California licensing exam

California C-46 Solar Contractor Exam: Practice Test & Licensing Guide

CSLB's trade exam for the C-46 Solar license: planning and estimating, solar panel and collector installation, PV system installation and commissioning, solar thermal, service and maintenance, and safety. Closed book.

Questions
Not published by California
Time limit
3.5 hours
Passing score
Not published by California
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Planning and Estimating

A 6 kW dc array is expected to see 5 peak sun hours per day, and the installer applies a 0.80 system derate for wiring, inverter, soiling and temperature losses. About how much energy should it produce on an average day?

Requirements at a glance

AgencyCalifornia Contractors State License Board (CSLB); exams by PSI
Experience4 years of journey-level experience in the trade within the last 10 years
ExamsC-46 Solar trade exam, plus the Law and Business exam
FormatClosed book, 4-choice, 3.5 hours per exam; question count and pass score not published
Study references2025 California Electrical Code (NEC 2023 art. 690, 705, 706); ATP Photovoltaic Systems; Cal/OSHA Title 8
Fees$450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints

Qualifiers for a California C-46 Solar contractor license. Taken together with the Law and Business exam.

How to get licensed, step by step

  1. Pick your classification

    Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.

    CSLB: Get Licensed to Build (PDF) (opens in a new tab)

  2. Apply to CSLB

    Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.

    California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)

  3. Schedule Law and Business and the C-46 exam with PSI

    Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.

    PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)

  4. Bond, fees and fingerprints

    After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.

How to prepare

  • The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
  • Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
  • Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
  • PV system installation and commissioning is about 28% of the exam: review array layout, string sizing, grid interface, labeling and testing.
  • CSLB's guide still names the 2022 codes; study the current NEC articles on solar PV (690), interconnected sources (705) and energy storage (706).
  • Safety is about 19%: know fall protection on roofs and electrical safety around energized PV conductors.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • CSLB C-46 Solar study guide (applies to exams on or after July 1, 2023; CSLB still serves this guide and it names 2022 codes)
  • 2022 California Building, Electrical, Energy, Fire, Mechanical and Plumbing Codes as named in the guide; NEC 2023 articles 690, 705 and 706 for current practice
  • Cal/OSHA Title 8 safety orders
  • ATP Photovoltaic Systems; Ugly's Electrical References; Holt PV 2020; OG-300; USHGC 2021

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Planning and Estimating14
Solar Panel/Collector Installation17
Photovoltaic (PV) System Installation and Commissioning28
Solar Thermal Installation7
Service, Operation, and Maintenance15
Safety19

Exam day details

  • Administered by PSI Services for the California Contractors State License Board (CSLB).
  • Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
  • Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
  • You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
  • Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
  • The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
  • Work worth $500 or more (labor and materials) requires a California contractor license.

Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.

Frequently asked questions

What's on the California C-46 exam?

CSLB lists approximate weights: photovoltaic system installation and commissioning 28%, safety 19%, solar panel and collector installation 17%, service, operation and maintenance 15%, planning and estimating 14% and solar thermal installation 7%.

Which code edition should I study for C-46?

CSLB's study guide still names the 2022 California codes. We draft against the current 2025 California Electrical Code (NEC 2023 articles 690, 705 and 706) and tell you when the guide's list is out of date.

How many questions are on the exam and what score do I need?

CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.

Free questions with answers

Show all 10 free questions and answers
  1. A 6 kW dc array is expected to see 5 peak sun hours per day, and the installer applies a 0.80 system derate for wiring, inverter, soiling and temperature losses. About how much energy should it produce on an average day?

    Answer: 24 kWh

    Daily energy = array kW x peak sun hours x derate = 6 x 5 x 0.80 = 24 kWh. 30 kWh forgets the derate (6 x 5), 4.8 kWh multiplies kW by the derate only (6 x 0.80), and 37.5 kWh divides by the derate (30 / 0.80) instead of multiplying.

    Reference: General trade practice, Concept: Energy estimate with derate factor

  2. Dc source conductors of a roof-mounted array operating above 30 volts will be readily accessible to unqualified persons where they are not guarded. Which wiring methods does the Code allow?

    Answer: Type MC cable, multiconductor jacketed cable, or a raceway

    Section 690.31(A)(2) requires PV system dc circuit conductors over 30 volts that are readily accessible to unqualified persons and not guarded to be installed in Type MC cable, multiconductor jacketed cable or a raceway.

    Reference: 2025 California Electrical Code (NEC 2023 base), 690.31(A)(2)

  3. BIPV roof panels are being installed. How is the required underlayment applied outside high-wind areas?

    Answer: Shingle fashion, parallel to and starting from the eave, lapped 2 inches and fastened sufficiently to hold in place

    Section 1507.17.4 requires BIPV roof panel underlayment to be applied shingle fashion, parallel to and starting from the eave, lapped 2 inches and fastened sufficiently to hold it in place. More stringent laps and attachment apply in high-wind areas.

    Reference: 2025 California Building Code (IBC 2024 base), 1507.17.4 Underlayment Application

  4. At what dc voltage level, measured between any two conductors, must a PV system have a listed PV arc-fault circuit interrupter (or equivalent protection) unless an exception applies?

    Answer: 80 volts dc or greater

    Section 690.11 requires PV systems with dc circuits operating at 80 volts dc or greater between any two conductors to be protected by a listed PV arc-fault circuit interrupter or other listed equivalent protection, unless the circuits meet the exception (metal-clad cable, metal raceway or underground, with conditions).

    Reference: 2025 California Electrical Code (NEC 2023 base), 690.11 Arc-Fault Circuit Protection (dc)

  5. After rapid shutdown is initiated on a rooftop array, how far must controlled conductors outside the array boundary be reduced, and how quickly?

    Answer: To 30 volts or less within 30 seconds

    Section 690.12(B)(1) limits controlled conductors outside the array boundary (or more than 1 m (3 ft) from the point of entry inside a building) to not more than 30 volts within 30 seconds of rapid shutdown initiation, measured between any two conductors and between any conductor and ground.

    Reference: 2025 California Electrical Code (NEC 2023 base), 690.12(B)(1)

  6. A solar water heating system uses a heat exchanger to heat potable water with a glycol-based collector loop. What does the plumbing code require of the heat exchanger?

    Answer: That it protect the potable water from contamination by the heat-transfer medium

    Section 603.5.4 requires heat exchangers used for heat transfer, heat recovery or solar heating to protect the potable water system from being contaminated by the heat-transfer medium. Single-wall exchangers are allowed only under the stated conditions; double-wall types separate the two fluids with a space vented to the atmosphere.

    Reference: 2025 California Plumbing Code (UPC 2024 base), 603.5.4 Heat Exchangers

  7. A technician opens the PV system disconnect to service the inverter and finds the label about line and load terminals. What does it mean for the service task?

    Answer: The terminals may still be energized with the switch off, so verify with a meter first

    Section 690.13(B) requires the warning where line and load terminals may be energized in the open position, such as when the array feeds the line side. Work should proceed only after testing each conductor, with lockout/tagout under Title 8 Section 3314 where applicable.

    Reference: 2025 California Electrical Code (NEC 2023 base), 690.13(B)

  8. A homeowner adds a battery to an existing PV system. Which update is needed at the service equipment?

    Answer: The power-source plaque or directory must show each power source disconnect location

    Section 705.10 requires a permanent plaque, label or directory at each service equipment location denoting each power source disconnecting means, with the multiple-sources caution marking. Adding a source means the identification must reflect it.

    Reference: 2025 California Electrical Code (NEC 2023 base), 705.10 Identification of Power Sources

  9. At what height of potential fall must Cal/OSHA construction employees working at unprotected edges wear a personal fall arrest, restraint or positioning system, unless other protection is provided?

    Answer: More than 7 1/2 feet

    Section 1670(a) requires approved personal fall arrest, restraint or positioning systems for employees exposed to falling in excess of 7 1/2 feet from the perimeter of a structure, unprotected sides and edges, leading edges, shaftways and openings, or roof surfaces steeper than 7:12, unless otherwise adequately protected.

    Reference: California Code of Regulations, Title 8, 1670(a)

  10. What minimum breaking strength must a lanyard or vertical lifeline used in a personal fall arrest system have?

    Answer: 5,000 pounds

    Section 1670(b)(3) states that lanyards and vertical lifelines shall have a minimum breaking strength of 5,000 pounds. Anchorages (1670(b)(10)) must support at least 5,000 pounds per employee attached.

    Reference: California Code of Regulations, Title 8, 1670(b)(3)

Sources

Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.