Requirements at a glance
| Agency | NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors; exams by PSI |
|---|---|
| Exam | Heating Group 3 (forced air, 15 tons or less) contractor exam, 4 hours, open book (question count and pass score are not published) |
| Books allowed | 2018 NC Mechanical, Fuel Gas, Administrative, Energy and Residential Codes; ACCA Manuals J, D, N, Q and CS; Modern Refrigeration and Air Conditioning (22nd); duct calculator |
| Fees | $150 by examination: $75 Board application plus $75 nonrefundable PSI exam fee (valid one year), per 21 NCAC 50 .1101(c); then the annual license fee ($150 for contractors, .1102) |
Anyone qualifying a Heating Group 3 contractor license from the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors. Under G.S. 87-21(a)(4), Group 3 covers direct heating or cooling with a duct air distribution system and 15 tons or less of mechanical refrigeration; single-family residential systems fall here regardless of size.
Official links
- NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
- NC Board: exam information, book list and 2018 code notice (opens in a new tab)
- Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
- NC Office of State Fire Marshal: code book sales (opens in a new tab)
How to get licensed, step by step
Apply to the Board
Contact the Board (1109 Dresser Court, Raleigh; 919-875-3612) and submit the exam application for your license type.
NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
Wait for PSI's email
Once approved you get an email confirmation from PSI, then register and pay the $75 exam fee (the $75 application fee goes to the Board). After you pass, pay the license fee ($150 a year for contractors) within 45 days.
Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
Check your book list
Only the books for your exam category are allowed in the room. The Board's list is effective July 1, 2025; confirm it before you buy.
NC Board: exam information, book list and 2018 code notice (opens in a new tab)NC Office of State Fire Marshal: code book sales (opens in a new tab)
Take the exam and Business and Law
Business and Law is a separate Board exam unless you hold an active license and passed it after August 2003.
Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
How to prepare
- North Carolina's exams use the 2018 NC State Building Code (2015 ICC base text with NC amendments, effective 2019). The 2024 NC codes are delayed to no earlier than May 1, 2027, so use the 2018 books.
- Tab your books with permanent tabs before exam day. Highlighting is allowed; writing, sticky flags and loose papers are not.
- Practice Manual J and Manual D load and duct problems; bring your own duct calculator.
- Tab the NC Mechanical Code chapters on ducts, exhaust, chimneys and appliances and the Fuel Gas Code sizing tables.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 NC Mechanical Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 North Carolina State Building Code: Mechanical CodeEssential
Allowed in the exam room. The 2015 IMC with NC amendments; the core of the heating exams.
2018 North Carolina State Building Code: Fuel Gas Code
Allowed in the exam room. The 2015 IFGC with NC amendments; gas piping sizing and appliance installation.
ACCA Manual J (8th Ed., v2), Manual D (3rd Ed.), Manual N, Manual Q and Manual CS
Listed on the Board's heating book list by class. Load calculation and duct design.
Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
Allowed in the heating exam room. Refrigeration cycle, charging and system diagnosis.
Official reference list (as published by the testing agency)
- North Carolina State Building Code: Mechanical Code, 2018 (2015 IMC with NC amendments)
- North Carolina State Building Code: Fuel Gas Code, 2018 (2015 IFGC with NC amendments)
- North Carolina State Building Code: Administrative Code and Policies, 2018
- North Carolina State Building Code: Energy Conservation Code and Residential Code, 2018
- ACCA Manual J (8th Edition, Version 2), Manual D (3rd Edition), Manual N (5th Edition), Manual Q (1990) and Manual CS (1993), as listed for your class
- Modern Refrigeration and Air Conditioning (Goodheart-Willcox), 22nd Edition
- A duct calculator (bring your own)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 6 | |
| Ventilation, Exhaust and Combustion Air | 12 | |
| Duct Systems and Duct Design | 16 | |
| Heating and Cooling Load Calculations | 14 | |
| Chimneys, Vents and Appliance Installation | 14 | |
| Fuel Gas Piping and Appliances | 12 | |
| Hydronic Piping and Boilers | 6 | |
| Refrigeration and Air Conditioning | 12 | |
| Energy and Residential Code Requirements | 8 |
Exam day details
- Administered by PSI Services for the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors.
- Fee: $150 for a license by examination (21 NCAC 50 .1101(c)): $75 Board application fee plus $75 nonrefundable exam fee paid to PSI (valid one year). After you pass, pay the annual license fee ($150 for a contractor license, .1102).
- 4 hours, open book. The Board does not publish the number of questions, the pass score or a topic outline.
- The Board's book list is class-specific (Class I, Class II and technician); only the books for your category are allowed in the room. Confirm yours on the Board's site.
- Heating exams are based on the 2018 NC codes until the 2024 codes take effect (no earlier than May 1, 2027).
- Open book: bring your own reference books in original published condition (hard-, spiral- or ring-bound), only the books listed for your exam. Highlighting and permanent commercial tabs (ICC Turbo Tabs are the only loose inserts) are allowed; writing, underlining, notes and homemade tabs are not. Printed PDFs are not allowed.
- PSI provides pencils, scratch paper, calculators and the NC Heating and Plumbing Figures. Heating candidates bring their own duct calculator.
- You must apply to the Board first; PSI emails you after approval. A license by examination costs $150 ($75 application fee plus a $75 nonrefundable exam fee paid to PSI, valid one year); after you pass, the annual license fee ($150 for contractors) is due within 45 days.
- You cannot retest the same day. Unauthorized materials in the exam room mean a 90-day wait before you can reschedule.
- Business and Law is a separate exam, not required if you hold an active license and passed the Board's Business and Law exam after August 2003.
Note: The Board publishes exam durations and reference books for each exam but not the number of questions, a pass score or a topic outline. The question count, pass score and topic weights on this page are our practice estimates. The Board's note dated June 1, 2026 says exams stay on the 2018 NC codes (including NFPA 13 and 13D 2013 and NFPA 25 2011) until the 2024 codes take effect, no earlier than May 1, 2027.
Frequently asked questions
What does Heating Group 3 cover in North Carolina?
Forced-air heating or cooling of a building with duct distribution and 15 tons or less of mechanical refrigeration, plus all single-family residential systems regardless of size (G.S. 87-21(a)(4) and (a)(3)).
How many questions are on the NC Heating Group 3 exam?
The Board and PSI publish only the 4-hour time limit. This practice exam uses 80 questions as a working length.
What books do I need?
The 2018 NC Mechanical, Fuel Gas, Administrative, Energy and Residential Codes, the ACCA manuals on your class list, Modern Refrigeration and Air Conditioning (22nd) and a duct calculator.
Free questions with answers
Show all 10 free questions and answers
An outdoor combustion air opening needs 30 square inches of net free area. The installer will use a metal louver with a rating that is not marked and not otherwise known. What minimum gross louver area is needed?
Answer: 40 square inches
Section 304.10 says that when the free area of a louver or grille is unknown, metal louvers and grilles are assumed to have 75 percent free area and wood louvers 25 percent. Gross area = 30 / 0.75 = 40 in2. 120 in2 would be correct for a wood louver (30 / 0.25); 60 in2 uses 50 percent.
Reference: 2018 North Carolina Fuel Gas Code (2015 IFGC with NC amendments), Section 304.10
What marking must pressure-sensitive tape carry when it is used to seal a fibrous glass duct under the mechanical code?
Answer: 181 A-P
Section 603.9 requires tapes and mastics used on fibrous glass ductwork to be listed to UL 181A and marked 181 A-P for pressure-sensitive tape, 181 A-M for mastic and 181 A-H for heat-sensitive tape. 181 B-FX is the pressure-sensitive tape mark for metallic and flexible duct; 181 B-C is for fasteners on flexible nonmetallic duct.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 603.9
What is the closest to the earth that a duct may be installed unless it is approved for underground use under Section 603.8?
Answer: 4 inches
Section 603.14 prohibits installing ducts in or within 4 inches of the earth except where they comply with Section 603.8 (underground ducts). Section 603.8 requires underground metallic ducts without an approved protective coating to be encased in at least 2 inches of concrete, which is where the 2-inch distractor comes from.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Sections 603.14 and 603.8
What is the U-factor of a wall assembly whose total thermal resistance is R-20?
Answer: 0.05 Btu/h-ft2-F
U-factor is the reciprocal of total R-value: U = 1 / R = 1 / 20 = 0.05 Btu/h-ft2-F. 20 confuses the R-value with the U-factor; 0.50 and 0.20 misplace the decimal in the reciprocal (1/2 and 20/100).
Reference: ACCA Manual J, 8th Edition, Version 2, conduction heat transfer (Q = U x A x TD)
A mechanical draft venting system (not direct vent) will terminate through a side wall near a door. Which clearance meets Section 503.8?
Answer: At least 4 feet below, 4 feet horizontally from, or 1 foot above the door, with the bottom of the terminal at least 12 inches above the ground
For mechanical draft systems other than direct-vent, Section 503.8 requires terminals at least 4 feet below, 4 feet horizontally from, or 1 foot above any door, operable window or gravity air inlet, and the bottom of the vent terminal at least 12 inches above finished ground.
Reference: 2018 North Carolina Fuel Gas Code (2015 IFGC with NC amendments), Section 503.8
Natural gas piping (Schedule 40 metallic pipe, inlet pressure under 2 psi, 0.5 in. w.c. drop, 0.60 specific gravity) serves a 200,000 Btu/h furnace and an 80,000 Btu/h water heater. The longest length from the meter to the farthest appliance is 30 feet, and the gas has 1,000 Btu per cubic foot. Using the longest length method, what is the smallest nominal pipe size for the first (full-load) section?
Answer: 1 inch
Section 402.2: connected load = 200,000 + 80,000 = 280,000 Btu/h; 280,000 / 1,000 = 280 cfh. Section 402.4.1 uses the longest length (30 ft). Table 402.4(2), 30 ft: 3/4 inch = 199 cfh (too small), 1 inch = 374 cfh (adequate). 1 1/4 inch also works but is larger than needed.
Reference: 2018 North Carolina Fuel Gas Code (2015 IFGC with NC amendments), Sections 402.2, 402.4.1 and Table 402.4(2)
A duct run must pass through a nominal 2x10 floor joist (actual depth 9.25 inches). What is the maximum diameter of a bored hole in the joist under Section 302.3.1, and where must it be located?
Answer: About 3.08 inches, no closer than 2 inches to the top or bottom edge
Section 302.3.1 limits bored hole diameter to one-third of the joist depth: 9.25 / 3 = 3.08 in. The hole edges must be no closer than 2 inches to the top or bottom. 4.63 is half of the depth; 2.31 is one-fourth of the depth (the end-notch limit).
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 302.3.1
A combination water heater supplies both potable hot water and a space-heating loop that runs at 170F. Which device does Section 1002.2.2 require?
Answer: A temperature-actuated mixing valve conforming to ASSE 1017 limiting potable water to 140F or less
Section 1002.2.2 requires an ASSE 1017 temperature-actuated mixing valve to temper potable hot water to 140F or less where the space-heating water is hotter than 140F. Section 1002.2.1 also requires sizing so the space-heating load does not reduce potable capacity.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Sections 1002.2.1 and 1002.2.2
In a basic vapor-compression cycle, which two components separate the high-pressure side from the low-pressure side?
Answer: The compressor and the metering device
The compressor raises refrigerant to high pressure and the metering device (expansion valve or capillary) drops it to low pressure. The evaporator and accumulator are on the low side; the condenser, receiver and drier are on the high side.
Reference: Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox), Refrigeration cycle: pressure sides of the system
Under the NC Residential Code N1103.3.1 amendment, what is the minimum insulation for supply and return ducts in unconditioned space?
Answer: R-8
The NC amendment to N1103.3.1 (R403.3.1) requires supply and return ducts in unconditioned space and outdoors to be at least R-8. Supply ducts in semi-conditioned space need R-4; ducts in conditioned space need no insulation beyond what is needed to prevent condensation. The base R-6 rule for non-attic ducts was replaced.
Reference: 2018 North Carolina Residential Code, Section N1103.3.1 (NC amendment)
Sources
- PSI: NC Plumbing, Heating and Fire Sprinkler Contractors Candidate Information Bulletin (updated 8/25/2026) (opens in a new tab)
- NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
- NC Board: 2024 code delay notice and exam book reference list (opens in a new tab)
- NC Office of State Fire Marshal: code book sales (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.