Requirements at a glance
| Agency | Oregon Construction Contractors Board (CCB); exam by PSI |
|---|---|
| Prerequisite | Finish a CCB-approved pre-license course (the provider reports to PSI), or pass the NASCLA commercial general building exam |
| Exam | 80 scored questions in 180 minutes (plus 5 to 8 unscored); open book; 70% to pass |
| Books allowed | NASCLA Contractors Guide to Business, Law and Project Management, Oregon Construction Contractors, 2nd Edition (English or Spanish), tabbed and highlighted |
| Fees | $60 to PSI, valid one year, covers retakes; CCB license fees are separate |
Anyone applying to the Construction Contractors Board for a residential, commercial, specialty or limited contractor license, including HVAC contractors. Oregon has no CCB trade exam.
Official links
How to get licensed, step by step
Complete the prerequisite
Take a CCB-approved pre-license course, or pass the NASCLA commercial general building exam and send proof to the CCB.
Schedule with PSI
You get an eligibility email from PSI. Create an account, pay the $60 fee and book a test center or an online appointment.
Pass the exam
80 scored questions in 180 minutes, open book. You need 70%, and your score shows on screen. Retakes are unlimited.
Apply for your license
Apply to the CCB within 2 years of passing, with the license fee, your score report and the other required documents.
How to prepare
- One exam serves every CCB license, including HVAC. There is no trade exam, and electrical and plumbing businesses are licensed by BCD instead.
- Oregon Construction Contractor Laws and Regulations is 18 of 80 scored questions; contracts (9), hiring and managing employees (7) and bidding and estimating (6) come next. The full list of 14 areas is in the blueprint.
- The exam is open book on the NASCLA guide. Our questions test Oregon law and business principles rather than guide page numbers, so tab the guide by topic to find answers fast.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NASCLA guide. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NASCLA Contractors Guide to Business, Law and Project Management, Oregon Construction Contractors, 2nd EditionEssential
The only reference allowed in the CCB exam. English and Spanish editions are both allowed. You may highlight, underline and tab it before the exam.
Official reference list (as published by the testing agency)
- NASCLA Contractors Guide to Business, Law and Project Management, Oregon Construction Contractors, 2nd Edition (English or Spanish; you may bring both). Highlighting, underlining, tabs, indexing and handwritten notes are allowed before the exam, not during it.
- One bound word-for-word translation dictionary if English is your second language.
- An online calculator is provided; handheld calculators are not allowed.
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Oregon Const. Contractor Laws and Regulations | 18 | |
| Choosing Your Business Structure | 4 | |
| Hiring and Managing Employees | 7 | |
| Working with Subcontractors | 2 | |
| Contracts | 9 | |
| Oregon Lien Law | 5 | |
| Bidding and Estimating | 6 | |
| Scheduling and Project Management | 5 | |
| Oregon Building Codes | 4 | |
| Jobsite Safety | 4 | |
| Environmental Factors | 4 | |
| Building Exterior Shell | 4 | |
| Financial Management | 4 | |
| Tax Basics | 4 |
Exam day details
- Administered by PSI Services for the Oregon Construction Contractors Board (CCB).
- Fee: $60 to PSI, valid for one year and good for first-time and repeat attempts. CCB license fees are separate.
- 80 scored questions in 180 minutes, plus 5 to 8 unscored questions with 20 more minutes. 70% to pass; the score appears on screen.
- You must be pre-approved: your CCB-approved pre-license course provider reports to PSI, or you submit a NASCLA commercial general building exam pass to the CCB first.
- The $60 fee is valid one year and covers retakes; retakes are unlimited with no expiration date.
- Apply for your CCB license within two years of passing. Send the application, license fee and score report to the CCB.
- Electrical contractors, plumbing businesses and limited energy, renewable and maintenance contractors are licensed by BCD and take no CCB exam.
Frequently asked questions
Does Oregon have a trade exam for contractors?
No. The CCB uses one laws-and-business exam for every contractor license, including HVAC. BCD handles electrical and plumbing businesses without a separate exam.
Is the CCB exam open book?
Yes. Bring the NASCLA Contractors Guide to Business, Law and Project Management for Oregon (2nd Edition), which you may tab and highlight.
How many questions are on the exam?
80 scored questions plus 5 to 8 unscored ones, 180 minutes for the scored part. You need 70%. Our questions test Oregon law and business principles, not page numbers in the guide.
How do I qualify to sit for it?
Complete a CCB-approved pre-license course (the provider reports to PSI) or pass the NASCLA commercial general building exam and send proof to the CCB.
Free questions with answers
Show all 10 free questions and answers
A person does about $800 of work on one project for a neighbor. The work is minor and casual, but the person also hands out business cards that say 'Contractor.' Under ORS 701.010, which statement is correct?
Answer: The exemption is lost, because the person advertises with a card that suggests a contractor
ORS 701.010(4) exempts work on one project when the total price for labor, materials and everything else is under $1,000 and the work is casual, minor or inconsequential. The same subsection says the exemption does not apply to a person who advertises or uses a sign, card or other device that might indicate to the public that the person is a contractor.
Reference: Oregon Revised Statutes (ORS) Chapter 701, ORS 701.010(4)
A contractor and owner sign a lump-sum (fixed-price) contract. During the work, the contractor's material costs rise sharply because of poor purchasing. Who bears the extra cost under a typical lump-sum contract?
Answer: The contractor, because the price is fixed unless a change order is approved
Under a lump-sum contract the contractor agrees to do the defined work for a fixed price, so the contractor carries the risk of cost overruns not caused by owner changes. Price adjustments come only through approved change orders for changes in scope. Cost-plus contracts pass actual costs to the owner and are the usual choice when scope is uncertain.
Reference: General contracting practice, Contract types: lump-sum (fixed-price) vs. cost-plus
A materials supplier delivered the last of its materials on June 1, and construction of the improvement was completed on August 1. Under ORS 87.035(1), by what date must the supplier perfect its lien by filing a claim of lien?
Answer: August 15, which is 75 days after the last material delivery by the supplier
A person with a lien under ORS 87.010(1) or (2), such as a supplier or laborer, must perfect it within 75 days after ceasing to furnish materials or 75 days after completion of construction, whichever is earlier. June 1 + 75 days = August 15; August 1 + 75 days = October 15. The earlier date, August 15, controls. A claim of lien is perfected by filing it with the county recording officer (ORS 87.035(2)). July 1 and September 30 are 30 and 60 day figures that the statute does not use.
Reference: Oregon Revised Statutes (ORS) Chapter 87, ORS 87.035(1)-(2)
Two contractors form a general partnership. One partner signs a materials order for the partnership and the partnership cannot pay. What is generally true?
Answer: Each partner can be held personally liable for the partnership's debts
In a general partnership each partner can bind the partnership in the ordinary course of business and is jointly liable for its debts without a liability cap. Limited liability requires a different form, such as an LLC, a corporation or a limited partner in a limited partnership. Under ORS 701.114(2), a partner leaving a partnership generally requires the partnership to obtain a new license.
Reference: General business principles (NASCLA-style contractor business topics); ORS Chapter 701, Business structures: general partnership; ORS 701.114(2)
A nonexempt crew member earns $24.00 per hour and works 46 hours in one workweek. Under federal overtime rules at one and one-half times the regular rate over 40 hours, what is the gross pay?
Answer: $1,176.00
Regular pay is 40 x $24.00 = $960.00. The overtime rate is $24.00 x 1.5 = $36.00, and 6 overtime hours x $36.00 = $216.00. Total gross pay is $960.00 + $216.00 = $1,176.00. $1,104.00 pays all 46 hours at straight time, $1,248.00 pays double time on the 6 hours and $1,656.00 pays every hour at the overtime rate.
Reference: General business principles (NASCLA-style contractor business topics) (Fair Labor Standards Act overtime), 29 U.S.C. 207(a)(1)
While preparing a bid, a contractor receives Addendum 2, which changes the scope of the structural drawings. What should the contractor do?
Answer: Review the addendum, adjust the estimate and acknowledge it in the bid
Addenda become part of the bid documents. An estimator must review each one, update the quantities and costs, and acknowledge the addenda in the bid, since a bid that ignores an addendum may be rejected or may leave the contractor to perform the added work at no added cost.
Reference: General estimating practice, Bid process: addenda
In a typical wood-frame house, which work usually follows the rough-in inspections and comes before the drywall is hung?
Answer: Insulation
Interior finish work follows rough framing, mechanical, electrical and plumbing rough-in and their inspections. Insulation is installed (and inspected where required) before drywall, which then covers the walls. Paint, finish flooring and landscaping come later, so scheduling them earlier would damage the work or block access.
Reference: General construction scheduling practice, Construction sequencing
In Oregon, which specialty code is the state's structural code that applies to commercial and other buildings that are not one- and two-family dwellings?
Answer: The Oregon Structural Specialty Code
Oregon's building code program adopts specialty codes by trade and building type. The Oregon Structural Specialty Code (OSSC) is the structural code for commercial and other non-residential buildings and is built on the International Building Code. The Oregon Residential Specialty Code covers one- and two-family dwellings and townhouses. The Oregon Structural Specialty Code is also the code referenced for disabled access provisions in the plumbing journeyman rules (OAR 918-695-0040).
Reference: 2026 Oregon Plumbing Specialty Code, Section 204.0, definition of Building Code (OSSC under OAR 918-460-0100 or ORSC under OAR 918-480-0005)
A worker uses a portable ladder to reach an upper roof landing. How far should the side rails extend above the landing under the federal construction standard, unless the ladder is secured and another grab device is provided?
Answer: At least 3 feet above the landing
29 CFR 1926.1053(b)(1) requires side rails of a ladder used to gain access to a landing to extend at least 3 feet above the upper landing surface (or be secured with a grab rail or other means). Shorter extensions leave the climber without a handhold when stepping off.
Reference: General building practice (OSHA 29 CFR Part 1926), 29 CFR 1926.1053(b)(1)
Before renovation or demolition of an older building, why is an asbestos survey commonly done by a qualified inspector?
Answer: To identify asbestos-containing materials before they are disturbed or removed
Asbestos fibers become a health hazard when asbestos-containing materials are disturbed. Federal and state rules require a thorough inspection before demolition or renovation that could disturb suspect materials, and abatement must be done by trained, certified workers if materials are found. A survey does not measure roof slope, insulation efficiency or fixtures.
Reference: General building practice, Asbestos: survey before renovation or demolition
Sources
- PSI: Oregon Construction Contractors Candidate Information Bulletin (effective 8/5/2025) (opens in a new tab)
- Oregon Construction Contractors Board (opens in a new tab)
- Oregon Revised Statutes Chapter 701 (opens in a new tab)
Questions last verified November 9, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.