North Carolina licensing exam

North Carolina Heating Group 1 (Hydronic and Steam) Contractor Exam: Practice Test & Licensing Guide

The PSI exam for North Carolina Heating Group 1 (Class I and II) contractor licenses: steam, vapor and hot-water (hydronic) comfort heating. A 4-hour open-book exam on the 2018 NC Mechanical and Fuel Gas Codes, boilers and hydronic piping.

Questions
Not published by North Carolina
Time limit
4 hours
Passing score
Not published by North Carolina

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Boilers, Water Heaters and Pressure Vessels

Under the NC Mechanical Code, what is the minimum unobstructed width of the passageways around all sides of a boiler, unless a lesser width is otherwise approved?

Requirements at a glance

AgencyNC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors; exams by PSI
ExamHeating Group 1 (steam, vapor and hot-water) contractor exam, 4 hours, open book (question count and pass score are not published)
Books allowed2018 NC Mechanical, Fuel Gas, Administrative, Energy and Residential Codes and the other books on the Board's Group 1 list
Fees$150 by examination: $75 Board application plus $75 nonrefundable PSI exam fee (valid one year), per 21 NCAC 50 .1101(c); then the annual license fee ($150 for contractors, .1102)

Anyone qualifying a Heating Group 1 contractor license from the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors. Under G.S. 87-21(a)(2), Group 1 covers heating systems that use high or low pressure steam, vapor or hot water, with their piping, ducts and equipment, for comfort heating. Forced-air systems are Group 2 or 3.

How to get licensed, step by step

  1. Apply to the Board

    Contact the Board (1109 Dresser Court, Raleigh; 919-875-3612) and submit the exam application for your license type.

    NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)

  2. Wait for PSI's email

    Once approved you get an email confirmation from PSI, then register and pay the $75 exam fee (the $75 application fee goes to the Board). After you pass, pay the license fee ($150 a year for contractors) within 45 days.

    Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)

  3. Check your book list

    Only the books for your exam category are allowed in the room. The Board's list is effective July 1, 2025; confirm it before you buy.

    NC Board: exam information, book list and 2018 code notice (opens in a new tab)NC Office of State Fire Marshal: code book sales (opens in a new tab)

  4. Take the exam and Business and Law

    Business and Law is a separate Board exam unless you hold an active license and passed it after August 2003.

    Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)

How to prepare

  • North Carolina's exams use the 2018 NC State Building Code (2015 ICC base text with NC amendments, effective 2019). The 2024 NC codes are delayed to no earlier than May 1, 2027, so use the 2018 books.
  • Tab your books with permanent tabs before exam day. Highlighting is allowed; writing, sticky flags and loose papers are not.
  • Group 1 is hydronic and steam comfort heating (G.S. 87-21(a)(2)); forced-air work is Group 2 or 3.
  • Tab Mechanical Code Chapter 10 (boilers) and Chapter 12 (hydronic piping) and the Fuel Gas Code sizing tables.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 NC Mechanical Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

Official reference list (as published by the testing agency)
  • North Carolina State Building Code: Mechanical Code, 2018 (2015 IMC with NC amendments), including Chapter 10 Boilers and Chapter 12 Hydronic Piping
  • North Carolina State Building Code: Fuel Gas Code, 2018 (2015 IFGC with NC amendments)
  • North Carolina State Building Code: Administrative Code and Policies, 2018
  • North Carolina State Building Code: Energy Conservation Code and Residential Code, 2018
  • Other books on the Board's Group 1 list (ACCA manuals and others); confirm the list for your class

What's on the exam

Estimated topic weighting. No official breakdown is published:

TopicQuestions
Administration and General Regulations8
Boilers, Water Heaters and Pressure Vessels16
Steam and Hot-Water Piping Systems18
Hydronic Controls, Expansion Tanks and Venting12
Fuel Gas Piping and Appliances14
Combustion Air, Chimneys and Vents14
Heating Load Calculations and Terminal Units10
Energy and Residential Code Requirements8

Exam day details

  • Administered by PSI Services for the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors.
  • Fee: $150 for a license by examination (21 NCAC 50 .1101(c)): $75 Board application fee plus $75 nonrefundable exam fee paid to PSI (valid one year). After you pass, pay the annual license fee ($150 for a contractor license, .1102).
  • 4 hours, open book. The Board does not publish the number of questions, the pass score or a topic outline.
  • The Board's book list is class-specific (Class I, Class II and technician); only the books for your category are allowed in the room. Confirm yours on the Board's site.
  • Heating exams are based on the 2018 NC codes until the 2024 codes take effect (no earlier than May 1, 2027).
  • Open book: bring your own reference books in original published condition (hard-, spiral- or ring-bound), only the books listed for your exam. Highlighting and permanent commercial tabs (ICC Turbo Tabs are the only loose inserts) are allowed; writing, underlining, notes and homemade tabs are not. Printed PDFs are not allowed.
  • PSI provides pencils, scratch paper, calculators and the NC Heating and Plumbing Figures. Heating candidates bring their own duct calculator.
  • You must apply to the Board first; PSI emails you after approval. A license by examination costs $150 ($75 application fee plus a $75 nonrefundable exam fee paid to PSI, valid one year); after you pass, the annual license fee ($150 for contractors) is due within 45 days.
  • You cannot retest the same day. Unauthorized materials in the exam room mean a 90-day wait before you can reschedule.
  • Business and Law is a separate exam, not required if you hold an active license and passed the Board's Business and Law exam after August 2003.

Note: The Board publishes exam durations and reference books for each exam but not the number of questions, a pass score or a topic outline. The question count, pass score and topic weights on this page are our practice estimates. The Board's note dated June 1, 2026 says exams stay on the 2018 NC codes (including NFPA 13 and 13D 2013 and NFPA 25 2011) until the 2024 codes take effect, no earlier than May 1, 2027.

Frequently asked questions

What does Heating Group 1 cover in North Carolina?

G.S. 87-21(a)(2) defines Group 1 as a building heating system using high or low pressure steam, vapor or hot water, including the piping, ducts and equipment connected with it, for comfort heating.

How many questions are on the NC Heating Group 1 exam?

The Board and PSI publish only the 4-hour time limit. This practice exam uses 80 questions as a working length.

Where do forced-air systems go?

Forced-air systems of 15 tons or less (and all single-family systems) are Heating Group 3; forced-air systems over 15 tons are Group 2.

Free questions with answers

Show all 10 free questions and answers
  1. Under the NC Mechanical Code, what is the minimum unobstructed width of the passageways around all sides of a boiler, unless a lesser width is otherwise approved?

    Answer: 18 inches

    Section 1004.3 requires clearance around boilers for inspection, servicing and gauge visibility, with passageways on all sides not less than 18 inches wide unless otherwise approved. The 30-inch figure is the level working space in front of a controls side (Section 306.1), and 36 inches is the passageway width for a door into an appliance room (306.2), not the boiler passageway.

    Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 1004.3 Working Clearance

  2. To what standard must a packaged electric boiler be listed and labeled under the NC Mechanical Code?

    Answer: UL 834

    Section 1004.1 lists packaged electric boilers to UL 834, packaged oil-fired boilers to UL 726 and solid-fuel-fired boilers to UL 2523. UL 795 appears in the Fuel Gas Code for gas-fired boilers.

    Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 1004.1 Standards

  3. A closed hydronic loop with a plain steel (nondiaphragm) expansion tank has a system volume of 100 gallons (not counting the tank) and an average operating temperature of 180 degrees F. In absolute pressures, atmospheric pressure is 14.7 psia, fill pressure is 26.7 psia (12 psig) and maximum operating pressure is 44.7 psia (30 psig). Using Vt = [(0.00041T - 0.0466)Vs] / [(Pa/Pf) - (Pa/Po)], what is the minimum tank volume?

    Answer: 12.3 gallons

    Numerator: (0.00041 x 180 - 0.0466) x 100 = (0.0738 - 0.0466) x 100 = 2.72. Denominator, using absolute pressures: (14.7/26.7) - (14.7/44.7) = 0.5506 - 0.3289 = 0.2217. Vt = 2.72 / 0.2217 = 12.3 gallons. Plugging the gauge values 12 and 30 gives 3.7 gallons, stopping at the numerator gives 2.7, and adding the two ratios gives 3.1. The same equation appears in IMC Section 1009.2 and 13 NCAC 13 .0412(d); it is the plain-steel tank formula and works with absolute pressures (check: 40 gal at 195 F, 12/30 psig gives 6.0 gal, the nonpressurized column of IRC Table M2003.2).

    Reference: 13 NCAC 13 .0412 and 2018 NC Mechanical Code, 13 NCAC 13 .0412(d) Expansion Tanks; IMC Section 1009.2

  4. A hydronic heating system has a maximum design pressure of 60 psi. Under Section 1208.1 of the NC Mechanical Code, what minimum hydrostatic test pressure applies?

    Answer: 100 psi, held for at least 15 minutes

    The test pressure is 1.5 times the maximum design pressure: 1.5 x 60 = 90 psi, but Section 1208.1 sets a floor of 100 psi, so 100 psi governs. The duration is not less than 15 minutes. The 90 psi answer forgets the 100 psi minimum.

    Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 1208.1 General

  5. Under the NC Residential Code, for how long must a hydronic piping system be held at the hydrostatic test pressure?

    Answer: Not less than 15 minutes and not more than 20 minutes

    Residential Code Section M2101.10 requires a hydrostatic test at 1.5 times the maximum system design pressure, not less than 100 psi, held not less than 15 minutes and not more than 20 minutes. The Mechanical Code (Section 1208.1) states only the 15-minute minimum.

    Reference: 2018 North Carolina Residential Code (2015 IRC with NC amendments), Section M2101.10 Tests

  6. What is the minimum burial depth for underground gas piping, and for an individual line to an outdoor grill or light, if approved and protected from damage?

    Answer: 12 inches generally, and 8 inches for individual outdoor appliance lines

    Section 404.12 requires underground piping to be a minimum of 12 inches below grade, and Section 404.12.1 allows individual lines to outdoor lights, grills and similar appliances at not less than 8 inches where approved and not susceptible to damage.

    Reference: 2018 North Carolina Fuel Gas Code (2015 IFGC with NC amendments), Sections 404.12 and 404.12.1 Minimum Burial Depth

  7. The same 200,000 Btu/h equipment room uses two outdoor openings, but both communicate with the outdoors through horizontal ducts. What minimum free area does each opening need under Section 304.6.1?

    Answer: 100 square inches

    Where openings communicate with the outdoors through horizontal ducts, each needs at least 1 square inch per 2,000 Btu/h: 200,000 / 2,000 = 100 square inches. The 50 square inch answer is the direct-opening (1 per 4,000) rate.

    Reference: 2018 North Carolina Fuel Gas Code (2015 IFGC with NC amendments), Section 304.6.1 Two-Permanent-Openings Method

  8. A hot-water baseboard loop flows 8 gpm with a 20 degree F temperature drop across the terminal units. How much heat does the water deliver, using Q = 500 x gpm x delta T?

    Answer: 80,000 Btu/h

    The factor 500 comes from 8.33 lb/gal x 60 min/h x 1 Btu/lb-F (about 500). Q = 500 x 8 gpm x 20 F = 80,000 Btu/h. 160,000 doubles the result, 8,000 is off by a factor of ten, and 3,200 uses 20 in place of the 500 factor.

    Reference: Standard hydronic heating relationships (Q = 500 x gpm x delta T for water), Q = 500 x gpm x delta T

  9. Under G.S. 87-21(c), which of the following work is within the licensing Article rather than a minor repair or replacement?

    Answer: Installation or replacement of a boiler

    G.S. 87-21(c) applies to the installation or replacement of condensing units, air handlers, gas furnaces, package units, boilers, water heaters and heat exchangers. It excludes minor repairs or replacement of parts such as a compressor, coil, contactor, motor or capacitor that do not change the energy source, fuel type, or routing or sizing of venting or piping.

    Reference: N.C. General Statutes Chapter 87, Article 2, G.S. 87-21(c) To Whom Article Applies

  10. Under NC 2018 Energy Conservation Code Section R401.2 (NC amendment), which statement about showing residential compliance with REScheck is correct?

    Answer: Envelope requirements may not be traded off against high-efficiency heating or cooling equipment

    The NC version of R401.2 lists four compliance paths: Sections R401 through R404; Section R405 with the Mandatory provisions; the ERI approach in R406; and REScheck keyed to the 2018 IECC. The REScheck item states that envelope requirements may not be traded off against the use of high-efficiency heating or cooling equipment, so a high-efficiency boiler does not buy reduced insulation.

    Reference: 2018 North Carolina Energy Conservation Code, Section R401.2 Compliance (NC amendment)

Sources

Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.