Requirements at a glance
| Agency | Arkansas Board of Electrical Examiners (Department of Labor and Licensing, Code Enforcement); exams by Prov |
|---|---|
| Experience | 3 years of experience wiring family dwellings up to and including a quadruplex, including 1 year as a licensed residential journeyman, or Board-approved equivalent |
| Exam | Residential master electrician (60 questions, 3 hours, 70% to pass, open book) |
| Books allowed | The 2023 National Electrical Code (an older or newer edition is allowed); the exam's own reference list is in the Prov bulletin |
| Fees | $80 per exam (17 CAR 210-403; $56 for paper/pencil), plus Board application and license fees |
Electricians applying to the Arkansas Board of Electrical Examiners for a residential master license: 3 years of experience wiring family dwellings up to and including a quadruplex, including 1 year as a licensed residential journeyman, or a Board-approved equivalent.
Official links
- Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)
- 17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
- Prov (schedule your exam) (opens in a new tab)
- Prov: Arkansas electrical candidate bulletin (2023.11.10, archived copy) (opens in a new tab)
How to get licensed, step by step
Apply to the Board
Submit your application and experience records to the Board of Electrical Examiners through its online portal. The Board must approve you before you schedule.
Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
Schedule with Prov
After approval, schedule the computer-based exam with Prov and pay the exam fee.
Prov (schedule your exam) (opens in a new tab)Prov: Arkansas electrical candidate bulletin (2023.11.10, archived copy) (opens in a new tab)
Pass the exam
A 70% cut score passes. If you fail, you stay approved and can retest; the bulletin gives a six-month eligibility window and a 1-year retake period, so check the dates with the Board.
Prov: Arkansas electrical candidate bulletin (2023.11.10, archived copy) (opens in a new tab)
Get licensed and renew
Pay the license fee once you pass. Licenses renew with continuing education under 17 CAR 210.
Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
How to prepare
- Prov's bulletin names the 2023 NEC and lets you bring an older or newer edition of an open-book reference. Arkansas amends the NEC for AFCI and GFCI protection and for kitchen island and peninsula receptacles, so learn the Arkansas exceptions in 17 CAR 210-401 for those rules; our questions stick to rules that are the same in every recent NEC edition.
- The exam is open book and timed, with a 70% cut score. Use permanent tabs and pen highlighting only: handwritten notes, loose sticky notes and photocopies are not allowed in a reference book.
- Prov splits this exam by NEC chapter: Chapter 2 (15 questions) and Chapter 3 wiring methods (12) lead, and general theory is 9. Practice dwelling load calculations (Article 220 Part III and Annex D examples).
- Review 17 CAR Part 210 for the electrical law questions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 editionEssential
Prov's bulletin names the 2023 NEC and allows an older or newer edition. The Board adopts the NEC with Arkansas exceptions in 17 CAR 210-401.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC), 2023 edition (older or newer editions are permitted under Prov's open-book rules)
What's on the exam
Official content outline from Prov (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| NEC Chapter 1 | 3 | |
| Safety | 3 | |
| NEC Chapter 2 | 15 | |
| NEC Chapter 3 | 12 | |
| NEC Chapter 4 | 9 | |
| NEC Chapter 5 | 3 | |
| NEC Chapter 6 | 3 | |
| NEC Chapter 7 | 3 | |
| General Theory | 9 |
Exam day details
- Administered by Prov for the Arkansas Board of Electrical Examiners (Department of Labor and Licensing).
- Fee: $80 for the computer-based exam ($56 paper/pencil) per Prov's bulletin and 17 CAR 210-403. Board application and license fees are separate.
- Prov's bulletin: 60 questions in 3 hours, open book, 70% cut score. Our practice exam uses the same counts; Prov arranges this exam by NEC chapter rather than by subject.
- Computer-based exam from Prov (paper/pencil is cheaper). Apply to the Board of Electrical Examiners first; once it approves you, you schedule with Prov.
- All Prov electrical exams are open book and timed, with a 70% cut score. Books may carry permanent tabs and pen highlighting; handwritten notes and loose sticky notes are not allowed.
- If you fail, you stay approved and can retake the exam. The bulletin gives both a six-month eligibility window after approval and a 1-year retake period, so confirm the dates with the Board.
- Arkansas no longer issues an air-conditioning electrician license (repealed by Act 746 of 2025).
Note: Format, subject areas and the 2023 NEC come from Prov's electrical bulletin dated November 10, 2023, which may have been revised since. Prov lets you bring an older or newer NEC edition, but Arkansas amends the NEC for AFCI, GFCI and kitchen island receptacles, so confirm the edition and amendments with the Board and Prov.
Frequently asked questions
How much experience does a residential master electrician need?
3 years of experience wiring family dwellings up to and including a quadruplex, including 1 year as a licensed residential journeyman, or a combination the Board approves (17 CAR 210).
What's on the exam?
Nine areas: NEC Chapter 2 wiring and protection (15 questions), Chapter 3 wiring methods (12), Chapter 4 equipment for general use (9), general theory (9), Chapter 1 (3), safety (3) and Chapters 5, 6 and 7 (3 each).
Which NEC edition does the exam use?
Prov's bulletin says the 2023 NEC, and Prov permits older or newer editions of an open-book reference. Check Arkansas's NEC exceptions with the Board.
Free questions with answers
Show all 10 free questions and answers
A multiwire branch circuit, as the NEC defines it, consists of which conductors?
Answer: Two or more ungrounded conductors with a voltage between them and a grounded conductor equal in voltage to each
The Article 100 definition of a multiwire branch circuit requires at least two ungrounded conductors with a stated voltage between them and a grounded (neutral) conductor having equal voltage to each. A common example is a 3-wire 120/240-volt circuit feeding two 120-volt loads. Section 210.4 then governs how it is run and disconnected.
Reference: National Electrical Code (NFPA 70), Article 100, Branch Circuit, Multiwire
What is the maximum overcurrent device rating that may protect 10 AWG copper conductors in a dwelling branch circuit under the small-conductor rule?
Answer: 30 amperes
Section 240.4(D) limits 14 AWG copper to 15 amperes, 12 AWG copper to 20 amperes and 10 AWG copper to 30 amperes, after any correction or adjustment factors are applied. The higher 90 degree C table value cannot be used to raise the overcurrent device above those limits.
Reference: National Electrical Code (NFPA 70), 240.4(D)
A feeder to a dwelling subpanel has an allowable ampacity of 55 amperes. The conductors do not supply receptacle loads on cord-and-plug connected equipment. What is the largest standard overcurrent device the next-size-up rule allows?
Answer: 60 amperes
Section 240.4(B) allows the next higher standard overcurrent rating when the ampacity does not match a standard rating, the conductors are not supplying multiple receptacles for cord-and-plug loads, and the next size up does not exceed 800 amperes. The standard sizes in 240.6(A) include 50, 60 and 70, but 55 is not a standard size, so 60 is the largest allowed.
Reference: National Electrical Code (NFPA 70), 240.4(B) and 240.6(A)
What is the minimum bending radius for Type NM cable, measured to the inside of the bend?
Answer: Five times the diameter of the cable
Section 334.24 requires bends in NM cable to be made so the cable is not damaged, with a radius of the curve of the inner edge not less than five times the diameter of the cable. Two times is too tight and would damage the insulation, and ten or twelve times is not required.
Reference: National Electrical Code (NFPA 70), 334.24
A cord-and-plug connected garbage disposer is installed under a dwelling sink. What length of cord is permitted?
Answer: 18 inches minimum, 36 inches maximum
Section 422.16(B)(1) permits a garbage disposer to be cord-and-plug connected with a cord not less than 18 inches and not over 36 inches long, with a grounding-type attachment plug. The 3-to-4-foot range applies to built-in trash compactors, not to disposers.
Reference: National Electrical Code (NFPA 70), 422.16(B)(1)
A residential pool's equipotential bonding grid ties together the reinforcing steel, metal fittings and perimeter surfaces. What is the minimum size and type of the bonding conductor?
Answer: 8 AWG solid copper
Section 680.26(B) bonds pool structure and equipment with solid copper conductors not smaller than 8 AWG (or rigid metal conduit of brass or other identified corrosion-resistant metal). Aluminum and smaller conductors do not qualify for this equipotential bonding.
Reference: National Electrical Code (NFPA 70), 680.26(B)
A homeowner buys a permanently installed standby generator to power the dwelling during outages. What must the installation include?
Answer: Transfer equipment that blocks utility-generator paralleling
Section 702.5 requires transfer equipment, such as an automatic or manual transfer switch, for optional standby systems to prevent inadvertent interconnection of normal and alternate sources. Back-feeding through a dryer outlet or closing a breaker on both sources can energize utility lines and injure line workers.
Reference: National Electrical Code (NFPA 70), 702.5
A dwelling's 120/240-volt panelboard is on a basement wall with no grounded or live parts opposite it. What is the minimum depth of clear working space in front of the panel?
Answer: 3 feet
Table 110.26(A)(1) requires 3 feet (900 mm) of working space depth for equipment at 0 to 150 volts to ground under all three conditions. 3 feet 6 inches applies to 151 to 600 volts with grounded parts opposite, and 4 feet to condition 3 at the higher voltages.
Reference: National Electrical Code (NFPA 70), 2023 edition, Table 110.26(A)(1)
General-illumination lamps are strung on a temporary construction circuit where workers could bump them. Which approach complies with 590.4?
Answer: Lamps protected by a suitable luminaire or a lampholder with a guard, with any metal guard grounded
590.4(F) requires lamps for general illumination to be protected from accidental contact or breakage by a suitable luminaire or lampholder with a guard, and metal guarded sockets may not be used unless the guard is connected to the circuit equipment grounding conductor. Wattage and tape are not substitutes.
Reference: National Electrical Code (NFPA 70), 2023 edition, 590.4(F)
A 240-volt single-phase load draws 40 amperes through 100 feet one way of 8 AWG copper. Use 0.778 ohm per 1,000 feet for the conductor. What is the approximate voltage drop and its percentage of 240 volts?
Answer: 6.2 volts, 2.6 percent
The circuit length is 2 x 100 = 200 feet. Resistance = 0.778 x 200 / 1,000 = 0.1556 ohm. Drop = 40 x 0.1556 = 6.22 volts. Percent = 6.22 / 240 x 100 = 2.6 percent. Using only the one-way length gives half the drop (3.1 volts), and 12.4 volts doubles it again.
Reference: National Electrical Code (NFPA 70), 2023 edition, Chapter 9 Table 8 conductor resistance with Ohm's law
Sources
- Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)
- 17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
- Prov: Arkansas electrical candidate information bulletin (2023.11.10, archived copy) (opens in a new tab)
Questions last verified November 13, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.