the working length: 25 ft / 4 = 6.25 ft = 6 ft 3 in. 5 ft would be a 1:5 slope, 8 ft 4 in is one-third (25/3), and 12 ft 6 in is half the length and far too shallow.

    Reference: California Code of Regulations, Title 8, Section 3276(e)(9)

  2. A designer plans to run unshielded Cat 6 cable on the surface of a wall next to a bundle of 120 V branch-circuit conductors that are not in a raceway or metal-sheathed cable. What minimum separation does the code require between the communications cable and those power conductors?

    Answer: 50 mm (2 in.)

    Section 800.133(B) requires communications cables to be separated at least 50 mm (2 in.) from electric light, power, Class 1 and non-power-limited fire alarm conductors, unless the power conductors are in a raceway or metal-sheathed, metal-clad, nonmetallic-sheathed, AC or UF cable (Exception No. 1), or a permanent nonconductor barrier is used. The 6 mm (1/4 in.) figure applies to separation inside enclosures in specific cases, not to open wiring.

    Reference: 2025 California Electrical Code (NEC 2023 base), Section 800.133(B)

  3. Which characteristic impedance is standard for coaxial cable used in CATV and satellite distribution (such as RG-6)?

    Answer: 75 ohms

    CATV, broadband and satellite distribution uses 75-ohm coaxial cable with F connectors. 50-ohm coax is used for radio transmitters and some test equipment, 100 ohms is the nominal impedance of balanced twisted pair data cable, and 120 ohms is used in some legacy digital audio and telecom cabling.

    Reference: General trade practice, General trade practice: coaxial cable impedance

  4. A low voltage contractor's job cost is $48,000. The company wants a 25% gross profit margin on the selling price. What contract price achieves that margin?

    Answer: $64,000

    Margin is a percent of price, so Price = Cost / (1 - 0.25) = $48,000 / 0.75 = $64,000, giving a $16,000 profit (25% of $64,000). $60,000 is a 25% markup on cost ($48,000 x 1.25), which yields only a 20% margin. $72,000 is a 50% markup and $36,000 subtracts 25% from cost.

    Reference: General trade practice, General trade practice: markup versus margin

  5. Class 2 cable emerges from a conduit sleeve that is used for mechanical protection of the cable. What does Section 722.24(A) require at the point where the cable leaves the raceway?

    Answer: A bushing

    Section 722.24(A) states a bushing shall be installed where cables emerge from a raceway used for mechanical support or protection, in accordance with 300.15(C). The bushing prevents the cable jacket from being cut on the sharp edge of the raceway end. A pull box, hub or ground clamp is not what the section calls for.

    Reference: 2025 California Electrical Code (NEC 2023 base), Section 722.24(A)

  6. A low voltage contractor is installing racks and cabling in a room that is classified as an information technology equipment room under Article 645. Which provision applies to the room's power and HVAC disconnect?

    Answer: An approved means must disconnect power to all electronic equipment and dedicated HVAC, and close smoke dampers

    Section 645.10 requires an approved means to disconnect power to all electronic equipment in the IT equipment room or designated zones, plus a similar means to disconnect dedicated HVAC serving the room and cause required fire and smoke dampers to close, with remote disconnect controls at approved, readily accessible locations. Critical operations data systems can use the 645.10(B) alternative.

    Reference: 2025 California Electrical Code (NEC 2023 base), Section 645.10

  7. Two buildings on a campus are connected by a copper telephone cable that runs in the open between them, and the site has lightning exposure. What does Section 805.90(A) require?

    Answer: A listed primary protector at each end of the interbuilding circuit

    Section 805.90(A) requires, where there is a lightning exposure, each interbuilding circuit on a premises to be protected by a listed primary protector at each end. Protectors are also required on circuits partly in aerial cable not confined within a block, or exposed to light or power over 300 volts to ground. A fuse is not a primary protector.

    Reference: 2025 California Electrical Code (NEC 2023 base), Section 805.90(A)

  8. During project closeout, a contractor finds a dead, unlabeled optical fiber cable left in the ceiling from a previous tenant's system. What does Section 770.25 require for the accessible portion of abandoned optical fiber cables?

    Answer: It shall be removed

    Section 770.25 requires the accessible portion of abandoned optical fiber cables to be removed; 722.25, 760.25 and 800.25 say the same for their cable types. Where cable is identified for future use with a tag, the tag must be durable enough for the environment. Leaving abandoned cable adds fuel load and congests pathways.

    Reference: 2025 California Electrical Code (NEC 2023 base), Section 770.25

  9. A single-mode fiber link is 2.0 km long (0.35 dB/km) with two mated connector pairs (0.75 dB each) and one fusion splice (0.3 dB). What is the estimated total link loss?

    Answer: 2.5 dB

    Fiber attenuation = 2.0 km x 0.35 dB/km = 0.70 dB. Connectors = 2 x 0.75 dB = 1.50 dB. Splice = 0.30 dB. Total = 0.70 + 1.50 + 0.30 = 2.50 dB. 2.2 dB leaves out the splice, 1.75 dB counts only one connector pair, and 3.25 dB adds an extra connector pair.

    Reference: General trade practice, General trade practice: fiber loss budget

  10. A riser-rated (CMR) communications cable is damaged and the only cable on the truck is plenum-rated. Under the substitution table in Section 805.154, is it permitted to use it?

    Answer: Yes, Type CMP is a permitted substitution for Type CMR

    Table 805.154 lists CMP as the permitted substitution for CMR (and CMR or CMP for CMG/CM, and CMP, CMR, CMG or CM for CMX). A higher-rated cable can replace a lower-rated type, never the reverse. Run length is not a condition.

    Reference: 2025 California Electrical Code (NEC 2023 base), Section 805.154 and Table 805.154

Sources

Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.