| Agency | California Contractors State License Board (CSLB); exams by PSI |
|---|---|
| Experience | 4 years of journey-level experience in the trade within the last 10 years |
| Exams | B General Building trade exam, plus the Law and Business exam |
| Format | Closed book, 4-choice, 3.5 hours per exam; question count and pass score not published |
| Study references | 2025 California building, electrical, plumbing and mechanical codes; Cal/OSHA Title 8 |
| Fees | $450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints |
Qualifiers for a California B General Building contractor license. Taken together with the Law and Business exam.
Official links
How to get licensed, step by step
Pick your classification
Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.
Apply to CSLB
Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.
California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)
Schedule Law and Business and the B exam with PSI
Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.
PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)
Bond, fees and fingerprints
After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.
How to prepare
- The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
- Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
- Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
- Core trades are about 30% of the exam (plumbing, electrical, HVAC, concrete, earthwork, insulation, roofing): you need broad basics in every trade.
- Framing and structural components are about 20%: know spans, bearing, connections and load paths.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
CSLB examination study guide for your classificationEssential
Free from CSLB. Lists the sections, approximate weights and references for the exam.
2025 California Building, Electrical, Plumbing and Mechanical Codes
Not allowed in the exam room. CSLB's study guides cite the 2025 California codes (effective January 1, 2026).
Official reference list (as published by the testing agency)
- CSLB B General Building study guide (1/2025)
- 2025 California Building Code, Residential Code, Electrical Code, Plumbing Code, Mechanical Code, Energy Code, Fire Code and CALGreen
- Cal/OSHA Title 8 construction safety orders
- California MUTCD (2014 Rev 4) and NAAWS (named in the study guide; the exam is closed book)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Planning and Estimating | 15 | |
| Framing and Structural Components | 20 | |
| Core Trades | 30 | |
| Finish Trades | 20 | |
| Safety | 15 |
Exam day details
- Administered by PSI Services for the California Contractors State License Board (CSLB).
- Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
- Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
- You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
- Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
- The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
- Work worth $500 or more (labor and materials) requires a California contractor license.
Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.
Frequently asked questions
What's on the California B exam?
CSLB lists approximate weights: core trades 30% (plumbing, electrical, HVAC, concrete, earthwork and surveying, insulation, acoustical and weatherproofing, roofing), framing and structural components 20%, finish trades 20%, planning and estimating 15% and safety 15%.
Can I bring the building code to the B exam?
No. The exam is closed book, so you need to know the codes and trade practices without looking them up.
How many questions are on the exam and what score do I need?
CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.
Free questions with answers
Show all 10 free questions and answers
A gable roof has a plan (horizontal) footprint of 2,000 square feet and a 6:12 pitch (slope factor 1.118). Shingles are sold by the square (100 square feet) and the estimator adds 10 percent waste. How many squares should be ordered, rounded up to a whole square?
Answer: 25 squares
Roof surface = 2,000 x 1.118 = 2,236 square feet = 22.36 squares. Adding 10 percent waste: 22.36 x 1.10 = 24.6, rounded up to 25 squares. Ignoring the pitch gives 20 squares (or 22 with waste added to the plan area alone); 27 comes from adding 20 percent waste (26.8).
Reference: General trade practice, Concept: roof area and waste takeoff
A contractor's job cost is $80,000 and the company wants a 20 percent gross margin on the selling price (not 20 percent markup on cost). What selling price is needed?
Answer: $100,000
Margin is a percentage of price, so price x (1 - 0.20) = cost. Price = $80,000 / 0.80 = $100,000, and the $20,000 profit is 20 percent of that price. Multiplying cost by 1.20 gives $96,000, which is only a 16.7 percent margin. $106,667 divides by 0.75 (confusing the 25 percent markup equivalent with the margin), and $104,000 is a 30 percent markup on cost.
Reference: General trade practice, Concept: gross margin versus markup
In wood-framed concealed stud wall spaces, fireblocking must be provided at the ceiling and floor levels and horizontally at intervals not exceeding what distance?
Answer: 10 feet
CRC R302.11 requires fireblocking in concealed stud-wall spaces vertically at ceiling and floor levels and horizontally at intervals not exceeding 10 feet. It is also required at soffits and drop ceilings, between stair stringers, and around pipes and wires at floor and ceiling levels.
Reference: 2025 California Residential Code, R302.11
What is the minimum nominal size of wood rafter ties, and the maximum spacing, to resist rafter thrust in conventional framing?
Answer: 2 by 4 at not more than 24 inches on center
CRC R802.5.2.2 requires wood rafter ties not less than 2 by 4 inches, installed per Table R802.5.2(1) at a maximum of 24 inches on center. Ties resist the outward thrust of rafters at the wall tops.
Reference: 2025 California Residential Code, R802.5.2.2
At what height range above the stair nosing line must a required stair handrail be installed?
Answer: Not less than 34 inches and not more than 38 inches
CRC R320.2 requires handrail height, measured vertically from the sloped plane adjoining the tread nosings, to be 34 to 38 inches. The 30 to 34 inch range is only for alternating tread devices and ship's ladders. Handrails are required on at least one side of any flight with four or more risers (R318.7.8).
Reference: 2025 California Residential Code, R320.2
A horizontal 3-inch building drain runs 40 feet to the point of disposal at the standard minimum uniform slope. How much total drop does the run need?
Answer: 10 inches
CPC 708.1 requires horizontal drainage piping to be run at a uniform slope of not less than 1/4 inch per foot (2 percent). 40 feet x 1/4 inch = 10 inches. 5 inches uses 1/8 inch per foot, which the code allows only for 4-inch and larger drains where impractical and approved by the authority; 20 inches uses 1/2 inch per foot.
Reference: 2025 California Plumbing Code, 708.1
A completed copper water supply system is tested with air instead of water. What is the minimum air test pressure, and how long must the system hold it without leakage?
Answer: 50 psi for at least 15 minutes
CPC 609.4 allows testing with water at not less than working pressure, or with air at a minimum of 50 psi (plastic pipe is not tested with air except PEX and similar tube where the manufacturer permits it). The system must hold the pressure without leakage for not less than 15 minutes.
Reference: 2025 California Plumbing Code, 609.4
A door connects an attached garage to the living area of a house. Which door meets the California Residential Code?
Answer: A self-latching, self-closing, 1-3/8 inch solid wood door
CRC R302.5.1 requires doors between a garage and the dwelling to be solid wood or solid or honeycomb-core steel doors at least 1-3/8 inches thick, or 20-minute fire-rated doors, and self-latching with a self-closing or automatic-closing device. Openings from the garage directly into a sleeping room are not allowed.
Reference: 2025 California Residential Code, R302.5.1
What are the maximum fastener spacings for 1/2-inch gypsum board applied to a ceiling with framing at 16 inches on center, without adhesive?
Answer: Nails 7 inches on center; screws 12 inches on center
CRC Table R702.3.5 sets ceiling fastener spacing for 1/2-inch board at 16 inches framing at a maximum of 7 inches for nails and 12 inches for screws. Wall application allows 8 inches for nails. Closer spacing of 6 inches applies only to Type X garage ceilings beneath habitable rooms.
Reference: 2025 California Residential Code, Table R702.3.5
Construction is 30 feet high and located 3 feet from the lot line. Which pedestrian protection does CBC Table 3306.1 require?
Answer: A barrier and a covered walkway
CBC Table 3306.1 requires a barrier and covered walkway when construction is more than 8 feet high and less than 5 feet from the lot line. Construction railings alone apply only to work 8 feet or less in height; a barrier alone applies when the distance to the lot line is between one-fourth and one-half the height of construction.
Reference: 2025 California Building Code, Table 3306.1
Sources
- CSLB: Examination study guides (content outlines) (opens in a new tab)
- CSLB: Examination FAQ (opens in a new tab)
- CSLB: List of all fees (opens in a new tab)
- CSLB: Get Licensed to Build (PDF) (opens in a new tab)
Questions last verified October 26, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.