Requirements at a glance
| Agency | Oklahoma Construction Industries Board (CIB); exams by PSI |
|---|---|
| Experience | Required for the electrical contractor license, in addition to the trade exam |
| Exam | 50 scored questions, 2 hours, 70% |
| Books allowed | NASCLA Contractors Guide (Basic, 14th Edition), OAC 158:40 and 158:10, 59 O.S. ch. 40A, 42 O.S. ch. 3 (liens), 85A O.S. ch. 1 |
| Fee | $92 to PSI per exam portion (non-refundable), plus CIB application and license fees |
| Retest | 30 days after each fail |
Electricians applying for an Oklahoma electrical contractor license, in addition to the trade exam.
Official links
How to get licensed, step by step
Register and log your hours
Register with the CIB as an apprentice and log your hours under a licensed contractor (1 year is 2,000 hours). Have your employer's affidavits notarized.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Apply to the CIB
Send the CIB your application and notarized experience affidavits. When it approves you, you receive an Ok Con ID.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Schedule with PSI
Book your exam with PSI online or at (855) 834-8750. Contractor applicants also take the Business and Law portion.
Schedule with PSI (Oklahoma contractor exams) (opens in a new tab)PSI: Oklahoma CIB Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)
Pass and get licensed
After you pass, send the CIB your results and license fee to receive your license.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
How to prepare
- All Oklahoma trade exams are open book, so the skill is finding answers fast: bound books, permanent tabs only, highlighting allowed, no writing.
- Bring a silent, non-programmable calculator. The exam adds up to 10 unscored experimental questions that count against your time.
- Bidding and estimating (10) and financial (8) are over a third of the exam: markup, overhead, margin and cash-flow math.
- Licensing requirements (6) come from the Electrical License Act and OAC 158:40; the CIB study-aids book is free and allowed.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the NASCLA guide and the CIB rules book. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th EditionEssential
Most business and law questions come from it. Bring your own copy with permanent tabs.
NASCLA: Contractors Guide to Business, Law and Project Management (opens in a new tab)
CIB Unofficial Administrative Rules and Courtesy Exam Study Aids BookEssential
Allowed in the exam room and free from the CIB office. Contains the licensing rules and statutes tested.
Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Official reference list (as published by the testing agency)
- NASCLA Contractors Guide to Business, Law and Project Management, Basic 14th Edition
- Oklahoma Lien Law, 42 O.S. Chapter 3
- Oklahoma Workers' Compensation Act, 85A O.S. Chapter 1 (or the CIB statutory excerpts)
- CIB Unofficial Administrative Rules & Courtesy Exam Study Aids Book, current edition (free from the CIB)
- Oklahoma Fine Schedule, OAC Title 158, Chapter 10
- Oklahoma Electrical Industry Regulations, OAC Title 158, Chapter 40
- Oklahoma Electrical License Act, 59 O.S. Chapter 40A
What's on the exam
Official content outline from PSI Services (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Bidding and Estimating | 10 | |
| Project Management and Supervision | 7 | |
| Contracts | 5 | |
| Financial | 8 | |
| Labor and Personnel | 5 | |
| Risk Management | 4 | |
| Payroll and Payroll Taxes | 5 | |
| Licensing Requirements | 6 |
Exam day details
- Administered by PSI Services for the Oklahoma Construction Industries Board (CIB).
- Fee: $92 to PSI per exam portion, non-refundable. CIB application and license fees are separate.
- 50 scored questions in 2 hours (120 minutes); 70% (35) to pass.
- If you fail, wait 30 days to retest.
- Open book: bring your own bound copies of the allowed references. You may highlight, underline and index them beforehand with permanent tabs only; no writing and no sticky notes.
- PSI may add up to 10 unscored experimental questions, which count against your time. A silent, non-printing, non-programmable calculator is allowed.
- The CIB must approve your application first (you receive an Ok Con ID) before you can schedule with PSI.
Frequently asked questions
What's on the Oklahoma electrical business and law exam?
50 scored questions: bidding and estimating 10, financial 8, project management and supervision 7, licensing requirements 6, contracts, labor and personnel and payroll and payroll taxes 5 each, and risk management 4.
What books are allowed?
The NASCLA Contractors Guide (Basic, 14th Edition), the Oklahoma Lien Law, the Workers' Compensation Act, the Electrical License Act, OAC 158:40, the Fine Schedule and the CIB study-aids book.
Free questions with answers
Show all 10 free questions and answers
Under OAC 158:40-11-2(c), which act is prohibited for a person who holds only a journeyman license?
Answer: Planning, contracting or furnishing labor and materials for electrical work
Rule 158:40-11-2(c) says a journeyman may not work except under the employment of a contractor, and may not engage in planning, contracting, or furnishing labor and/or materials. Working for a contractor and supervising apprentices are normal journeyman duties.
Reference: Oklahoma Administrative Code, Title 158, Chapter 40 (Electrical Industry Regulations), OAC 158:40-11-2(c)(2)
A crew is pricing 240 light fixtures. The estimating unit is 0.75 labor hour per fixture. The electricians' base wage is $30.00 per hour and labor burden (taxes, insurance, benefits) is 40% of wages, so the burdened labor rate is $42.00 per hour. What is the direct labor cost for installing the fixtures?
Answer: $7,560
Labor hours = 240 fixtures x 0.75 hr = 180 hr. Cost = 180 hr x $42.00 burdened rate = $7,560. $5,400 uses the unburdened $30.00 wage, $10,080 multiplies the fixture count by the rate and skips the unit time, and $5,472 adds the burden percent as 40 cents per hour instead of 40 percent.
Reference: General business practice, Estimating: labor units and burdened labor rate
An electrical contractor has current assets of $210,000 and current liabilities of $140,000. What is the current ratio?
Answer: 1.5 to 1, which means $1.50 of current assets for each $1.00 of current liabilities
Current ratio = current assets / current liabilities = $210,000 / $140,000 = 1.5. Inverting the fraction gives 0.67, which is the wrong direction. A ratio above 1 shows the firm can cover short-term debts with short-term assets.
Reference: General business practice, Financial: current ratio
A contractor submits a progress billing of $48,000 on a job where the owner withholds 10% retainage. How much will the owner pay now, and how much is retained?
Answer: $43,200 paid, $4,800 retained
Retainage = 10% x $48,000 = $4,800. The payment now = $48,000 - $4,800 = $43,200. The retained amount is released after the conditions in the contract are met. The reversal ($4,800 paid) and the 20% figure ($38,400 / $9,600) do not match a 10% withholding.
Reference: General business practice, Financial: progress billing and retainage
A contractor pays an employee $1,000 in a week. How much total FICA tax (employee share withheld plus the employer's matching share) goes to the IRS for that paycheck?
Answer: $153.00
Social Security is 6.2% and Medicare 1.45% for each of the employee and the employer, so each pays 7.65% of $1,000 = $76.50, and the total is $153.00. $76.50 counts only one share, $62.00 is the Social Security share of one party, and $14.50 is the Medicare share of one party.
Reference: Internal Revenue Code Chapter 21 (FICA), 26 U.S.C. 3111 (employer share) and 3101 (employee share)
Under OAC 158:40-5-4(c), where must the pocket license issued by the Administrator be while the electrician is on the job?
Answer: On the electrician's person
Rule 158:40-5-4(c) says the pocket license must be on the electrician's person while on the job, and 158:40-11-2(a)(9) makes performing work without keeping the license on the person or in close proximity a prohibited act.
Reference: Oklahoma Administrative Code, Title 158, Chapter 40 (Electrical Industry Regulations), OAC 158:40-5-4(c)
An Oklahoma subcontractor furnished electrical labor and materials on a commercial building and was not paid by the general contractor. The subcontractor last worked on the job on March 1. Under 42 O.S. 143, within how many days must the subcontractor file its lien statement with the county clerk?
Answer: 90 days after the date labor or material was last furnished
Section 143 lets a subcontractor obtain a lien in the same manner as the original contractor by filing a verified statement with the county clerk of the county where the land lies within ninety (90) days after material was last furnished or labor last performed under the subcontract. March 1 plus 90 days is May 30. The one-year period applies to suing to enforce the lien (Section 172).
Reference: Oklahoma Statutes, Title 42 (Liens), Chapter 3 (Mechanics and Materialmen's Liens), 42 O.S. 143
A contractor's annual payroll is $400,000 for a class code with a manual rate of $4.50 per $100 of payroll. The contractor's experience modification rate is 1.10. What is the estimated annual workers' compensation premium?
Answer: $19,800
Manual premium = ($400,000 / 100) x $4.50 = 4,000 x $4.50 = $18,000. Modified premium = $18,000 x 1.10 = $19,800. $18,000 omits the experience modification, $16,364 divides by the mod (a mod above 1.00 raises premium), and $198,000 misplaces the decimal by dividing payroll by 10.
Reference: General business practice, Risk management: workers' compensation premium and experience modification
A schedule has these activities. A (3 days) must finish before B (5 days) and C (4 days) can start. Both B and C must finish before D (2 days) can start. What is the shortest total project duration, and which path is critical?
Answer: 10 days, along A, B and D
Path A-B-D = 3 + 5 + 2 = 10 days. Path A-C-D = 3 + 4 + 2 = 9 days. The longest path sets the duration, so the project takes 10 days and A-B-D is critical. Adding all four (14 days) wrongly treats B and C as sequential when they can run at the same time.
Reference: General business practice, Project management: critical path method
A crew uses a portable ladder to reach an upper roof level. How far must the side rails extend above the landing surface under OSHA's construction rule?
Answer: At least 3 feet
29 CFR 1926.1053(b)(1) requires the side rails of a portable ladder used to access an upper landing surface to extend at least 3 feet above that surface (or other secure grab devices provided). One foot or two feet would leave the worker without a safe handhold at the transition.
Reference: Code of Federal Regulations, Title 29, Part 1926 (Safety and Health Regulations for Construction), 29 CFR 1926.1053(b)(1)
Sources
- PSI: Oklahoma Construction Industries Board Candidate Information Bulletin (effective 9/11/2026) (opens in a new tab)
- Oklahoma Construction Industries Board (CIB) (opens in a new tab)
Questions last verified November 3, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.