Requirements at a glance
| Agency | California Contractors State License Board (CSLB); exams by PSI |
|---|---|
| Experience | 4 years of journey-level experience in the trade within the last 10 years |
| Exams | C-8 Concrete trade exam, plus the Law and Business exam |
| Format | Closed book, 4-choice, 3.5 hours per exam; question count and pass score not published |
| Study references | 2025 California Building Code; NRMCA Concrete in Practice; PCA Design and Control of Concrete Mixtures |
| Fees | $450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints |
Qualifiers for a California C-8 Concrete contractor license. Taken together with the Law and Business exam.
Official links
How to get licensed, step by step
Pick your classification
Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.
Apply to CSLB
Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.
California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)
Schedule Law and Business and the C-8 exam with PSI
Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.
PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)
Bond, fees and fingerprints
After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.
How to prepare
- The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
- Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
- Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
- Planning and estimating (about 28%) and pre-placement preparation (about 27%) are over half the exam: practice cubic-yard takeoffs, forms, reinforcing and subgrade preparation.
- Know placing, finishing and curing basics, plus Cal/OSHA rules on rebar impalement protection and formwork.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
What to study
This is a closed-book exam, so nothing comes into the exam room. Study from these:
CSLB examination study guide for your classificationEssential
Free from CSLB. Lists the sections, approximate weights and references for the exam.
2025 California Building, Electrical, Plumbing and Mechanical Codes
Not allowed in the exam room. CSLB's study guides cite the 2025 California codes (effective January 1, 2026).
Official reference list (as published by the testing agency)
- CSLB C-8 Concrete study guide (applies to exams on or after March 1, 2026)
- 2025 California Building Code and Residential Code
- NRMCA, Concrete in Practice; PCA, Design and Control of Concrete Mixtures (17th ed.); CASQA BMP Handbook
- USA/811 and Government Code 4216 (underground utility notice)
- Cal/OSHA Title 8 safety orders (2026)
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Planning and Estimating | 28 | |
| Pre-placement Preparation | 27 | |
| Placing and Finishing | 17 | |
| Post-placement Tasks | 7 | |
| Safety | 21 |
Exam day details
- Administered by PSI Services for the California Contractors State License Board (CSLB).
- Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
- Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
- You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
- Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
- The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
- Work worth $500 or more (labor and materials) requires a California contractor license.
Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.
Frequently asked questions
What's on the California C-8 exam?
CSLB lists approximate weights: planning and estimating 28%, pre-placement preparation 27%, safety 21%, placing and finishing 17% and post-placement tasks 7%.
Does the C-8 exam cover rebar and formwork safety?
Yes. Pre-placement preparation and safety cover forms, reinforcing steel and impalement protection under the Cal/OSHA construction safety orders.
How many questions are on the exam and what score do I need?
CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.
Free questions with answers
Show all 10 free questions and answers
A 24 ft by 40 ft interior slab on grade is poured at the minimum thickness the residential code allows for a slab-on-ground floor. What is the volume in cubic yards before waste?
Answer: 10.37 cubic yards
CRC R506.1 sets the minimum slab-on-ground thickness at 3-1/2 inches. 3.5 / 12 = 0.2917 ft; 24 x 40 x 0.2917 = 280 cu ft; 280 / 27 = 10.37 cu yd. 11.85 uses 4 inches, 12.44 treats 3.5 inches as 0.35 ft, and 8.89 uses 3 inches.
Reference: 2025 California Residential Code, Section R506.1
A continuous footing runs 220 linear feet and is built at the smallest width and thickness the CRC allows for a concrete footing (R403.1.1). How much concrete is needed before waste?
Answer: 4.07 cubic yards
R403.1.1 sets the minimum footing at 12 inches wide and 6 inches deep. Volume = 220 ft x 1 ft x 0.5 ft = 110 cu ft; 110 / 27 = 4.07 cu yd. 4.89 treats 6 inches as 0.6 ft, 8.15 uses a 12-inch thickness (220 / 27), and 110 forgets to convert cubic feet to cubic yards.
Reference: 2025 California Residential Code, Section R403.1.1
Before a slab-on-ground floor is placed inside the foundation walls of a house, what must be removed from the area under the slab?
Answer: All vegetation, topsoil and foreign material
CRC R506.3 requires the area within the foundation walls to have all vegetation, topsoil and foreign material removed before the slab is placed. Organic material decays and settles, and a vapor retarder does not cure that.
Reference: 2025 California Residential Code, Section R506.3
What is the minimum depth of an exterior footing below the undisturbed ground surface under the CRC (ignoring frost depth)?
Answer: 12 inches
R403.1.4 states exterior footings must be at least 12 inches below the undisturbed ground surface, and must also meet the frost depth rules in R403.1.4.1 where they apply.
Reference: 2025 California Residential Code, Section R403.1.4
Under Government Code 4216, how soon before excavating must a contractor contact the regional notification center (811)?
Answer: 2 working days minimum, no more than 14 calendar days ahead
The CSLB Law Book summary of Government Code 4216 says anyone planning to excavate must contact the regional notification center at least two working days (but not more than 14 calendar days) before excavating. The center issues an inquiry identification number.
Reference: CSLB Law Book 2025, Government Code Sections 4216-4216.9 (Dig Alert)
Concrete will be placed in stay-in-place insulating forms. How does the CRC treat slump for this placement?
Answer: Slump shall exceed 6 inches
R404.1.3.3.4 gives the opposite rule for stay-in-place forms from removable forms: slump of concrete placed in stay-in-place forms shall exceed 6 inches, so the mix flows around the form ties and foam. Removable-form concrete is capped at 6 inches.
Reference: 2025 California Residential Code, Section R404.1.3.3.4
A garage floor with a steel-troweled finish is air-entrained. Under CRC Table R402.2, the air content may be reduced to 3 percent if what else is done?
Answer: Specified compressive strength is raised to at least 4,000 psi
Footnote f to Table R402.2 allows garage floors with a steel-troweled finish to have total air content reduced to not less than 3 percent if the specified compressive strength is increased to not less than 4,000 psi. Lowering strength, thinning the slab or extra curing time are not the trade-off the table allows.
Reference: 2025 California Residential Code, Table R402.2, Footnote f
A new slab will be cured with a liquid membrane-forming curing compound under Caltrans Standard Specifications 90-1.03B(3). When is the compound applied?
Answer: After finishing, just before the moisture sheen disappears
Section 90-1.03B(3) says to apply curing compound after finishing the surface, immediately before the moisture sheen disappears and before drying shrinkage or craze cracks appear (nominal rate 150 sq ft per gallon). Applied before finishing it is worked into the surface; applied after the slab dries, the water it was meant to hold is already gone.
Reference: Caltrans Standard Specifications 2026, Section 90-1.03B(3)
If a trench is dug and no other sloping option is used, what is the steepest slope allowed under Title 8 Section 1541.1(b)(1)(A)?
Answer: 1-1/2 horizontal to 1 vertical
Option 1 in Section 1541.1(b)(1)(A) allows excavations sloped at an angle not steeper than 1-1/2 horizontal to 1 vertical (about 34 degrees from horizontal), the Type C soil slope in Appendix B. Steeper slopes require another option, such as an engineered design.
Reference: California Code of Regulations, Title 8, Section 1541.1(b)(1)(A)
A trench is 5 feet deep and 100 feet long. A ladder, stairway or ramp must be placed so that workers need no more than what lateral travel?
Answer: 25 feet
Section 1541(c)(2) requires a stairway, ladder, ramp or other safe means of egress in trench excavations 4 feet or more in depth, located so no more than 25 feet of lateral travel is required for employees.
Reference: California Code of Regulations, Title 8, Section 1541(c)(2)
Sources
- CSLB: Examination study guides (content outlines) (opens in a new tab)
- CSLB: Examination FAQ (opens in a new tab)
- CSLB: List of all fees (opens in a new tab)
- CSLB: Get Licensed to Build (PDF) (opens in a new tab)
Questions last verified October 27, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.