Requirements at a glance
| Agency | Arkansas Board of Electrical Examiners (Department of Labor and Licensing, Code Enforcement); exams by Prov |
|---|---|
| Experience | An electrical engineering degree plus 2 years of construction experience, or 6 years in construction including 2 as a licensed journeyman, or Board-approved equivalent |
| Exam | Master electrician (60 questions, 3 hours, 70% to pass, open book) |
| Books allowed | The 2023 National Electrical Code (an older or newer edition is allowed); the exam's own reference list is in the Prov bulletin |
| Fees | $80 per exam (17 CAR 210-403; $56 for paper/pencil), plus Board application and license fees |
Electricians applying to the Arkansas Board of Electrical Examiners for a master license: an electrical engineering degree plus 2 years of construction experience, or 6 years in construction including 2 years as a licensed journeyman, or Board-approved equivalent training.
Official links
- Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)
- 17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
- Prov (schedule your exam) (opens in a new tab)
- Prov: Arkansas electrical candidate bulletin (2023.11.10, archived copy) (opens in a new tab)
How to get licensed, step by step
Apply to the Board
Submit your application and experience records to the Board of Electrical Examiners through its online portal. The Board must approve you before you schedule.
Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
Schedule with Prov
After approval, schedule the computer-based exam with Prov and pay the exam fee.
Prov (schedule your exam) (opens in a new tab)Prov: Arkansas electrical candidate bulletin (2023.11.10, archived copy) (opens in a new tab)
Pass the exam
A 70% cut score passes. If you fail, you stay approved and can retest; the bulletin gives a six-month eligibility window and a 1-year retake period, so check the dates with the Board.
Prov: Arkansas electrical candidate bulletin (2023.11.10, archived copy) (opens in a new tab)
Get licensed and renew
Pay the license fee once you pass. Licenses renew with continuing education under 17 CAR 210.
Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
How to prepare
- Prov's bulletin names the 2023 NEC and lets you bring an older or newer edition of an open-book reference. Arkansas amends the NEC for AFCI and GFCI protection and for kitchen island and peninsula receptacles, so learn the Arkansas exceptions in 17 CAR 210-401 for those rules; our questions stick to rules that are the same in every recent NEC edition.
- The exam is open book and timed, with a 70% cut score. Use permanent tabs and pen highlighting only: handwritten notes, loose sticky notes and photocopies are not allowed in a reference book.
- Grounding and bonding and service, feeders and overcurrent protection are the two biggest areas (10 questions each): tab Articles 250, 230, 240 and 220 and practice load calculations.
- Review 17 CAR Part 210 for the electrical law questions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NEC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NFPA 70: National Electrical Code (NEC), 2023 editionEssential
Prov's bulletin names the 2023 NEC and allows an older or newer edition. The Board adopts the NEC with Arkansas exceptions in 17 CAR 210-401.
Official reference list (as published by the testing agency)
- NFPA 70: National Electrical Code (NEC), 2023 edition (older or newer editions are permitted under Prov's open-book rules)
What's on the exam
Official content outline from Prov (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Grounding and Bonding | 10 | |
| General Knowledge of the Electrical Trade and Calculations | 5 | |
| Service, Feeders, Branch Feeders and Overcurrent Protection | 10 | |
| Raceways and Enclosures | 6 | |
| Conductors | 6 | |
| Motors and Controls | 6 | |
| Utilization and General Use Equipment | 7 | |
| Special Occupancies and Equipment | 5 | |
| Low Voltage Circuits, Including Alarms and Communications | 2 | |
| Safety | 3 |
Exam day details
- Administered by Prov for the Arkansas Board of Electrical Examiners (Department of Labor and Licensing).
- Fee: $80 for the computer-based exam ($56 paper/pencil) per Prov's bulletin and 17 CAR 210-403. Board application and license fees are separate.
- Prov's bulletin: 60 questions in 3 hours, open book, 70% cut score. Our practice exam uses the same counts and the same ten subject areas.
- Computer-based exam from Prov (paper/pencil is cheaper). Apply to the Board of Electrical Examiners first; once it approves you, you schedule with Prov.
- All Prov electrical exams are open book and timed, with a 70% cut score. Books may carry permanent tabs and pen highlighting; handwritten notes and loose sticky notes are not allowed.
- If you fail, you stay approved and can retake the exam. The bulletin gives both a six-month eligibility window after approval and a 1-year retake period, so confirm the dates with the Board.
- Arkansas no longer issues an air-conditioning electrician license (repealed by Act 746 of 2025).
Note: Format, subject areas and the 2023 NEC come from Prov's electrical bulletin dated November 10, 2023, which may have been revised since. Prov lets you bring an older or newer NEC edition, but Arkansas amends the NEC for AFCI, GFCI and kitchen island receptacles, so confirm the edition and amendments with the Board and Prov.
Frequently asked questions
What's on the Arkansas master electrician exam?
Ten subject areas with these question counts: grounding and bonding (10), service, feeders, branch feeders and overcurrent protection (10), utilization and general use equipment (7), raceways and enclosures (6), conductors (6), motors and controls (6), general knowledge of the electrical trade and calculations (5), special occupancies and equipment (5), safety (3) and low voltage circuits including alarms and communications (2).
How much experience does an Arkansas master electrician need?
An electrical engineering degree plus 2 years of construction experience, or 6 years of construction experience including 2 years as a licensed journeyman, or another combination the Board approves (17 CAR 210).
Which NEC edition does the Arkansas exam use?
Prov's bulletin says the 2023 NEC, and Prov permits older or newer editions of an open-book reference. Check Arkansas's NEC exceptions with the Board.
Free questions with answers
Show all 10 free questions and answers
A 480Y/277-volt panelboard has exposed live parts on one side of the working space and a grounded concrete wall on the other side. Using the working-space table, what minimum clear depth is required?
Answer: 3.5 ft
For 151 to 600 volts to ground, Table 110.26(A)(1) gives 3 ft (Condition 1: live parts on one side, nothing grounded opposite), 3.5 ft (Condition 2: live parts on one side, grounded parts on the other, and concrete walls count as grounded), and 4 ft (Condition 3: live parts on both sides). This is Condition 2, so 3.5 ft.
Reference: National Electrical Code (NFPA 70), 110.26(A)(1), Table 110.26(A)(1)
A feeder with #6 THHN copper conductors (90 degree C insulation) terminates on a 60-amp breaker whose terminals have no temperature marking. What is the most current the conductors may be loaded to, before any other derating?
Answer: 55 amps, from the 60 degree C column
For circuits rated 100 amps or less, unmarked terminations are treated as 60 degree C, so the conductor ampacity used is from the 60 degree C column of Table 310.16: 55 amps for #6 copper. The 75 amp figure is the 90 degree C value, usable only for derating calculations, not for the termination.
Reference: National Electrical Code (NFPA 70), 110.14(C)(1)(a), Table 310.16
In the NEC definitions, which condition must be true for equipment to be called readily accessible?
Answer: It can be reached quickly without climbing over obstacles, removing them, or using portable ladders
Article 100 defines readily accessible as capable of being reached quickly for operation, renewal or inspection without having to climb over or remove obstacles or resort to portable ladders. Service disconnects and many other devices must be readily accessible; that is different from merely accessible.
Reference: National Electrical Code (NFPA 70), Article 100, Definitions (Readily Accessible)
What is the minimum rating of the service disconnecting means for a one-family dwelling?
Answer: 100 amperes
Section 230.79 requires a service disconnect of at least 100 amperes, 3-wire, for a one-family dwelling. 60 amperes is the minimum for other occupancies with more than two circuits, and 200 amperes is not required by code.
Reference: National Electrical Code (NFPA 70), 230.79
An outlet box contains two 12/2 NM cables with ground (four #12 circuit conductors and two #12 grounds), one single-pole switch, and internal cable clamps. Each #12 conductor counts 2.25 cubic inches. What is the minimum box volume?
Answer: 18.00 cubic inches
Conductors: 4 x 2.25 = 9.00. Equipment grounding conductors: all count as one 2.25 allowance = 2.25. Internal clamps: one allowance = 2.25. Device (one yoke): 2 x 2.25 = 4.50. Total = 9.00 + 2.25 + 2.25 + 4.50 = 18.00 cubic inches. 15.75 leaves out the clamps, and 20.25 counts the two grounds separately.
Reference: National Electrical Code (NFPA 70), 314.16(B)
A 20-ampere ac general-use snap switch will control a 120-volt motor. What is the largest motor load, in amperes, that the switch may control?
Answer: 16 amperes
An ac general-use snap switch may control a motor load that does not exceed 80 percent of the switch's ampere rating at its rated voltage: 20 x 0.80 = 16 amperes.
Reference: National Electrical Code (NFPA 70), 404.14
A 250 kcmil copper service has a grounding electrode conductor that runs only to two ground rods. What is the largest size of copper grounding electrode conductor the code requires for this connection?
Answer: #6 AWG
Where a grounding electrode conductor goes to rod, pipe or plate electrodes, it is not required to be larger than #6 copper (or #4 for a concrete-encased electrode). The Table 250.66 size of #2 is not needed for that connection.
Reference: National Electrical Code (NFPA 70), 250.66(A)
An insulated service drop cable, 750 volts or less to ground, supported on and cabled with a solidly grounded bare messenger, is run over a swimming pool. What minimum clearance in any direction is required from the water level?
Answer: 22.5 feet
The pool clearance table gives 22.5 feet in any direction from the water level, edge of water surface, or base of a diving platform or permanently anchored raft for insulated cables of 0 to 750 volts to ground supported on and cabled with a solidly grounded bare messenger or solidly grounded neutral. Other conductors up to 15 kV need 25 feet, and 18 feet is a public-street service clearance, not a pool clearance.
Reference: National Electrical Code (NFPA 70), Overhead conductor clearances over pools, Table 680.9(A) (Table 680.8(A) in NEC 2017)
Which current value is used to size the branch-circuit conductors for a motor, the nameplate current or the table full-load current?
Answer: The table full-load current from the Article 430 tables
For conductor sizing and short-circuit protection the code uses the table full-load currents (Tables 430.247 to 430.250), not the nameplate. The nameplate current is used for overload protection sizing.
Reference: National Electrical Code (NFPA 70), 430.6(A)
What is the smallest bonding conductor or grounding electrode conductor allowed for the primary protector of a communications cable entering a building?
Answer: 14 AWG
Section 800.100(A)(3) says the bonding or grounding electrode conductor for communications cables must not be smaller than 14 AWG, with current-carrying capacity at least equal to the cable sheath and conductors, and is not required to exceed 6 AWG. Smaller conductors such as 18 AWG are used for signaling, not for protector bonding.
Reference: National Electrical Code (NFPA 70), 800.100(A)(3)
Sources
- Arkansas Department of Labor and Licensing: Electrical licensing (opens in a new tab)
- 17 CAR Part 210: Board of Electrical Examiners rules (PDF) (opens in a new tab)
- Prov: Arkansas electrical candidate information bulletin (2023.11.10, archived copy) (opens in a new tab)
Questions last verified November 13, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.