Requirements at a glance
| Agency | NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors; exams by PSI |
|---|---|
| Exam | Heating Group 2 (forced air, over 15 tons) contractor exam, 4 hours, open book (question count and pass score are not published) |
| Books allowed | 2018 NC Mechanical, Fuel Gas, Administrative and Energy Codes and the ACCA and refrigeration books on the Board's Group 2 list; duct calculator |
| Fees | $150 by examination: $75 Board application plus $75 nonrefundable PSI exam fee (valid one year), per 21 NCAC 50 .1101(c); then the annual license fee ($150 for contractors, .1102) |
Anyone qualifying a Heating Group 2 contractor license from the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors. Under G.S. 87-21(a)(3), Group 2 is an air-circulating heating or cooling system with more than 15 tons of mechanical refrigeration; systems in single-family residences belong to Group 3 regardless of size.
Official links
- NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
- NC Board: exam information, book list and 2018 code notice (opens in a new tab)
- Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
- NC Office of State Fire Marshal: code book sales (opens in a new tab)
How to get licensed, step by step
Apply to the Board
Contact the Board (1109 Dresser Court, Raleigh; 919-875-3612) and submit the exam application for your license type.
NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
Wait for PSI's email
Once approved you get an email confirmation from PSI, then register and pay the $75 exam fee (the $75 application fee goes to the Board). After you pass, pay the license fee ($150 a year for contractors) within 45 days.
Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
Check your book list
Only the books for your exam category are allowed in the room. The Board's list is effective July 1, 2025; confirm it before you buy.
NC Board: exam information, book list and 2018 code notice (opens in a new tab)NC Office of State Fire Marshal: code book sales (opens in a new tab)
Take the exam and Business and Law
Business and Law is a separate Board exam unless you hold an active license and passed it after August 2003.
Schedule with PSI (NC plumbing, heating and fire sprinkler) (opens in a new tab)
How to prepare
- North Carolina's exams use the 2018 NC State Building Code (2015 ICC base text with NC amendments, effective 2019). The 2024 NC codes are delayed to no earlier than May 1, 2027, so use the 2018 books.
- Tab your books with permanent tabs before exam day. Highlighting is allowed; writing, sticky flags and loose papers are not.
- Group 2 is air systems over 15 tons (G.S. 87-21(a)(3)); expect commercial ventilation, load and refrigeration questions.
- Tab the NC Mechanical Code ventilation, duct and refrigeration chapters and the Energy Code commercial provisions.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 NC Mechanical Code. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 North Carolina State Building Code: Mechanical CodeEssential
Allowed in the exam room. The 2015 IMC with NC amendments; the core of the heating exams.
2018 North Carolina State Building Code: Fuel Gas Code
Allowed in the exam room. The 2015 IFGC with NC amendments; gas piping sizing and appliance installation.
ACCA Manual J (8th Ed., v2), Manual D (3rd Ed.), Manual N, Manual Q and Manual CS
Listed on the Board's heating book list by class. Load calculation and duct design.
Modern Refrigeration and Air Conditioning, 22nd Edition (Goodheart-Willcox)
Allowed in the heating exam room. Refrigeration cycle, charging and system diagnosis.
Official reference list (as published by the testing agency)
- North Carolina State Building Code: Mechanical Code, 2018 (2015 IMC with NC amendments)
- North Carolina State Building Code: Fuel Gas Code, 2018 (2015 IFGC with NC amendments)
- North Carolina State Building Code: Administrative Code and Policies, 2018
- North Carolina State Building Code: Energy Conservation Code, 2018
- ACCA manuals and Modern Refrigeration and Air Conditioning (Goodheart-Willcox), 22nd Edition, as listed for your class
- A duct calculator (bring your own)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 6 | |
| Ventilation, Exhaust and Combustion Air | 14 | |
| Duct Systems and Air Distribution | 14 | |
| Heating and Cooling Load Calculations | 14 | |
| Chimneys, Vents and Appliance Installation | 10 | |
| Fuel Gas Piping and Appliances | 8 | |
| Hydronic Piping and Boilers | 8 | |
| Refrigeration Systems and Equipment | 18 | |
| Energy Code Requirements | 8 |
Exam day details
- Administered by PSI Services for the NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors.
- Fee: $150 for a license by examination (21 NCAC 50 .1101(c)): $75 Board application fee plus $75 nonrefundable exam fee paid to PSI (valid one year). After you pass, pay the annual license fee ($150 for a contractor license, .1102).
- 4 hours, open book. The Board does not publish the number of questions, the pass score or a topic outline.
- The Board's book list is class-specific (Class I, Class II and technician); only the books for your category are allowed in the room. Confirm yours on the Board's site.
- Heating exams are based on the 2018 NC codes until the 2024 codes take effect (no earlier than May 1, 2027).
- Open book: bring your own reference books in original published condition (hard-, spiral- or ring-bound), only the books listed for your exam. Highlighting and permanent commercial tabs (ICC Turbo Tabs are the only loose inserts) are allowed; writing, underlining, notes and homemade tabs are not. Printed PDFs are not allowed.
- PSI provides pencils, scratch paper, calculators and the NC Heating and Plumbing Figures. Heating candidates bring their own duct calculator.
- You must apply to the Board first; PSI emails you after approval. A license by examination costs $150 ($75 application fee plus a $75 nonrefundable exam fee paid to PSI, valid one year); after you pass, the annual license fee ($150 for contractors) is due within 45 days.
- You cannot retest the same day. Unauthorized materials in the exam room mean a 90-day wait before you can reschedule.
- Business and Law is a separate exam, not required if you hold an active license and passed the Board's Business and Law exam after August 2003.
Note: The Board publishes exam durations and reference books for each exam but not the number of questions, a pass score or a topic outline. The question count, pass score and topic weights on this page are our practice estimates. The Board's note dated June 1, 2026 says exams stay on the 2018 NC codes (including NFPA 13 and 13D 2013 and NFPA 25 2011) until the 2024 codes take effect, no earlier than May 1, 2027.
Frequently asked questions
What does Heating Group 2 cover in North Carolina?
An integral heating or cooling system that circulates air and has more than 15 tons of mechanical refrigeration (G.S. 87-21(a)(3)). Single-family residential systems are Group 3 regardless of size.
How many questions are on the NC Heating Group 2 exam?
The Board and PSI publish only the 4-hour time limit. This practice exam uses 80 questions as a working length.
What books do I need?
Only the books on the Board's list for your class; confirm it on the Board's site before you buy.
Free questions with answers
Show all 10 free questions and answers
A rooftop unit's outdoor air intake is being located near a loading dock on a commercial building. What is the minimum horizontal distance required between the intake opening and the loading dock?
Answer: 10 feet
Section 401.4, Item 2 requires mechanical and gravity outdoor air intake openings to be at least 10 feet horizontally from hazardous or noxious contaminant sources such as vents, streets, alleys, parking lots and loading docks. The 3-foot figure is the vertical separation below a contaminant source within 10 feet (Item 3), not the horizontal distance.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 401.4
A commercial supply duct system has a design operating pressure of 2.7 inches of water column. Based on the classifications in Section 603.3, what is the lowest pressure class that can be used for the ducts?
Answer: 3 inches w.c.
Section 603.3 lists duct pressure classes of 0.5, 1, 2, 3, 4, 6 and 10 inches w.c., and the classification must equal or exceed the design pressure of the system. The lowest class at or above 2.7 inches is 3 inches. A 2-inch class is below the design pressure; 4 and 6 are allowed but not the lowest.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 603.3
Section 1101.6 says refrigeration systems must comply with the mechanical code and, except as modified by it, with which standard?
Answer: ASHRAE 15
Section 1101.6 requires refrigeration systems to comply with Chapter 11 and, except as modified by the code, ASHRAE 15 (the safety standard for refrigeration systems). Ammonia systems must also comply with IIAR 2. ASHRAE 62.1 covers ventilation and ASHRAE 90.1 covers energy; NFPA 54 is the fuel gas code.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 1101.6
A 400 square foot machinery room is normally occupied by three people. Using only the airflow criterion based on room area or occupants in Section 1105.6.3.1, what is the minimum normal ventilation exhaust rate?
Answer: 200 cfm
Section 1105.6.3.1, Item 1 requires not less than 0.5 cfm per square foot of machinery room area or 20 cfm per person: 400 x 0.5 = 200 cfm, versus 3 x 20 = 60 cfm. The larger value governs, so 200 cfm. (Item 2 separately requires enough airflow to limit the room temperature rise to 18 degrees F; the larger of the two items governs.) 260 cfm adds the two rates.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 1105.6.3.1
A roof assembly has an outside air film of R-0.17, roofing of R-0.44, rigid insulation of R-20, a metal deck of R-0.06 and an inside air film of R-0.61. What is the total R-value and the U-factor of the assembly?
Answer: R-21.28 and U = 0.047
Series resistances add: 0.17 + 0.44 + 20 + 0.06 + 0.61 = 21.28. U = 1 / R = 1 / 21.28 = 0.047 Btu/h-ft2-F. R-20 counts the insulation alone; U = 21.28 forgets to invert; R-1.28 leaves out the insulation.
Reference: ACCA Manual J, 8th Edition, Version 2, series thermal resistance (U = 1 / total R)
A Type B gas vent serves a draft-hood-equipped unit heater in a warehouse. How far above the draft hood must the vent terminate in vertical height?
Answer: Not less than 5 feet above the highest connected draft hood or flue collar
Section 503.6.5 requires a Type B or L gas vent to terminate at least 5 feet in vertical height above the highest connected appliance draft hood or flue collar. The 12-foot figure applies to Type B-W vents serving wall furnaces, measured from the bottom of the furnace.
Reference: 2018 North Carolina Fuel Gas Code (2015 IFGC with NC amendments), Section 503.6.5
Which test medium is permitted for the pressure test of fuel gas piping under Section 406.2?
Answer: Air, nitrogen, carbon dioxide or another inert gas
Section 406.2 allows air, nitrogen, carbon dioxide or an inert gas as the test medium and prohibits oxygen. Testing with fuel gas from the supply is not listed. Note that the refrigeration chapter of the mechanical code (Section 1108.2) is stricter and does not allow air.
Reference: 2018 North Carolina Fuel Gas Code (2015 IFGC with NC amendments), Section 406.2
A new commercial boiler has a fuel input of 15,000,000 Btu/h. Which standard must its controls and safety devices meet under Section 1004.1?
Answer: NFPA 85, because the input exceeds 12,500,000 Btu/h
Section 1004.1 requires controls and safety devices for boilers with fuel input of 12,500,000 Btu/h or less to meet ASME CSD-1, and for boilers with input greater than 12,500,000 Btu/h to meet NFPA 85. At 15,000,000 Btu/h, NFPA 85 applies. UL 726 is the listing standard for packaged oil-fired boilers.
Reference: 2018 North Carolina Mechanical Code (2015 IMC with NC amendments), Section 1004.1
A mechanical permit was issued for a chiller replacement, and work started in February. Work then stopped and did not resume for 13 months. What is the status of the permit under Section 204.3.2?
Answer: It has expired, and a new permit is needed before more work
Section 204.3.2 states that if work is discontinued for a period of 12 months after commencement, the permit immediately expires, and no work authorized by an expired permit may be performed until a new permit has been issued. (A permit also expires 6 months after issuance, or any shorter local period, if the work has not commenced.)
Reference: 2018 North Carolina Administrative Code and Policies (NC amendments), Section 204.3.2
A supply duct is installed outdoors on a commercial rooftop in Climate Zone 4. What minimum insulation does NC Section C403.2.9 require?
Answer: R-8
Section C403.2.9 (NC amendment 221213 Item A-8) requires supply and return ducts located outdoors to have at least R-8 insulation in Climate Zones 3 and 4 and at least R-12 in Climate Zone 5. R-6 is the requirement for unconditioned spaces inside the building, and R-12 applies only in Zone 5. (The temporary R-4/R-6 rule under Session Law 2022-46 expired March 17, 2024.)
Reference: 2018 North Carolina Energy Conservation Code (2015 IECC with NC amendments), Section C403.2.9
Sources
- PSI: NC Plumbing, Heating and Fire Sprinkler Contractors Candidate Information Bulletin (updated 8/25/2026) (opens in a new tab)
- NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors (opens in a new tab)
- NC Board: 2024 code delay notice and exam book reference list (opens in a new tab)
- NC Office of State Fire Marshal: code book sales (opens in a new tab)
Questions last verified November 14, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.