Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Planning and Estimating

What is the minimum height above the drain inlet to which the walls of a shower compartment must be finished with a smooth, nonabsorbent surface under the California Building Code?

Requirements at a glance

AgencyCalifornia Contractors State License Board (CSLB); exams by PSI
Experience4 years of journey-level experience in the trade within the last 10 years
ExamsC-54 Ceramic and Mosaic Tile trade exam, plus the Law and Business exam
FormatClosed book, 4-choice, 3.5 hours per exam; question count and pass score not published
Study referencesANSI A108/A118/A136.1; TCNA Handbook; 2025 California Building and Plumbing Codes
Fees$450 application (one classification); $200 (sole owner) or $350 initial license fee after you pass; $25,000 contractor bond; fingerprints

Qualifiers for a California C-54 Ceramic and Mosaic Tile contractor license. Taken together with the Law and Business exam.

How to get licensed, step by step

  1. Pick your classification

    Find the CSLB classification for your work. The qualifier named on the license needs 4 years of journey-level experience in it within the past 10 years.

    CSLB: Get Licensed to Build (PDF) (opens in a new tab)

  2. Apply to CSLB

    Submit the $450 application with your experience verification. CSLB reviews it and refers you to test.

    California Contractors State License Board (CSLB) (opens in a new tab)CSLB: List of all fees (opens in a new tab)

  3. Schedule Law and Business and the C-54 exam with PSI

    Book both exams with PSI. Pass both within 18 months of acceptance; each exam sitting costs $51.43 paid to PSI. Passing results stay good for 5 years.

    PSI: schedule your CSLB exam (877-392-6422) (opens in a new tab)

  4. Bond, fees and fingerprints

    After you pass, CSLB sends a Bond and Fee letter: file the $25,000 contractor bond, pay the initial license fee and complete fingerprints to receive your license.

How to prepare

  • The CSLB exams are closed book and CSLB doesn't publish question counts or the passing score, so aim for steady scores well above 80% on our practice tests rather than a bare minimum.
  • Use CSLB's free study guide for your classification: it lists the sections, approximate weights and the references the questions come from.
  • Every license needs two exams (Law and Business plus the trade exam). Pass both within 18 months of CSLB accepting your application.
  • Installation and repairs is about 33% of the exam: know thin-set and mortar-bed methods, grout, movement joints and waterproofing.
  • Specialty installations (about 15%) include showers, floors over movement-prone substrates and natural stone.
  • Know silica dust controls when cutting tile and masonry.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • CSLB C-54 Ceramic and Mosaic Tile study guide (applies to exams on or after July 1, 2023)
  • 2025 California Building Code and Plumbing Code
  • ANSI A108, A118 and A136.1 tile standards; TCNA Handbook; NTCA Reference Manual; NSI Dimension Stone Design Manual
  • Cal/OSHA Title 8 safety orders (2023)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Planning and Estimating18
Preparation for Tile and Stone Installation16
Installation and Repairs33
Specialty Installations15
Safety18

Exam day details

  • Administered by PSI Services for the California Contractors State License Board (CSLB).
  • Fee: $450 CSLB application fee (one classification), paid to CSLB. Separately, each exam sitting costs $51.43, paid directly to PSI (a retake costs it again, after a 21-day wait). Cancel or reschedule at least 2 days ahead to keep your fee. The $200 or $350 initial license fee and the $25,000 bond come after you pass.
  • Closed book: no code books, notes or calculators from home. PSI provides a calculator, and every question has four choices with no penalty for guessing.
  • You get 3.5 hours per exam and see your result on screen. A failing report breaks your performance down by section.
  • Every license needs two exams: Law and Business plus the trade exam for the classification (C-61 has no trade exam). You must pass both within 18 months of CSLB accepting your application, and passing results stay good for 5 years.
  • The qualifier needs 4 years of journey-level experience within the last 10 years. Each exam sitting costs $51.43 paid to PSI, and you must cancel or reschedule at least 2 days before the appointment to keep the fee.
  • Work worth $500 or more (labor and materials) requires a California contractor license.

Note: CSLB does not publish the number of questions or the passing score for its exams. The 100-question practice length is ours, and the pass line shown in our practice tests is only a study target. Check CSLB's study guide and the PSI bulletin for current details.

Frequently asked questions

What's on the California C-54 exam?

CSLB lists approximate weights: installation and repairs 33%, planning and estimating 18%, safety 18%, preparation for tile and stone installation 16% and specialty installations 15%.

Which tile standards does the C-54 exam use?

The study guide names the ANSI A108, A118 and A136.1 standards and the TCNA Handbook. The exam is closed book, so learn the methods and materials they describe.

How many questions are on the exam and what score do I need?

CSLB doesn't publish either number, so we don't state them. Each exam is closed book with 4-choice questions and 3.5 hours to finish. Your result appears on screen, and a failing report shows how you did by section.

Free questions with answers

Show all 10 free questions and answers
  1. What is the minimum height above the drain inlet to which the walls of a shower compartment must be finished with a smooth, nonabsorbent surface under the California Building Code?

    Answer: 72 inches above the drain inlet

    CBC 1210.2.4 requires shower compartments (and walls above bathtubs with showerheads) to be finished with a smooth, nonabsorbent surface to a height of not less than 72 inches above the drain inlet. The 48-inch figure belongs to walls near urinals and water closets in 1210.2.2, and the code does not require the full ceiling height.

    Reference: 2025 California Building Code (CBC), 1210.2.4

  2. On a floor plan drawn at 1/4 inch = 1 foot, a rectangular bathroom measures 5 inches by 3.5 inches. What is the floor area to be tiled?

    Answer: 280 sq ft

    At 1/4 inch = 1 foot each drawn inch is 4 ft. 5 in x 4 = 20 ft and 3.5 in x 4 = 14 ft, so the area is 20 x 14 = 280 sq ft. Scaling the drawn area (17.5 sq in) by only 4 gives 70, which forgets that both dimensions are scaled.

    Reference: General trade practice, Concept: reading a scale drawing for area takeoff

  3. A commercial restroom floor is 12 ft by 15 ft and needs a 4-inch tile base on all walls except a 3-ft door and a 6-ft closet opening. Base pieces are 12 inches long and 10 percent is added for waste. How many pieces are ordered?

    Answer: 50 pieces

    Perimeter = 2 x (12 + 15) = 54 ft. Subtract openings 3 + 6 = 9 ft to get 45 ft of base, which is 45 pieces at 12 inches each. Adding 10 percent gives 49.5, rounded up to 50. The 4-inch height ties to CBC 1210.2.1, which requires a base of at least 4 inches in toilet and shower rooms outside dwelling units.

    Reference: 2025 California Building Code (CBC), 1210.2.1

  4. Which backer material is listed in California Residential Code Table R702.4.2 for wall tile in tub and shower areas?

    Answer: Fiber-reinforced gypsum panels meeting ASTM C1278

    CRC Table R702.4.2 lists glass mat gypsum backing panel (ASTM C1178), fiber-reinforced gypsum panels (ASTM C1278), nonasbestos fiber-cement backer board (ASTM C1288 or ISO 8336) and fiber mat-reinforced cementitious backer units (ASTM C1325). Hardboard paneling appears in R702.5 as a wall finish, not as a tile backer.

    Reference: 2025 California Residential Code (CRC), R702.4.2 and Table R702.4.2

  5. Under the California Plumbing Code, how close to the top of a shower dam may fasteners pierce the liner?

    Answer: No closer than 1 inch above the finished dam or threshold

    CPC 408.8 says the lining shall not be nailed or perforated at a point less than 1 inch above the finished dam or threshold. The liner must be recessed and fastened to approved backing so it does not use up the space needed for the wall covering, and an approved subdrain with weep holes must be installed with it.

    Reference: 2025 California Plumbing Code (CPC), 408.8

  6. A tile setter uses a handheld power saw with an integrated water feed to cut tile inside an enclosed bathroom. What respiratory protection does Table 1 of the Cal/OSHA silica standard specify, in addition to the water feed, for both short and long shifts?

    Answer: A respirator with an assigned protection factor of at least 10

    Title 8 section 1532.3 Table 1, item (ii), handheld power saws, requires water delivery to the blade and, when the saw is used indoors or in an enclosed area, a respirator with an assigned protection factor (APF) of 10 for both under and over 4 hours per shift. Outdoors, no respirator is listed for four hours or less.

    Reference: Cal/OSHA Title 8 (Construction Safety Orders), 1532.3(c), Table 1

  7. What is the permissible exposure limit for respirable crystalline silica in construction under Cal/OSHA section 1532.3?

    Answer: 50 micrograms per cubic meter of air as an 8-hour time-weighted average

    Section 1532.3(d)(1) sets the PEL at 50 micrograms per cubic meter (8-hour TWA). The action level, which triggers exposure assessment, is 25 micrograms per cubic meter (8-hour TWA). Mixing the two up is the most common error.

    Reference: Cal/OSHA Title 8 (Construction Safety Orders), 1532.3(d)(1)

  8. A site-built shower receptor has a finished dam. How does the dam height compare with the sides and back of the receptor under the California Plumbing Code?

    Answer: The dam is at least 1 inch lower than the sides and back

    CPC 408.6 says where a shower receptor has a finished dam, curb or threshold, it must be not less than 1 inch lower than the sides and back of the receptor. That way, if the drain clogs, water rises over the dam and spills into the room instead of over the back and side walls.

    Reference: 2025 California Plumbing Code (CPC), 408.6

  9. Under the California Building Code, which ANSI standards govern dry-set portland cement mortar for ceramic tile and its installation?

    Answer: ANSI A118.1 for the mortar, and ANSI A108.5 for installing tile set in it

    CBC 2103.2.3.1 says premixed dry-set portland cement mortars that need only water must comply with ANSI A118.1, and tile set in them is installed per ANSI A108.5. A118.3/A108.6 is epoxy, A136.1/A108.4 is organic adhesive, and A118.6/A108.10 is portland cement grout.

    Reference: 2025 California Building Code (CBC), 2103.2.3.1

  10. A setter mixes latex into dry-set mortar in place of some of the gauging water. Which standard governs that latex-modified portland cement mortar under the CBC?

    Answer: ANSI A118.4, with tile installed under ANSI A108.5

    CBC 2103.2.3.2 says latex-modified portland cement thin-set mortars, where latex replaces all or part of the gauging water in dry-set mortar, must comply with ANSI A118.4, and tile set in them is installed per ANSI A108.5. A118.5 is furan and A118.8 is modified epoxy-emulsion mortar.

    Reference: 2025 California Building Code (CBC), 2103.2.3.2