National certification

Wastewater Collection Operator Class I Exam (WPI/ABC): Practice Test & Licensing Guide

The WPI (formerly ABC) standardized Wastewater Collection Operator Class I exam: 100 questions on sewer equipment, system maintenance, lift stations and safety.

Questions
100
Time limit
Not officially released
Passing score
70%
Books
Closed book
What to study ↓

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Equipment Operation, Evaluation and Maintenance

When a four-gas meter is used for pre-entry testing of a permit space, why is oxygen tested before combustible gases?

Requirements at a glance

ExamWastewater Collection Class I: 100 scored questions, closed book, formula sheet provided
Colorado equivalentCollection Class 1
Passing scoreSet by your state; 70 in Colorado and most WPI states
Colorado fees$50 CDPHE application + $104 PSI exam

Entry-level sewer collection system operators in states that use WPI exams, including Colorado Collection Class 1 and Idaho Wastewater Collection Class I.

How to get certified, step by step

  1. Meet your state's eligibility rules

    Most states need a high school diploma or GED and some experience. In Colorado: the free regulatory course for your certificate type, plus one month of supervised experience for Class D or 1.

    CDPHE: which certificate is right for you (opens in a new tab)

  2. Apply to your certifying agency

    Apply to your state program (in Colorado, CDPHE's Certified Water Professionals program). Once approved, you get instructions to schedule with PSI.

    CDPHE: steps to becoming certified (Colorado) (opens in a new tab)

  3. Take the exam

    At a PSI test center or by remote proctoring. WPI's formula/conversion sheet is provided; bring a basic calculator.

  4. Get certified

    Your state issues the certificate after you pass. Higher classes need more experience and the next exam level.

How to prepare

  • Learn the formula sheet before exam day: know which formula each problem needs and practice unit conversions (gallons, cubic feet, pounds, psi, feet of head).
  • Expect confined-space entry, trench safety and traffic control questions in the safety section.
  • Know sewer cleaning methods, inflow and infiltration, lift station pumps and wet wells.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

What to study

This is a closed-book exam, so nothing comes into the exam room. Study from these:

Official reference list (as published by the testing agency)
  • WPI formula/conversion sheet (provided at the exam)
  • 40 CFR Parts 141 and 143 (Safe Drinking Water Act rules) and 40 CFR Part 503 (biosolids)
  • 29 CFR 1910 and 1926 (OSHA safety)

What's on the exam

Official content outline from Water Professionals International (WPI, formerly ABC); delivered by PSI (number of questions per topic):

TopicQuestions
Equipment Operation, Evaluation and Maintenance27
Collection System Operation, Maintenance and Restoration27
Lift Station Operation and Maintenance18
Collection System Monitoring, Evaluation and Adjustment14
Security, Safety and Administrative Procedures14

Exam day details

  • Administered by Water Professionals International (WPI, formerly ABC); delivered by PSI for most states.
  • Fee: Set by your state. In Colorado: $104 to PSI plus a $50 CDPHE application fee.
  • 100 scored questions, about 10 of them calculations.
  • Up to 10 extra unscored pretest questions are mixed in.
  • Passing is set by your state; Colorado and most WPI states use 70. WPI's 2025 exams are reported as scaled scores.
  • WPI's formula/conversion sheet is provided; bring a basic non-programmable calculator.
  • Time is set by the state and PSI (typically 3 hours for a 100-question exam); PSI confirms it when you schedule.
  • Colorado: Class D/1 = WPI Class I up to Class A/4 = Class IV. You need a high school diploma or GED and Colorado's free regulatory course.

Frequently asked questions

Which Colorado certificate uses the Collection Class I exam?

Colorado Wastewater Collection Class 1. Classes 2 to 4 use WPI Class II to IV.

What's on the Wastewater Collection Class I exam?

Equipment (27) and collection system maintenance and repair (27) are over half, then lift stations (18), monitoring and evaluation (14) and safety and administration (14), including confined-space and trench safety.

Does Idaho use this exam?

Idaho operators are licensed by DOPL's Board of Drinking Water and Wastewater Professionals in Classes I to IV, and Idaho's operator exams are ABC (now WPI) exams. Idaho's Class I matches WPI Class I. Check with DOPL for the current application and exam steps.

Free questions with answers

Show all 10 free questions and answers
  1. When a four-gas meter is used for pre-entry testing of a permit space, why is oxygen tested before combustible gases?

    Answer: Most combustible gas sensors need enough oxygen to read reliably

    29 CFR 1910.146(d)(5)(iii) sets the order: oxygen first, then combustible gases and vapors, then toxic gases. Appendix B explains why: most combustible gas meters depend on oxygen and won't read reliably in an oxygen-deficient atmosphere. A low-oxygen space can therefore show a falsely low LEL reading. The order has nothing to do with sensor warm-up or alphabetical logging.

    Reference: 29 CFR 1910.146 (Permit-Required Confined Spaces), 29 CFR 1910.146(d)(5)(iii) and Appendix B, Order of testing

  2. A lift station pump is running noisily and sounds like marbles or gravel are rattling in the volute. What is the most likely cause?

    Answer: Cavitation

    The Kentucky manual notes that cavitation can make a pump run noisily or sound like a marble is trapped in the volute. Cavitation happens when vapor bubbles form at low pressure on the suction side and then collapse violently, which pits the impeller. A slipping belt squeals instead, and low voltage or an open check valve does not cause this crackling sound.

    Reference: Kentucky DEP Wastewater Collection System Operator Certification Manual (2015), Chapter 6: Pumps, Maintenance of Pumps and Motors

  3. A 15-hp lift station pump motor runs 10 hours per day. Electricity costs $0.12 per kWh. Assuming the motor draws its full rated power, what is the daily power cost?

    Answer: $13.43

    Convert horsepower to kilowatts with 1 hp = 0.746 kW: 15 hp x 0.746 = 11.19 kW. Energy per day = 11.19 kW x 10 hr = 111.9 kWh. Cost = 111.9 kWh x $0.12 = $13.43 per day. $18.00 skips the kW conversion, $24.13 divides by 0.746 instead of multiplying, and $32.23 uses 24 hours instead of the 10 hours the pump actually runs.

    Reference: WPI Formula/Conversion Table, Wastewater Treatment, Collection, Industrial Waste & Laboratory (2023), Conversion Factors: 1 horsepower = 0.746 kW

  4. What must be done to a sewer line before it is televised with a CCTV camera?

    Answer: It must be cleaned

    Both the Kentucky and New Mexico manuals say lines must be cleaned before televising. Grease, roots and debris hide defects and can block the camera. Some flow is normal during televising, though inspection is best done at low flow so the camera isn't submerged. Pressure testing and root treatment are separate activities.

    Reference: Kentucky DEP Wastewater Collection System Operator Certification Manual (2015), Chapter 7: Inflow and Infiltration, Cleaning and Televising the Lines

  5. CCTV shows a sewer reach that is structurally sound but has groundwater leaking in at several joints. Which repair method is usually the most cost-effective choice?

    Answer: Chemical grouting

    The manual describes this as Case 1, a leaking problem in a structurally sound pipe, and says chemical grouting is the only cost-effective solution. Grout is injected through the joint to seal the surrounding soil, which stops infiltration without reducing pipe capacity. Bursting, sliplining and replacement are meant for structural defects and would cost far more than needed here.

    Reference: Kentucky DEP Wastewater Collection System Operator Certification Manual (2015), Chapter 11: Operations and Rehabilitation, Rehabilitation (Case 1: Leaking problem)

  6. According to EPA data on sanitary sewer overflows (SSOs), what is the most common cause?

    Answer: Blockages

    Table 9-1 in the Kentucky manual lists EPA's five broad causes of SSO events. Blockages lead at about 48 percent, then wet weather and I/I at 26 percent, power and mechanical failures at 11 percent, line breaks at 10 percent and miscellaneous causes such as vandalism at 5 percent. This is why routine cleaning and FOG control are central to SSO prevention.

    Reference: Kentucky DEP Wastewater Collection System Operator Certification Manual (2015), Chapter 9: Sewer Use Ordinances, Combined and Sanitary Sewer Systems, Table 9-1

  7. In a duplex lift station with automatic alternation, the hour meter on Pump 1 shows far more run time than Pump 2 over the same month. What does this suggest?

    Answer: A problem such as a leaking check valve

    With automatic alternation, the two pumps should log about the same hours. The New Mexico manual says that if one runs much more than the other, something is wrong, and gives a leaking check valve as an example: force-main water drains back and must be re-pumped, or the weaker pump runs longer each cycle. The Kentucky manual likewise calls for impeller inspection when motor hours differ by more than 10 percent.

    Reference: New Mexico Wastewater Systems Operator Certification Study Manual, Chapter 4: Wastewater Collection Systems, Hours Recorders

  8. A circular wet well is 8 ft in diameter. With the influent blocked off, one pump lowers the level 2.0 ft in 4 minutes. What is the pumping rate?

    Answer: 188 gpm

    Volume pumped = 0.785 x D² x depth = 0.785 x 8 ft x 8 ft x 2.0 ft = 100.5 ft³. Convert: 100.5 ft³ x 7.48 gal/ft³ = 751.6 gal. Rate = 751.6 gal / 4 min = 188 gpm. 752 gpm forgets to divide by time, 25 gpm leaves the volume in cubic feet, and 23 gpm uses D instead of D². Drawdown tests like this are the standard field check of pump capacity.

    Reference: WPI Formula/Conversion Table, Wastewater Treatment, Collection, Industrial Waste & Laboratory (2023), Volume of Cylinder = (0.785)(Diameter²)(Height); 1 ft³ = 7.48 gal

  9. On a graph of sewer flow plotted over rainfall, what pattern indicates infiltration rather than inflow?

    Answer: A lagging rise that keeps going steadily after the rain ends

    The Kentucky manual says inflow shows up as higher flows starting soon after the rain begins and dropping off soon after it stops. Infiltration may not appear right away, but continues steadily after the rain until the ground around the sewer drains. Basins dominated by inflow are followed up with smoke and dye testing; infiltration basins with visual inspection, joint testing and CCTV.

    Reference: Kentucky DEP Wastewater Collection System Operator Certification Manual (2015), Chapter 7: Inflow and Infiltration, Flow Monitoring

  10. A sewer manhole is part of a continuous system and can't be isolated from upstream flow. What does OSHA require for atmospheric testing during entry?

    Answer: Pre-entry testing as feasible, then continuous monitoring

    29 CFR 1910.146(d)(5)(i) says that where isolation is infeasible because the space is large or part of a continuous system such as a sewer, pre-entry testing is done to the extent feasible. If entry is authorized, conditions must be continuously monitored where the entrants are working. Gases can flow in from upstream at any time, so a single test is not enough. Odors are unreliable because H2S deadens the sense of smell, and ventilation never replaces testing.

    Reference: 29 CFR 1910.146 (Permit-Required Confined Spaces), 29 CFR 1910.146(d)(5)(i)

Sources

Questions last verified October 21, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.