National certification

ICC Residential Building Contractor (C) Exam (13): Practice Test & Licensing Guide

ICC's National Standard exam 13 for Class C residential contractors: 80 questions in 4 hours, open book on the 2021 International Residential Code.

Questions
80
Time limit
4 hours
Passing score
75%

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Permits and General Regulations

A client wants a freestanding deck of 180 square feet that is not attached to the house and does not serve a required exit door. At its highest point the walking surface will be 34 inches above grade. Does the deck need a permit?

Requirements at a glance

Who requires itClass C residential contractor licenses in Denver, PPRBD (B-C, B-E), Larimer, Jefferson and Boulder counties, Aurora, Centennial, and Fort Collins (Class D)
Exam80 questions, 4 hours, open book
Books allowed2021 IRC
Fee$120 per attempt (Pearson VUE), plus your jurisdiction's license fee

Residential builders and remodelers (Class C, or Class D in Fort Collins) in jurisdictions that license contractors with ICC exams, including Denver, PPRBD (B-C, B-E), Larimer, Jefferson and Boulder counties, Aurora and Centennial.

How to get certified, step by step

  1. Check your jurisdiction's requirement

    Find your license class on your city or county's contractor page and note the exact ICC exam ID. The letter shows the code year (G = 2018, T = 2021), and from December 1, 2026 the T-series ID also shows whether you need 70% or 75%.

    Denver: contractor licenses and supervisor certificates (opens in a new tab)Pikes Peak Regional Building Department: contractor licensing (opens in a new tab)

  2. Register with ICC

    Create an ICC account, buy the exam from ICC's catalog, then schedule with Pearson VUE at a test center or online.

    ICC exam catalog and registration (opens in a new tab)

  3. Bring the right code books

    Open book: 2021 IRC. Tabs and highlighting are allowed; loose notes aren't.

    ICC 2021 National Contractor/Trades bulletin (PDF) (opens in a new tab)

  4. Pass and apply

    Results are immediate. Submit your passing score with your license application, insurance and fees. If you fail, wait 10 days to retake.

How to prepare

  • Tab your code book by chapter before exam day; most questions are lookups, and 4 hours goes fast.
  • Structural framing is about half the exam: practice span tables (R502, R802), fastener schedule Table R602.3(1) and foundation tables in R403–R404.
  • Know Chapter 3: egress windows, stairs, guards, smoke and CO alarms, garage separation.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2021 IRC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • International Residential Code (IRC), 2021

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Permits and General Regulations15
Building Planning and Life Safety20
Structural Systems45
Building Envelope12
Trade Systems8

Exam day details

  • Administered by International Code Council (ICC), delivered by Pearson VUE.
  • Fee: $120 per attempt (Pearson VUE). Your city or county license fee is separate.
  • 80 multiple-choice questions in 4 hours, open book.
  • ICC's 2021 outline for this exam appears to be copied from exam 12 (it lists the IBC and adds up to 110%). Earlier editions are IRC-only with structural systems at about half the exam, so our topic mix follows that.
  • Exam IDs show the code year: F = 2015 codes (retired December 1, 2026), G = 2018, T = 2021. Our questions use the 2021 codes; check which edition your jurisdiction requires.
  • From December 1, 2026 the 2021 (T-series) exams come in 70% and 75% passing versions, and each jurisdiction picks one. ICC has historically used a scaled 75.
  • Open book: bring the listed references. Four-option multiple choice, no penalty for guessing. Results are immediate, and you wait 10 days to retake.

Frequently asked questions

What book do I need for the ICC 13 exam?

The International Residential Code for the edition your jurisdiction requires. Our questions use the 2021 IRC.

What's on the ICC Residential Building Contractor exam?

Mostly structural: footings and foundations, floor, wall and roof framing. Then permits and administration, building planning (egress, smoke alarms, fire separation), the building envelope and some mechanical, plumbing and electrical basics.

Free questions with answers

Show all 10 free questions and answers
  1. A client wants a freestanding deck of 180 square feet that is not attached to the house and does not serve a required exit door. At its highest point the walking surface will be 34 inches above grade. Does the deck need a permit?

    Answer: Yes, because it is more than 30 inches above grade

    Section R105.2 exempts a deck only when all four conditions are met: not more than 200 square feet, not more than 30 inches above grade at any point, not attached to a dwelling, and not serving the exit door required by Section R311.4. This deck meets the area, attachment and exit-door conditions but is 34 inches above grade, so the exemption does not apply. Meeting one or two of the conditions is not enough.

    Reference: 2021 International Residential Code, Section R105.2

  2. On a new house, the framing, roof, fireblocking and bracing are complete. The plumber, HVAC installer and electrician have not yet roughed in. What is the correct inspection sequence under Section R109.1?

    Answer: Rough-ins first, then the framing inspection

    Section R109.1.2 requires rough inspection of plumbing, mechanical, gas and electrical systems before they are covered, before fixtures or appliances are set, and prior to the framing inspection. So the trades must rough in and pass before you call for framing (R109.1.4). Calling the framing inspection first would mean the framing gets inspected before the trades cut and bore through it.

    Reference: 2021 International Residential Code, Section R109.1.2

  3. You are building a two-story house with a finished basement. All four bedrooms are on the second floor and open onto one hallway. The first floor and the basement have no bedrooms. What is the minimum number of smoke alarms required by Section R314.3?

    Answer: 7

    Section R314.3 requires a smoke alarm in each sleeping room (4), one outside the separate sleeping area in the immediate vicinity of the bedrooms (1, in the upstairs hall), and one on each additional story, including basements (1 on the first floor and 1 in the basement). Total = 4 + 1 + 1 + 1 = 7. Answering 6 usually forgets the basement or the first floor. The alarms must also be interconnected under Section R314.4.

    Reference: 2021 International Residential Code, Section R314.3

  4. You are building a bonus room over an attached garage. What must be installed on the garage ceiling below the bonus room under Table R302.6?

    Answer: At least 5/8-inch Type X gypsum board or equivalent

    Table R302.6 requires not less than 5/8-inch Type X gypsum board or equivalent where the garage is separated from habitable rooms above it. The structure supporting that ceiling must be protected with at least 1/2-inch gypsum board. The 1/2-inch choice is the requirement for separating the garage from the residence and attics, not from habitable rooms above.

    Reference: 2021 International Residential Code, Table R302.6

  5. You are framing a living-room floor (40 psf live load, 10 psf dead load) with Spruce-pine-fir No. 2 2x10 joists at 16 inches on center. Using Table R502.3.1(2), what is the maximum allowable joist span?

    Answer: 15-5

    Table R502.3.1(2) covers residential living areas at 40 psf live load. In the 16-inch spacing block, the Spruce-pine-fir #2 row under the 10 psf dead load columns gives 15-5 for a 2x10. 14-1 is the same joist under the 20 psf dead load columns, 17-3 is the 12-inch spacing value, and 16-0 is the Select Structural (SS) grade at 16 inches.

    Reference: 2021 International Residential Code, Table R502.3.1(2)

  6. A client wants 5/4 (1 1/4-inch-thick) wood deck boards installed diagonally at 45 degrees to the joists, with each board running across at least three joists. Using Table R507.7, what is the maximum joist spacing?

    Answer: 12 inches

    Table R507.7 lists 1 1/4-inch-thick wood decking. Boards supported by three or more joists are multiple span (footnote). For decking diagonal to the joists, the multiple-span limit is 12 inches. The 16-inch value is for boards laid perpendicular to the joists, and 8 inches is the diagonal single-span value. Diagonal boards are limited to 45 degrees from perpendicular.

    Reference: 2021 International Residential Code, Table R507.7

  7. A framer splicing 16-foot plates on a long wall asks how far the butt joint in the cap plate must be kept from the joint in the plate below it. What is the minimum offset under Section R602.3.2?

    Answer: At least 24 inches

    Section R602.3.2 requires a double top plate with overlaps at corners and intersections, and end joints in the top plates offset at least 24 inches. Joints need not fall over studs. The splice is nailed per Table R602.3(1), Item 14, which also references a 24-inch minimum lap on each side of the joint.

    Reference: 2021 International Residential Code, Section R602.3.2

  8. The shingle manufacturer's instructions do not call for more fasteners than the code minimum. How many fasteners are required per asphalt strip shingle?

    Answer: Not less than 4

    Section R905.2.6 requires the number of fasteners in the manufacturer's instructions, but not less than four per strip shingle or two per individual shingle. Two is the individual-shingle minimum, not the strip-shingle minimum. On slopes over 21:12, shingles must be installed per the manufacturer's instructions, which often call for six.

    Reference: 2021 International Residential Code, Section R905.2.6

  9. Table R301.2 shows a history of ice damming at eaves in your jurisdiction. You are shingling a 10:12 roof. Where must the ice barrier extend?

    Answer: Both 24 in inside the wall line and 36 in up the slope

    Section R905.1.2 requires an ice barrier (two layers of underlayment cemented together or a self-adhering polymer-modified bitumen sheet) from the lowest roof edges to a point at least 24 inches inside the exterior wall line. On roofs of 8:12 or steeper, it must also extend at least 36 inches measured along the slope from the eave edge. A 10:12 roof triggers both conditions. Steep roofs are not exempt.

    Reference: 2021 International Residential Code, Section R905.1.2

  10. A gas furnace that is not listed as flammable-vapor-ignition-resistant will be installed in an attached garage. How high must its ignition source be above the garage floor?

    Answer: At least 18 inches

    Section M1307.3 requires appliances with an ignition source in garages to be elevated so the ignition source is at least 18 inches above the floor. Gasoline vapors are heavier than air and collect near the floor. Rooms that open into the garage and are not part of the living space count as part of the garage. Appliances listed as flammable-vapor-ignition-resistant are exempt.

    Reference: 2021 International Residential Code, Section M1307.3

Sources

Questions last verified October 21, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.