Requirements at a glance
| Who takes it | The qualifying party on every new Arizona contractor license |
|---|---|
| Format | Online training course + final exam (GMetrix), 70% to pass |
| Covers | ARS Title 32 Chapter 10 and the ROC rules (AAC R4-9) |
| Fee | $61, one exam attempt per purchase |
Every qualifying party on a new Arizona contractor license, in every classification, unless they were the qualifying party on another Arizona license in the last five years.
Official links
How to get licensed, step by step
Buy the course
Purchase the AZ Statutes and Rules Training Course and Exam from GMetrix. The name on the account must match the qualifying party.
Buy the Statutes and Rules Exam (GMetrix) (opens in a new tab)
Work through the training
The course walks through Arizona contractor law and the ROC rules. Keep the statutes and rules open as you go: knowing where things are is most of the exam.
Arizona Revised Statutes Title 32, Chapter 10 (opens in a new tab)ROC rules, AAC Title 4 Chapter 9 (PDF) (opens in a new tab)
Take the final exam
One attempt per purchase, 70% to pass. If you fail you buy the course again, so practice first.
Add your trade exam and apply
Most classifications also need a PSI trade exam. Then apply to the ROC within two years of passing.
Schedule with PSI (Arizona contractors) (opens in a new tab)Arizona ROC: Applying for a license (opens in a new tab)
How to prepare
- Know the numbers: bond amounts by classification, Recovery Fund limits, complaint and response deadlines, and the dollar limit for the handyman exemption.
- The workmanship standards rule (R4-9-108) and the grounds for discipline (ARS 32-1154) are where most complaint questions come from.
- You get one attempt per purchase, so take our timed practice exams until you're scoring well above 70%.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from ARS 32-10 and the ROC rules. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Arizona contractor law: ARS Title 32 Chapter 10 and the ROC rules (AAC R4-9)Essential
Everything on the SRE comes from these two documents.
Arizona Revised Statutes Title 32, Chapter 10 (opens in a new tab)
ROC rules, AAC Title 4 Chapter 9
Includes the workmanship standards (R4-9-108) and bond amounts.
Official reference list (as published by the testing agency)
- Arizona Revised Statutes Title 32, Chapter 10 (Contractors), §32-1101 and following
- Arizona Administrative Code Title 4, Chapter 9 (Registrar of Contractors rules), including R4-9-108 Workmanship Standards
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Licensing and Classifications | 15 | |
| Qualifying Party and License Maintenance | 15 | |
| Bonds and the Recovery Fund | 15 | |
| Contracts and Consumer Protection | 15 | |
| Complaints, Discipline and Workmanship Standards | 20 | |
| Unlicensed Contracting and Penalties | 10 | |
| Prompt Payment and Business Records | 10 |
Exam day details
- Administered by Arizona Registrar of Contractors (ROC), online through GMetrix.
- Fee: $61, bought online through the ROC's GMetrix course page. One exam attempt per purchase.
- The SRE is an online training course followed by a final exam, taken at home through GMetrix.
- 70% to pass. You get one attempt at the final exam per purchase; if you fail, you buy the course again.
- The ROC doesn't publish the number of questions or a time limit. Our practice exams are 50 questions in 90 minutes, built from the statutes and rules the course covers.
- It's required for every license classification and can't be replaced by a trade exam waiver.
Note: The ROC doesn't publish the SRE's number of questions, time limit or topic weights. Our topics and weights are estimates based on the statutes and rules the course covers.
Frequently asked questions
Who has to take the Arizona Statutes and Rules Exam?
The qualifying party for any new Arizona ROC contractor license. You're exempt only if you were the qualifying party on another Arizona contractor license within the last five years.
What's on the Arizona SRE?
Arizona contractor law: license classifications and who needs a license, the qualifying party's duties, license bonds and the Residential Contractors' Recovery Fund, contract and disclosure requirements, complaints, discipline and the ROC's workmanship standards, unlicensed contracting penalties, and prompt payment.
Is the SRE open book?
It's taken online at the end of the ROC's training course, so you can refer to the statutes and rules. Knowing where things are matters more than memorizing them.
Free questions with answers
Show all 10 free questions and answers
Under the ROC's residential classification rule, which work is a B General Residential Contractor required to subcontract to an appropriately licensed contractor?
Answer: Electrical and plumbing work
R4-9-103(B) lets a B General Residential Contractor build and repair all or part of a residential structure or appurtenance. Work related to electrical, plumbing, air conditioning systems, boilers, swimming pools, spas and water wells must be subcontracted to an appropriately licensed contractor. Framing, drywall and foundations are ordinary building work inside the B scope, so the B contractor may do them with its own crews.
Reference: Arizona Administrative Code, R4-9-103(B)
A B-2 General Small Commercial Contractor is bidding a new commercial building. Under R4-9-102, what is the largest project, including labor and materials, the B-2 scope allows?
Answer: $2,000,000
R4-9-102(B) limits the B-2 General Small Commercial Contractor to projects of $2,000,000 or less, including labor and materials. Larger commercial projects need a B-1 General Commercial Contractor license. The $5,000,000 and $1,000,000 figures appear in the bond-amount table in R4-9-112, not in the B-2 scope.
Reference: Arizona Administrative Code, R4-9-102(B)
Before a license is issued, how many years of practical or management trade experience must the qualifying party normally have?
Answer: Four years
ARS 32-1122(E)(1) requires a minimum of four years' practical or management trade experience in the type of construction applied for, with at least two of those years within the last ten years. Accredited technical training may count, but never for more than two of the four years. Two years is the cap on training credit and the recent-experience minimum, not the total.
Reference: Arizona Revised Statutes, §32-1122(E)(1)
Under the bond table in R4-9-112, what license bond is required for a general residential contractor that estimates less than $750,000 in annual Arizona volume?
Answer: $9,000
The R4-9-112(A) table sets the general residential contracting bond at $9,000 for estimated annual volume under $750,000 and $15,000 for $750,000 or more. $4,250 is the specialty residential bond for volume under $375,000. $5,000 is the statutory minimum in ARS 32-1152(B)(5) and the general commercial bond for volume under $150,000.
Reference: Arizona Administrative Code, R4-9-112(A)
ARS 32-1158 lists items that must be written into a contract between a contractor and a property owner. Above what contract amount does this requirement apply?
Answer: $1,000
ARS 32-1158(A) applies to any contract of more than $1,000 between a contractor and the owner of the property to be improved. The contract must include items such as the contractor's name, address and license number, the date the contract was entered into, the estimated completion date, description of work, total price and payment terms. The same $1,000 figure appears in the handyman exemption of 32-1121(A)(14).
Reference: Arizona Revised Statutes, §32-1158(A)
Under R4-9-108(B), work meets professional industry standards when the finished work meets the standards of which comparison group?
Answer: A similarly licensed contractor of ordinary skill
R4-9-108(B) requires all work to follow applicable building codes and professional industry standards. To meet those standards, the contractor must use the skill, prudence and diligence needed for the finished work to match a similarly licensed contractor with ordinary skill and capacity. The test is an ordinary contractor in the same trade, not the best one or an inspector.
Reference: Arizona Administrative Code, R4-9-108(B)
Under the Arizona prompt pay statute, an owner receives a contractor's progress billing and does nothing. Unless the contract and plans set a different period, when is the billing deemed certified and approved?
Answer: 14 days after the owner receives it
ARS 32-1182(D) says a progress billing is deemed certified and approved fourteen days after the owner receives it, unless the owner first issues a written statement giving reasonable detail of its reasons for not approving all or part of it. After approval, 32-1182(A) gives the owner seven days to pay. Thirty days is the default billing cycle, not the approval period.
Reference: Arizona Revised Statutes, §32-1182(D)
A handyman who is not licensed takes on minor jobs. Under the ARS 32-1121(A)(14) exemption, what is the aggregate contract price limit for one project, and which condition must hold?
Answer: Less than $1,000, and no building permit is needed
ARS 32-1121(A)(14) exempts work of a casual or minor nature on one project when the aggregate price for labor, materials and everything else is less than $1,000. The exemption does not apply if the work requires a local building permit, if the job is part of a larger operation or is split into smaller contracts to evade the law, or if the person advertises without the words "not a licensed contractor."
Reference: Arizona Revised Statutes, §32-1121(A)(14)
An unlicensed person bids $15,000 on a remodel, and the registrar has never warned this person before. Under ARS 32-1123, what must the registrar do?
Answer: Issue a written warning about unlicensed activity
ARS 32-1123(A) bars the registrar from licensing an unlicensed entity for one year after it bids on a project worth more than $1,000. Subsection (D) carves out an exception: if the project is worth more than $1,000 but less than $20,000 and the entity has never been warned, the registrar must instead issue a written warning. A $15,000 bid with no prior warning falls in that exception.
Reference: Arizona Revised Statutes, §32-1123(D)
Under R4-9-108(C), how must work be performed in a town that has not adopted building codes?
Answer: According to professional industry standards
R4-9-108(C) says that where a county, city or town has not adopted building codes, or where adopted codes have no specific provision for that part of the work, the work must be performed in accordance with professional industry standards. R4-9-108(A) separately requires all work to be done in a professional and workmanlike manner.
Reference: Arizona Administrative Code, R4-9-108(C)
Sources
- Arizona ROC: Applying for a license (opens in a new tab)
- GMetrix: AZ Statutes and Rules Training Course and Exam (opens in a new tab)
- Arizona Revised Statutes §32-1101 (start of Chapter 10) (opens in a new tab)
- PSI: Arizona ROC Candidate Information Bulletin (Feb 2026) (opens in a new tab)
Questions last verified October 19, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.