Requirements at a glance
| Agency | Wisconsin Department of Safety and Professional Services (DSPS) |
|---|---|
| Experience | No experience requirement (SPS 305.63); exam waived for a current Wisconsin Commercial Building Inspector |
| Exam | 115 questions, 3 hours, 70% to pass |
| Books allowed | One binder (SPS 305, SPS 320, SPS 321, SPS 322 and printed notes) |
| Fees | $90 at Pearson VUE ($25 at a DSPS site), plus the credential fee ($40 plus $15 application, 24 CE hours, renews June 30) |
Municipal and contract inspectors applying to DSPS for a UDC construction inspector credential (SPS 305.63). There is no experience requirement; you apply, pay and pass.
Official links
- Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)
- DSPS: trades exam information and fee schedule (opens in a new tab)
- Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 320 (UDC administration and enforcement) (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 321 (UDC construction standards) (opens in a new tab)
- DSPS permitted trades exam materials (PDF) (opens in a new tab)
How to get licensed, step by step
Apply to DSPS
Apply in LicensE for the UDC construction inspector credential, then pay and pass the exam.
Wisconsin Department of Safety and Professional Services (DSPS) (opens in a new tab)LicensE: apply for your credential (opens in a new tab)
Schedule your exam
Once your qualifications are met, DSPS sends an exam authorization. Schedule with Pearson VUE or, for electrical exams, a DSPS exam site. If you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
DSPS: trades exam information and fee schedule (opens in a new tab)Pearson VUE: Wisconsin DSPS Trades candidate handbook (PDF) (opens in a new tab)
Take the exam
115 questions, 3 hours, 70% to pass. Bring only the items DSPS lists; sticky notes, loose paper and removable tabs are not allowed.
Wisconsin Admin. Code chapter SPS 320 (UDC administration and enforcement) (opens in a new tab)Wisconsin Admin. Code chapter SPS 321 (UDC construction standards) (opens in a new tab)DSPS permitted trades exam materials (PDF) (opens in a new tab)
Results and licensing
After you pass, wait 2 days, then submit your license application in LicensE. DSPS sends one exam authorization at a time, so a retake needs a new authorization. On two-part exams a failed part is retaken alone and all parts must be passed within 1 year.
How to prepare
- Know the Uniform Dwelling Code layout: administration and enforcement in SPS 320, construction standards in SPS 321 and energy conservation in SPS 322.
- Our bank follows the Wisconsin SPS text only; the UDC Appendix is not freely readable.
- Every Wisconsin trades exam is open book, but DSPS limits what you can bring (a binder plus the listed books), and tabs must come with a bound book. Practice finding answers fast in your own binder.
- DSPS publishes no content outline or topic weights, so our topic split is an estimate built from the reference lists DSPS prints. Counts and times come from DSPS's exam table.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the UDC (SPS 320 to 325). Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
Wisconsin Uniform Dwelling Code: Wisconsin Admin. Code SPS 305 and SPS 320 to 325Essential
Put these chapters in your binder. The UDC Appendix is sold by DSPS and is not freely readable.
Official reference list (as published by the testing agency)
- One binder with Wis. Admin. Code SPS 305, SPS 320, SPS 321 and SPS 322 and your printed notes
- Printed notes go in a three-ring binder; practice exams do not count as notes
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| UDC Administration and Enforcement (SPS 305.63, SPS 320) | 10 | |
| Design Criteria, Exits and Fire Safety (SPS 321.02 to 321.11) | 14 | |
| Excavations, Footings and Foundations (SPS 321.12 to 321.18) | 16 | |
| Floors, Walls and Decks (SPS 321.19 to 321.26) | 18 | |
| Roofs, Fireplaces, Chimneys and Floodplains (SPS 321.27 to 321.34) | 16 | |
| Energy Conservation (SPS 322) | 14 | |
| Modular Homes, Manufactured Home Installation and Variances (SPS 320, SPS 321.40) | 12 |
Exam day details
- Administered by the Wisconsin Department of Safety and Professional Services (DSPS); exams are given by Pearson VUE or at a DSPS exam site.
- Fee: $90 at Pearson VUE ($25 at a DSPS exam site). The credential application fee is separate.
- 115 questions in 3 hours (DSPS exam table, not checked against Pearson); open book; 70% to pass.
- The exam is waived if you hold a current Wisconsin Commercial Building Inspector credential.
- Our questions follow the Wisconsin SPS text. The UDC Appendix, NFPA 13D and the international model codes are not freely readable, so they are not in our bank.
- Open book: bring one binder (three-hole-punched printed notes and printed code), plus the other references DSPS lists for your exam. Loose paper, removable tabs, sticky notes and paperclips are not allowed; practice exams do not count as notes.
- You can test at a Pearson VUE center or a DSPS exam site, but once you choose Pearson you cannot switch back. Plumbing and HVAC Qualifier exams are given only at Pearson centers.
- The passing score is 70%. For two-part exams you need 70% in each part, a failed part is retaken alone, and all parts must be passed within 1 year (SPS 305.09(6)).
- DSPS sends one exam authorization at a time. After you pass, wait 2 days, then apply for the license in LicensE.
- DSPS publishes no content outline or topic weights (SPS 305.09(5) says the exams are based on a job analysis), so our topic split is an estimate built from the reference lists DSPS prints.
Note: DSPS publishes the question counts, time limits and permitted references but no content outline or topic weights, so our topic split is an estimate. Counts come from DSPS's exam table and were not checked against Pearson.
Frequently asked questions
Is there an experience requirement for a UDC construction inspector?
No. SPS 305.63 requires an application, the fee and a passing exam score.
Who can skip the exam?
Holders of a current Wisconsin Commercial Building Inspector credential.
Which rules does it cover?
The Uniform Dwelling Code: administration and enforcement (SPS 320), construction standards (SPS 321) and energy conservation (SPS 322) for one- and two-family dwellings.
Free questions with answers
Show all 10 free questions and answers
A building has three dwelling units and lacks the separations that SPS 320.04(6) requires between separate dwellings. How is it regulated?
Answer: It is a commercial building that must meet chs. SPS 361 to 366
The note to SPS 320.04(6) says a building of three or more dwelling units without the specified separations is a commercial building subject to chs. SPS 361 to 366. Separate entrances do not change this.
Reference: Wisconsin Administrative Code, SPS 320.04 (6), Note 2
Under SPS 320.13, what must a modular home bear before it may be sold for initial use or installed in Wisconsin?
Answer: A Wisconsin insignia or a reciprocally recognized state seal
SPS 320.13(1) bars manufacture for use, sale or installation of a modular home unless it is approved by the department and bears the Wisconsin insignia or a reciprocally recognized state seal or insignia.
Reference: Wisconsin Administrative Code, SPS 320.13 (1)
A plan reviewer checks the first floor of a one-family dwelling that is larger than 400 square feet and has no egress windows. How many exit doors must be accessible from the first floor under SPS 321.03?
Answer: Two exit doors
SPS 321.03(1)(a) requires at least 2 exit doors accessible from the first floor, except for tiny dwellings under par. (h) or when egress windows are used under par. (h)3. At least one must discharge to grade without passing through a garage.
Reference: Wisconsin Administrative Code, SPS 321.03 (1) (a), (b)
An egress window in a basement bedroom has its clear opening 62 inches above the floor. What does SPS 321.03(6)(d) say about this window?
Answer: It does not comply because the lowest point of the opening may be no more than 60 inches above the floor
SPS 321.03(6)(d)1. says the lowest point of the clear opening for any window used for exiting is no more than 60 inches above the floor. A platform under (6)(d)2. only helps when the opening is more than 46 inches up but still within the 60-inch limit.
Reference: Wisconsin Administrative Code, SPS 321.03 (6) (d) 1.
SPS 321.12(1) requires finished grade to slope away from the dwelling at a rate of at least 1/2 inch per foot for at least 10 feet. How much total fall does that give over the 10 feet?
Answer: 5 inches
1/2 inch per foot x 10 feet = 5 inches of fall. Where the surface is impervious, SPS 321.12(2) requires equivalent drainage over the same 10 feet; where barriers prevent 10 feet, swales are used under (3).
Reference: Wisconsin Administrative Code, SPS 321.12 (1)
A complete drain tile system has exterior and interior tile. What is the maximum spacing of bleeders connecting them, and the minimum grade of tile leading to the sump pit?
Answer: Bleeders at no more than 8-foot intervals; tile graded at least 1/8 inch per foot to the sump
SPS 321.17(3)(d)6.a. limits bleeder spacing to 8-foot intervals (minimum 3-inch interior diameter), and (d)7. requires tile leading from the footing tiles to the sump pit at a grade of at least 1/8 inch per foot.
Reference: Wisconsin Administrative Code, SPS 321.17 (3) (d) 6., 7.
A concrete floor is being placed on clay soil in a new dwelling. What does SPS 321.20 require under the slab?
Answer: A 4-inch base course of clean graded sand, gravel or crushed stone
SPS 321.20(2) requires a 4-inch base course of clean graded sand, gravel or crushed stone when a concrete floor is placed in clay soils. On sand or gravel soils the base may be omitted unless drain tile is installed (sub. (3)).
Reference: Wisconsin Administrative Code, SPS 321.20 (2), (3)
A rafter spans 9 feet measured from the outermost edge of the roof. How must it be fastened to the top plate of the bearing wall under SPS 321.27(3)(b)?
Answer: With engineered clips, straps or hangers
SPS 321.27(3)(b)1 requires engineered clips, straps or hangers for members spanning more than 6 feet from the roof edge. Toe-nailing is allowed only for spans of 6 feet or less (subd. 2).
Reference: Wisconsin Administrative Code, SPS 321.27 (3)(b)
Where and how often must collar ties be placed under SPS 321.27(4)(a)?
Answer: Upper third of every third pair of rafters or every 48 inches, whichever is less
SPS 321.27(4)(a)2 requires collar ties in the upper third of every third pair of abutting rafters or every 48 inches, whichever is less. They stabilize the ridge but do not replace wall lateral restraint under sub. (2).
Reference: Wisconsin Administrative Code, SPS 321.27 (4)(a) 2.
A slab floor has its bottom 8 inches below adjacent grade. What vertical perimeter insulation is required at an exterior door threshold under SPS 322.33(1)(b)?
Answer: At least R-5, excluding garage doors
SPS 322.33(1)(a) requires perimeter insulation for any slab whose bottom is less than 12 inches below adjacent grade, and (1)(b) requires at least R-5 vertical insulation at exterior door thresholds, excluding garage doors.
Reference: Wisconsin Administrative Code, SPS 322.33 (1)
Sources
- DSPS: trades exam information and fee schedule (opens in a new tab)
- Pearson VUE: Wisconsin DSPS Trades candidate handbook (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 320 (UDC administration and enforcement) (opens in a new tab)
- Wisconsin Admin. Code chapter SPS 321 (UDC construction standards) (opens in a new tab)
Questions last verified November 11, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.