Arizona licensing exam

Arizona B-1 General Commercial Contractor Exam: Practice Test & Licensing Guide

The PSI trade exam for Arizona's B-1, B-2, KB-1 and KB-2 licenses: 100 questions on commercial construction, safety and the 2018 IBC, open book.

Questions
100
Time limit
4 hours
Passing score
70%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Concrete

Lifting inserts are cast into tilt-up concrete wall panels. Under OSHA, the inserts must be able to support at least how many times the maximum intended load applied to them?

Requirements at a glance

AgencyArizona Registrar of Contractors (ROC); trade exam by PSI
Exams100 questions, 240 minutes, 70%, plus the online Statutes and Rules Exam (SRE)
Books allowed2018 IBC, 2018 IRC and 29 CFR 1926
Fees$66 PSI trade exam + $61 SRE, plus ROC license fees and bond

Qualifying parties for an Arizona B-1 General Commercial, B-2 General Small Commercial, KB-1 Dual Building or KB-2 Dual Residential and Small Commercial license.

How to get licensed, step by step

  1. Pick your classification and qualifying party

    Find your classification on the ROC's list. The qualifying party (an owner or regular employee of the business) must have the required trade experience and takes the exams for the business.

    Arizona ROC: License classifications (opens in a new tab)

  2. Pass the Statutes and Rules Exam (SRE)

    Buy the ROC's online SRE course and exam through GMetrix ($61), work through the course, then take the final exam. 70% to pass, one attempt per purchase.

    Buy the Statutes and Rules Exam (GMetrix) (opens in a new tab)

  3. Schedule the B-1 trade exam with PSI

    Book online with PSI ($66, or $116 for two exams). Bring the allowed references, bound and tabbed. If you fail, wait 30 days to retake.

    Schedule with PSI (Arizona contractors) (opens in a new tab)PSI content outline: B-1, B-2, KB-1 and KB-2 (opens in a new tab)

  4. Apply to the ROC

    Submit your application with your passing score reports within two years of passing, plus the license bond, fees and business documents the ROC asks for.

    Arizona ROC: Applying for a license (opens in a new tab)

How to prepare

  • Bring the exact code editions on PSI's list. Arizona's trade exams use older editions (2017 NEC, 2018 I-codes); a newer book gives some wrong answers.
  • Bind or spiral any printed references, and tab them with permanent tabs before exam day. Sticky notes are removed at check-in.
  • Practice finding answers fast. On a 100-question, 4-hour exam you have 2.4 minutes per question, and some of that goes to unscored items.
  • Safety is 12 questions: know 1926 Subparts M (fall protection), P (excavations), Q (concrete and masonry), R (steel erection) and L (scaffolds).
  • Tab IBC chapters 5 (heights and areas), 6 (construction types), 10 (egress), 17 (special inspections) and 19–25 (materials).
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IBC and the 2018 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Building Code (IBC), 2018 (allowed in the exam room)
  • International Residential Code (IRC), 2018 (allowed in the exam room)
  • 29 CFR Part 1926, OSHA Construction (allowed in the exam room)
  • Design and Control of Concrete Mixtures, PCA (not allowed in the room)
  • Handling and Erection of Steel Joists and Joist Girders, SJI (not allowed in the room)
  • Modern Masonry; Carpentry and Building Construction; Pipe and Excavation Contracting (not allowed in the room)

What's on the exam

Official content outline from PSI Services (number of questions per topic):

TopicQuestions
Sitework9
Concrete14
Masonry10
Metals13
Carpentry12
Thermal and Moisture Protection10
Doors and Windows5
Finishes6
Safety12
General Building Code9

Exam day details

  • Administered by PSI Services for the Arizona Registrar of Contractors (ROC).
  • Fee: $66 to PSI ($116 for two exams taken together). The ROC license application fee is separate.
  • 100 scored questions in 240 minutes, 70% to pass.
  • B-1 and B-2 applicants can take the NASCLA Accredited Commercial General Building Contractor exam instead of this one.
  • Open book: bring your own bound copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them during the exam.
  • PSI adds 5 to 10 unscored trial questions, which count against your time.
  • If you fail, wait 30 days to retake; after a third failure the wait is 90 days. Submit your ROC application within two years of passing.
  • You also need Arizona's Statutes and Rules Exam (SRE), taken online through the ROC. The ROC can waive the trade exam if you were the qualifying party on a license in the same classification in the last five years.

Frequently asked questions

What's on the Arizona B-1 exam?

100 questions: concrete 14, metals 13, carpentry 12, safety 12, masonry 10, thermal and moisture protection 10, sitework 9, general building code 9, finishes 6 and doors and windows 5.

Is the B-2 exam different from the B-1 exam?

No. B-1, B-2, KB-1 and KB-2 share one PSI trade exam; passing it qualifies you for any of them.

Should I take the NASCLA exam or the Arizona B-1 exam?

Either is accepted for B-1 and B-2. The NASCLA exam is also accepted in other states, but it's longer and uses a different reference list. If you only need Arizona, most people take the ROC exam.

Free questions with answers

Show all 10 free questions and answers
  1. Lifting inserts are cast into tilt-up concrete wall panels. Under OSHA, the inserts must be able to support at least how many times the maximum intended load applied to them?

    Answer: Two times

    29 CFR 1926.704(b) requires lifting inserts in tilt-up precast members to support at least two times the maximum intended load. Inserts in other precast members need four times (1926.704(c)), and the lifting hardware itself needs five times (1926.704(d)). Those other factors are the usual wrong picks.

    Reference: 29 CFR Part 1926, Subpart Q, 1926.704(b)

  2. A crew will lay up a 12-ft-high CMU wall, scaffolded on one side only. Under OSHA, how wide must the limited access zone be on the unscaffolded side?

    Answer: 16 ft

    29 CFR 1926.706(a)(2) makes the limited access zone equal to the wall height plus 4 feet, running the full length of the wall: 12 + 4 = 16 ft. 1926.706(a)(3) puts the zone on the side that is not scaffolded. 12 ft forgets the extra 4 ft. 20 ft adds 8 ft, mixing in the 8-ft bracing trigger from 1926.706(b).

    Reference: 29 CFR Part 1926, Subpart Q, 1926.706(a)(2)

  3. Under IBC Table 1705.3, what level of special inspection is required for fabricating strength-test specimens and performing slump, air content and temperature tests of fresh concrete before placement?

    Answer: Continuous special inspection

    Item 6 of IBC Table 1705.3 lists fabricating strength-test specimens and doing slump, air content and temperature tests before placement as continuous special inspection, referencing ASTM C172 and C31. Verifying the design mix (Item 5) and inspecting reinforcement placement (Item 1) are periodic, which is why periodic is the tempting wrong choice.

    Reference: 2018 International Building Code, Table 1705.3, Item 6

  4. Under the 2018 IBC, finish grade next to a new building's foundation must slope away at not less than 5 percent for a minimum of 10 feet. What minimum fall does that give over the 10 feet?

    Answer: 6 inches

    IBC Section 1804.4 requires the ground to slope away at 1 unit vertical in 20 horizontal (5 percent) for at least 10 feet measured perpendicular to the wall. 10 ft x 0.05 = 0.5 ft = 6 inches. 2-1/2 inches is about the 2 percent fall (1 in 48) allowed under the exception where climate or soil conditions warrant, or for swales.

    Reference: 2018 International Building Code, Section 1804.4

  5. An Arizona excavation is cut through undisturbed, unfissured caliche with no vibration or water seepage. How does OSHA's soil classification system classify cemented soils like caliche?

    Answer: Type A

    Appendix A to Subpart P, paragraph (b), says cemented soils such as caliche and hardpan are considered Type A. A soil cannot be Type A if it is fissured, subject to vibration, previously disturbed, or otherwise less stable. Stable rock is natural solid mineral matter that can be excavated with vertical sides and stay intact while exposed, and caliche is not classified that way.

    Reference: 29 CFR Part 1926, Subpart P, Appendix A, paragraph (b), definition of Type A

  6. An ironworker's personal fall arrest system ties off to an anchorage that is not designed by a qualified person. How much must that anchorage support per attached employee, and how far may the worker free fall?

    Answer: 5,000 pounds; 6 feet

    29 CFR 1926.502(d)(15) requires PFAS anchorages to support at least 5,000 pounds per employee attached, unless designed as part of a complete system with a safety factor of at least two under a qualified person's supervision. 1926.502(d)(16)(iii) requires the system to be rigged so the worker cannot free fall more than 6 feet or contact any lower level. 1,800 pounds is the maximum arresting force on a body harness, not an anchorage strength.

    Reference: 29 CFR Part 1926, Subpart M, 1926.502(d)(15) and (d)(16)(iii)

  7. A frame scaffold 5 ft wide (base width, no outriggers) will be built 60 ft tall. If the manufacturer gives no other instructions, where does OSHA require the first tie, and how often must ties be repeated vertically above it?

    Answer: At the horizontal member closest to 20 ft, then every 26 ft or less

    29 CFR 1926.451(c)(1) requires restraint when the height-to-base-width ratio exceeds 4:1. For a 5-ft base, the 4:1 height is 4 x 5 = 20 ft. Under 1926.451(c)(1)(ii), the first guy, tie or brace goes at the horizontal member closest to the 4:1 height. Ties then repeat at least every 26 ft for scaffolds wider than 3 ft, or every 20 ft for scaffolds 3 ft wide or less. This scaffold is 5 ft wide, so 26 ft applies.

    Reference: 29 CFR Part 1926, Subpart L, 1926.451(c)(1)(ii)

  8. Before steel erection begins, the steel erector must receive written notice that concrete in the footings, piers and walls has reached what strength, based on an ASTM test of field-cured samples?

    Answer: 75 percent of the intended minimum compressive design strength, or enough strength to support erection loads

    29 CFR 1926.752(a)(1) and (b) require the controlling contractor to give the steel erector written notice that the concrete in footings, piers and walls (and mortar in masonry piers and walls) has reached either 75 percent of the intended minimum compressive design strength or enough strength to support erection loads. The strength must be shown by an appropriate ASTM test of field-cured samples. Waiting for full 28-day strength is not required.

    Reference: 29 CFR Part 1926, Subpart R, 1926.752(a)(1) and (b)

  9. A single 40-ft-long sill plate on a concrete foundation is anchored with 1/2-inch bolts under the 2018 IBC conventional framing rules (not a braced wall line over two stories). The end bolts are placed 12 inches from each end. What is the minimum number of bolts for this piece?

    Answer: 8

    IBC Section 2308.3.1 requires 1/2-inch bolts embedded at least 7 inches, at most 6 ft on center, at least two per piece, with one bolt 4 to 12 inches from each end. Distance between the end bolts: 40 ft - 2 x 1 ft = 38 ft. Spaces: 38 / 6 = 6.33, which rounds up to 7 spaces. Bolts = 7 spaces + 1 = 8. Answering 7 counts the spaces but forgets the extra bolt at the end. Answering 6 rounds 6.33 spaces down and also forgets the extra bolt. 9 is more than the minimum.

    Reference: 2018 International Building Code, Section 2308.3.1

  10. Under the 2018 IBC, what is the minimum roof slope for asphalt shingles, and up to what slope is double underlayment required?

    Answer: 2:12 minimum; double underlayment up to 4:12

    IBC Section 1507.2.2 allows asphalt shingles only on slopes of 2 units vertical in 12 horizontal (17 percent) or steeper. From 2:12 up to 4:12, double underlayment is required per Section 1507.1.1. 3:12 is the minimum for lapped metal panels without sealant, which is a common mix-up.

    Reference: 2018 International Building Code, Section 1507.2.2

Sources

Questions last verified October 20, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.