California licensing exam

California C-9 Drywall Contractor Exam: Practice Test & Licensing Guide

CSLB's trade exam for the C-9 Drywall license: planning and estimating, preparation, framing and layout, installation and repair, finishing, and safety. Closed book.

Questions
Not published by California
Time limit
3.5 hours
Passing score
Not published by California
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Planning and Estimating

A room is 12 ft x 14 ft with 8 ft walls. Walls and ceiling are all covered with 4 x 8 sheets, ignoring openings, and the estimator adds 10% for waste. How many sheets should be ordered?

Requirements at a glance

AgencyCalifornia Contractors State License Board (CSLB); exams by PSI
Experience4 years of journey-level experience in the trade within the last 10 years
ExamsC-9 Drywall trade exam, plus the Law and Business exam
FormatClosed book, 4-choice, 3.5 hours per exam; question count and pass score not published
Study references2025 California Building Code; ASTM C840 and C754; Gypsum Association GA-216, GA-214, GA-600
Fees$450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints

Qualifiers for a California C-9 Drywall contractor license. Taken together with the Law and Business exam.

How to get licensed, step by step

  1. Pick your classification

    Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.

    CSLB: Get Licensed to Build (PDF) (opens in a new tab)

  2. Apply to CSLB

    Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.

    California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)

  3. Schedule Law and Business and the C-9 exam with PSI

    Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.

    PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)

  4. Bond, fees and fingerprints

    After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.

How to prepare

  • The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
  • Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
  • Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
  • Installation and repair is about 32%: practice board types, fastener spacing, framing and fire-rated assemblies.
  • Finishing (about 17%) includes the levels of finish; learn what each level means.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • CSLB C-9 Drywall study guide (applies to exams on or after December 1, 2025)
  • 2025 California Building Code (gypsum board and fire-resistance provisions)
  • ASTM C840 and C754; Gypsum Association GA-216, GA-214 (levels of finish) and GA-600; USG Gypsum Construction Handbook
  • Cal/OSHA Title 8 safety orders (2025)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Planning and Estimating18
Preparation, Framing, and Layout14
Installation and Repair32
Finishing17
Safety19

Exam day details

  • Administered by PSI Services for the California Contractors State License Board (CSLB).
  • Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
  • Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
  • You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
  • Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
  • The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
  • Work worth $500 or more (labor and materials) requires a California contractor license.

Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.

Frequently asked questions

What's on the California C-9 exam?

CSLB lists approximate weights: installation and repair 32%, safety 19%, planning and estimating 18%, finishing 17% and preparation, framing and layout 14%.

Does the C-9 exam cover levels of finish?

The study guide names Gypsum Association GA-214 on levels of finish, so know Levels 0 through 5 and where each is used.

How many questions are on the exam and what score do I need?

CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.

Free questions with answers

Show all 10 free questions and answers
  1. A room is 12 ft x 14 ft with 8 ft walls. Walls and ceiling are all covered with 4 x 8 sheets, ignoring openings, and the estimator adds 10% for waste. How many sheets should be ordered?

    Answer: 21 sheets

    Walls: perimeter 2 x (12 + 14) = 52 ft x 8 ft = 416 sq ft. Ceiling: 12 x 14 = 168 sq ft. Total 584 sq ft; with 10% waste 584 x 1.10 = 642.4 sq ft. 642.4 / 32 = 20.08, rounded up to 21. 19 is the no-waste answer (584 / 32 = 18.25 rounds to 19); 18 rounds that down; 20 rounds the waste figure down.

    Reference: General trade practice, Estimating math: room take-off with waste factor

  2. A job needs 40 sheets of board, and each sheet takes 32 screws. Screws come in 1,000-count boxes. How many boxes must be bought, with no allowance for waste?

    Answer: 2 boxes

    40 sheets x 32 screws = 1,280 screws. 1,280 / 1,000 = 1.28 boxes, and only whole boxes can be bought, so 2. One box (1,000 screws) falls 280 short. Three or four boxes would only come from doubling the sheet count or adding unrealistic waste.

    Reference: General trade practice, Estimating math: fastener quantity in whole boxes

  3. Under the CRC, 1x2 wood furring strips may be used to support gypsum board over solid backing or framing spaced not more than how far on center?

    Answer: 24 in.

    Section R702.3.2 permits wood furring strips not less than 1 x 2 nominal over solid backing or framing spaced not more than 24 in. o.c. Other wood framing must be at least 2 in. nominal in the least dimension.

    Reference: 2025 California Residential Code, Section R702.3.2

  4. Under CRC Table R702.3.5, what is the maximum screw spacing for 1/2 in. board applied perpendicular to ceiling framing at 24 in. on center, without adhesive?

    Answer: 12 in.

    Table R702.3.5 shows 1/2 in. ceiling board applied perpendicular to 24 in. o.c. framing with screws at 12 in. maximum (nails at 7 in.). 7 in. is the nail spacing; 8 in. is the nail spacing for walls; 16 in. is the wall screw spacing at 16 in. o.c. framing.

    Reference: 2025 California Residential Code, Table R702.3.5

  5. An enclosed closet under a stair is reached by a door. What protection does CRC R302.7 require on the enclosed side?

    Answer: 1/2 in. gypsum board on walls, under-stair surface and soffits

    Section R302.7 requires walls, the under-stair surface and any soffits of an enclosed space under stairs to be protected on the enclosed side with 1/2 in. gypsum board.

    Reference: 2025 California Residential Code, Section R302.7

  6. A 2-hour rated gypsum wall has individual noncommunicating stud cavities. Under CBC 714.4.2, what spacing applies to steel electrical boxes (up to 16 sq in.) on opposite sides of the wall?

    Answer: At least 24 in. apart horizontally, unless fireblocking or putty pads are used

    Section 714.4.2, Exception 1, allows steel boxes of 16 sq in. or less (aggregate openings no more than 100 sq in. per 100 sq ft of wall, annular space 1/8 in. max) when boxes on opposite sides are 24 in. apart horizontally in walls with noncommunicating stud cavities, or separated by solid fireblocking, listed putty pads or other listed materials.

    Reference: 2025 California Building Code, Section 714.4.2 (Exception 1)

  7. Which Level of Finish is the lowest that still has tape embedded in joint compound at the joints, suited to areas not open to view such as above a ceiling?

    Answer: Level 1

    Level 0 is no taping or finishing at all (temporary construction). Level 1 is tape embedded in joint compound at joints and interior angles with no further finishing; UFGS 09 29 00 paragraph 3.4 assigns Level 1 to plenum areas above ceilings. Levels 3 and 5 are decorative-ready finishes.

    Reference: UFGS 09 29 00 Gypsum Board (Aug. 2024, Chg. 1), 3.4 Finishing of Gypsum Board (Levels per GA-214)

  8. A small amount of old, hardened setting compound is left in a mixing bucket. What happens if new setting compound is mixed in it?

    Answer: The old set material speeds the new mix and shortens working time

    Bits of hardened setting compound act as seeds that make the new batch set faster and unpredictably. Buckets and tools used for setting compound must be cleaned completely before mixing a new batch.

    Reference: General trade practice, General trade practice: mixing setting compound

  9. What is the required height of the top rail of a standard railing under Section 1620(a)(1)?

    Answer: Not less than 42 in. nor more than 45 in.

    Section 1620(a)(1): the top rail must be not less than 42 in. nor more than 45 in. above the floor, platform, runway or ramp, with a mid-rail halfway between top rail and floor.

    Reference: California Code of Regulations, Title 8, Section 1620(a)(1)

  10. At what height of fall exposure must fall protection be worn at the perimeter of a structure or at unprotected edges under Section 1670(a)?

    Answer: More than 7-1/2 ft

    Section 1670(a) requires approved personal fall arrest, restraint or positioning systems for employees exposed to falls in excess of 7-1/2 ft from the perimeter of a structure, unprotected sides and edges, leading edges, shaftways and openings. 15 ft appears in 1637(a) exception 1 for scaffolds.

    Reference: California Code of Regulations, Title 8, Section 1670(a)

Sources

Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.