Requirements at a glance
| Agency | Alaska Division of Corporations, Business and Professional Licensing (CBPL); exam by PSI |
|---|---|
| Experience | Set by 12 AAC 32 (electrical) and 12 AAC 39 (mechanical); for the unlimited categories, for example 4 of the last 6 years as a journeyman plus management experience, or an equivalent |
| Exam | 100 questions, 4 hours, 70% |
| Books allowed | IMC 2012, UPC 2018, NFPA 54 (2018) and the Alaska mechanical statutes and regulations |
| Fee | $150 to PSI per registration, plus the CBPL application and license fees |
Pipefitters and boiler and process piping contractors seeking a mechanical administrator license in the heating, cooling and process piping category.
Official links
How to get licensed, step by step
Apply to the CBPL
Send the Division your application, fee and supporting documents. When it approves you, it mails an eligibility letter with your state ID number.
Alaska Division of Corporations, Business and Professional Licensing (CBPL) (opens in a new tab)
Schedule the heating, cooling and process piping exam with PSI
Register online or call PSI at 855-746-8173. Your eligibility letter is valid for one year and you can retake as often as you like in that year, paying each time.
Schedule with PSI (mechanical administrators) (opens in a new tab)
Pass the exam
You need 70%. Scores are valid for 12 months toward the license.
Schedule with PSI (mechanical administrators) (opens in a new tab)
Get licensed
Send the Division your results and the license fee. Administrator licenses run 2 years and expire December 31 of odd-numbered years.
Alaska Division of Corporations, Business and Professional Licensing (CBPL) (opens in a new tab)
How to prepare
- Bring the exact editions on PSI's outline: the 2020 NEC, 2018 UPC, 2012 IMC, 2018 NFPA 54 and 2018 IRC. Code questions are based only on the listed edition.
- Tab your books before exam day with permanent tabs only. You can highlight and underline, but you can't write in them or bring loose papers; sticky notes are removed.
- Every administrator exam has an Alaska statutes and regulations section drawn from the Division's PDFs (AS 08.18, AS 08.40, 12 AAC 21, 32 and 39). Tab those too.
- Piping systems (20), boilers (15), chillers (15) and venting (15) lead the outline; combustion air is 10.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Official reference list (as published by the testing agency)
- International Mechanical Code (IMC), 2012 edition
- Uniform Plumbing Code (UPC), 2018 edition
- NFPA 54 National Fuel Gas Code, 2018 edition
- Alaska Mechanical Administrator Statutes and Regulations (AS 08.40; 12 AAC 39)
- Alaska Centralized Regulations and Statutes
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Piping Systems | 20 | |
| Boilers | 15 | |
| Chillers and Refrigeration | 15 | |
| Chimneys, Flues, Vents | 15 | |
| Combustion Air | 10 | |
| AK Statutes | 10 | |
| Controls | 8 | |
| Testing and Troubleshooting | 7 |
Exam day details
- Administered by PSI Services for the Alaska Division of Corporations, Business and Professional Licensing (CBPL).
- Fee: $150 to PSI per exam registration (not refundable or transferable). CBPL application and license fees are separate.
- 100 scored questions in 4 hours; 70 correct (70%) to pass. Plus up to 10 unscored experimental items.
- The license may supervise pneumatic and electric controls and retrofitting of control wiring of 48 volts or less that do not alter the electrical characteristics of the system (12 AAC 39).
- Open book: bring your own copies of the allowed references. You may highlight and add permanent tabs beforehand, but not write in them; sticky notes are removed. A silent, non-printing, non-programmable calculator is allowed.
- PSI may add 1 to 10 unscored experimental items, which count against your time.
- The CBPL approves your application first and sends an eligibility letter; the letter is valid for one year, and you may retake as many times as you like in that year (a new fee each time). If you do not pass within the year, you must reapply.
- Since 10/20/2026 the electrical and mechanical administrator exams can be taken remotely or at a PSI test site.
Frequently asked questions
What is on the Alaska heating, cooling and process piping exam?
100 questions: piping systems 20, boilers 15, chillers and refrigeration 15, chimneys, flues and vents 15, combustion air 10, Alaska statutes 10, controls 8 and testing and troubleshooting 7.
Which codes apply?
The 2012 IMC, 2018 UPC and 2018 NFPA 54.
Free questions with answers
Show all 10 free questions and answers
A contractor wants to reuse several gate valves and a length of steel pipe from a removed heating loop in a new hydronic system. What does IMC 1202.2 require?
Answer: They must be clean, free of foreign material and approved by the code official
Section 1202.2 allows reused pipe, fittings, valves and other materials only if they are clean and free of foreign materials and the code official approves the reuse. A visual check or a self-applied test stamp does not replace that approval.
Reference: 2012 International Mechanical Code (Alaska Mechanical Code 2012), 1202.2
Which pair of standards does Table 1202.4 list for steel pipe used in hydronic piping?
Answer: ASTM A 53 and ASTM A 106
Table 1202.4 lists ASTM A 53 and ASTM A 106 for steel pipe. B 42 and B 302 are copper pipe, D 1785 and D 2241 are PVC pipe, and F 876 and F 877 are cross-linked polyethylene (PEX) tubing.
Reference: 2012 International Mechanical Code (Alaska Mechanical Code 2012), Table 1202.4
What type of pressure protection does IMC Section 1006 require on steam boilers and on hot water boilers?
Answer: A safety valve on steam boilers and a safety relief valve on hot water boilers
Section 1006.1 requires all steam boilers to be protected with a safety valve and Section 1006.2 requires hot water boilers to be protected with a safety relief valve. Section 1006.4 adds that the valves must be listed and labeled and set no higher than the boiler nameplate pressure.
Reference: 2012 International Mechanical Code (Alaska Mechanical Code 2012), 1006.1, 1006.2 and 1006.4
Which listing standards apply to oil-fired boilers and to electric boilers, with their control systems, under IMC 1004.1?
Answer: UL 726 for oil-fired boilers and UL 834 for electric boilers
Section 1004.1 requires oil-fired boilers and controls to be listed and labeled to UL 726, electric boilers to UL 834 and solid-fuel-fired boilers to UL 2523. Boilers must also be designed to ASME CSD-1 and the applicable ASME Boiler and Pressure Vessel Code section or NFPA 8501/8502/8504.
Reference: 2012 International Mechanical Code (Alaska Mechanical Code 2012), 1004.1
A technician recovers refrigerant from one customer system and wants to charge it into a different customer system. What does IMC 1102.2.2 require before this is done?
Answer: It must be tested and found to meet the ARI 700 purity requirements
Section 1102.2.2.2 allows recovered refrigerant to be reused only in the system it came from or other systems of the same owner, after filtering and drying. Under 1102.2.2.3, used refrigerant going into a different owner equipment must be tested and found to meet ARI 700.
Reference: 2012 International Mechanical Code (Alaska Mechanical Code 2012), 1102.2.2.2 and 1102.2.2.3
A solid-fuel appliance has a 6-inch round flue collar. What is the largest standard round flue diameter that meets the limit in IMC 801.7 on flue area for solid-fuel appliances?
Answer: 10 inches
Section 801.7 limits the flue cross-sectional area to three times the area of the flue collar. The 6-inch collar is 28.3 square inches, so the limit is 84.8 square inches. A 10-inch round flue is 78.5 square inches (allowed), while 12 inches is 113.1 and 14 inches is 153.9 square inches (too large). An 8-inch flue also meets the limit but is not the largest.
Reference: 2012 International Mechanical Code (Alaska Mechanical Code 2012), 801.7
Two appliances share a mechanical room: a 150,000 Btu/h boiler and a 40,000 Btu/h water heater, both natural draft. Using the standard method in UPC 506.2.1, what is the minimum room volume to rely on indoor air?
Answer: 9,500 cubic feet
UPC 506.2.1 (NFPA 54:9.3.2.1) requires at least 50 cubic feet per 1,000 Btu/h of the total input of all appliances in the space: (150,000 + 40,000) / 1,000 x 50 = 190 x 50 = 9,500 cubic feet. Omitting the water heater gives 7,500; the 15 cubic feet factor belongs to the fan-assisted infiltration method.
Reference: 2018 Uniform Plumbing Code, 506.2.1 and 506.2
Which work is part of the scope of a mechanical administrator license in the heating, cooling, and process piping category under 12 AAC 39.232(b)?
Answer: Installing hydronic heating, cooling and process piping systems, including steam and hot water systems of any temperature-pressure range
12 AAC 39.232(b)(1) covers hydronic heating, cooling and process piping systems including steam and hot water systems of any temperature-pressure range, chilled water and condensing water systems, pressure vessels, heat exchangers, boilers, refrigeration water chillers, cooling towers, fuel oil tanks and piping, and fuel gas piping. Ducts and sheet metal belong to the unlimited HVAC/sheet metal category, and drainage piping to plumbing.
Reference: Alaska Mechanical Administrator Statutes and Regulations, 12 AAC 39.232(b)(1)
In a refrigerant machinery room, when must the compressors, pumps and normally closed automatic refrigerant valves shut off automatically under IMC 1106.5.1?
Answer: When vapor concentration exceeds the detector upper limit or 25 percent of the LEL, whichever is lower
Section 1106.5.1 requires, in addition to the break-glass off-only switch, that the compressors, refrigerant pumps and normally closed automatic refrigerant valves shut off automatically when refrigerant vapor concentration exceeds the detector upper detection limit or 25 percent of the LEL, whichever is lower.
Reference: 2012 International Mechanical Code (Alaska Mechanical Code 2012), 1106.5.1
A welded steel natural gas piping system will be air tested. What minimum test pressure and duration does UPC 1213.3 call for?
Answer: 60 psi for not less than 30 minutes
UPC 1213.3 requires welded piping and piping carrying gas above 14 inches water column to be tested at not less than 60 psi for a time satisfactory to the Authority Having Jurisdiction but not less than 30 minutes, using air, CO2 or nitrogen. Low-pressure threaded systems use 10 psi for 15 minutes, and CSST above 14 inches water column uses 30 psi for 30 minutes.
Reference: 2018 Uniform Plumbing Code, 1213.3
Sources
- PSI: Alaska Mechanical Administrators Examination Candidate Information Bulletin (updated 10/15/2026) (opens in a new tab)
- Alaska Division of Corporations, Business and Professional Licensing (opens in a new tab)
Questions last verified November 16, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.