Requirements at a glance
| Agency | Your Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license |
|---|---|
| Where it is used | St. Louis County (589 Residential HVAC Service/Installer). Commercial HVAC (588) is a separate exam we do not cover |
| Exam | 589: 100 questions, 5 hours |
| Books allowed | 2015 IMC and IFGC, Modern Refrigeration and Air Conditioning (19th ed.), SMACNA duct standards (3rd ed.), Practical Problems in Mathematics for Heating and Cooling Technicians (6th ed.), Modern Hydronic Heating (3rd ed.) and the St. Louis County Mechanical Code (Chapter 1108) |
| Fees | $100 per ICC exam through Pearson VUE (county bulletin), plus county license fees |
HVAC service technicians and installers applying for a residential HVAC license in St. Louis County.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Apply to the city first
Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Register for the St. Louis County residential HVAC exam with ICC and Pearson VUE
Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Pass with your books
The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
How to prepare
- Study the edition the exam is built on (listed above), not the newer code your city may enforce.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- Air distribution, gas furnaces and piping, and air conditioning are 15% each. Hydronic piping and boilers add 22%.
- Local licensing law (5%) and local mechanical amendments (10%) come from the county's Chapter 1108, a free download from stlouiscountymo.gov. Read it; our questions on these two topics are general.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2015 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2015 International Mechanical Code (IMC)Essential
Allowed in the exam room. St. Louis County's HVAC exam is built on the 2015 edition with county amendments (Chapter 1108).
2015 International Fuel Gas Code (IFGC)
Allowed in the exam room. Gas furnaces and piping, venting and combustion air.
Modern Refrigeration and Air Conditioning, 19th ed. (2014)
Allowed in the exam room. Refrigeration equipment and air conditioning questions.
Modern Hydronic Heating, 3rd ed.
Allowed in the exam room. Hydronic piping and boilers.
Official reference list (as published by the testing agency)
- 2015 International Mechanical Code (IMC) (allowed in the exam room)
- 2015 International Fuel Gas Code (IFGC) (allowed in the exam room)
- 2014 Modern Refrigeration and Air Conditioning, 19th ed.
- SMACNA HVAC Duct Construction and Standards, 3rd ed.
- Practical Problems in Mathematics for Heating and Cooling Technicians, 6th ed.
- Modern Hydronic Heating, 3rd ed.
- St. Louis County Public Works and Building Regulations Mechanical Code, Chapter 1108 (free download from stlouiscountymo.gov)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Local Licensing Law | 5 | |
| Local Mechanical Amendments | 10 | |
| Applied Math | 6 | |
| Air Distribution | 15 | |
| Gas Furnaces and Piping | 15 | |
| Piping in HVAC Systems | 12 | |
| Refrigeration Equipment | 12 | |
| Air Conditioning | 15 | |
| Boilers | 10 |
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for St. Louis County.
- Fee: $100 to ICC through Pearson VUE (ICC St. Louis County bulletin). County license fees are separate.
- 100 multiple-choice questions in 5 hours; passing score not published (75% used as practice target).
- Open book. St. Louis County mechanical trades are tested by ICC through Pearson VUE; its plumbing and pipefitter trades use IAPMO exams that we do not cover.
- Our local licensing and local amendment questions stay general because the county Chapter 1108 text was not available to us. Read Chapter 1108 yourself before the exam.
Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.
Frequently asked questions
What's on the St. Louis County residential HVAC exam?
100 questions: air distribution, gas furnaces and piping, and air conditioning 15% each, piping in HVAC systems and refrigeration equipment 12% each, local mechanical amendments 10%, boilers 10%, applied math 6% and local licensing law 5%.
Which books does it use?
The 2015 IMC and IFGC, Modern Refrigeration and Air Conditioning (19th ed.), SMACNA duct standards, a heating and cooling math text, Modern Hydronic Heating and the county's Chapter 1108 mechanical code.
How much is the exam?
The ICC bulletin lists $100 through Pearson VUE for St. Louis County exams.
Free questions with answers
Show all 10 free questions and answers
A technician installs a new gas furnace on a 1/2 psig system. Under the fuel gas code, what is the minimum test pressure for new piping that will operate at that working pressure?
Answer: 3 psig
The test pressure must be at least 1-1/2 times the maximum working pressure, but never less than 3 psig regardless of design pressure. 1.5 x 0.5 = 0.75 psig, which is below the floor, so 3 psig governs.
Reference: 2015 International Fuel Gas Code, Section 406.4.1
A gas piping system in a single-family dwelling is being pressure tested with a mechanical dial gauge. The test pressure will be 3 psig. What is the highest scale end a gauge may have for this test?
Answer: 15 psig
Mechanical gauges must have a range whose highest end is not greater than five times the test pressure. 5 x 3 psig = 15 psig. The code allows a manometer or a calibrated pressure-measuring device, and the pressure source must be isolated before the test.
Reference: 2015 International Fuel Gas Code, Section 406.4
An installer seals the longitudinal seams and connections of a metal supply trunk with pressure-sensitive tape. How must that tape be marked to comply with the mechanical code?
Answer: 181 B-FX, showing compliance with UL 181B
Tapes and mastics for metallic and flexible ducts must comply with UL 181B: pressure-sensitive tape is marked 181 B-FX and mastic is marked 181 B-M. The 181 A markings (A-P, A-M, A-H) are for fibrous glass ductwork. Duct connections to equipment flanges must also be sealed and mechanically fastened.
Reference: 2015 International Mechanical Code, Section 603.9
A furnace has an input of 100,000 Btu/h and an 80 percent efficiency. It moves 1,200 cfm. Using Q = 1.08 x cfm x temperature rise, what is the approximate air temperature rise?
Answer: 62 degrees F
Output = 100,000 x 0.80 = 80,000 Btu/h. Temperature rise = 80,000 / (1.08 x 1,200) = 80,000 / 1,296 = 61.7, or about 62 degrees F. Using the 100,000 Btu/h input gives 77 degrees F, assuming 90 percent efficiency gives 69, and using 1.35 as the air factor gives 49.
Reference: General HVAC math practice: furnace output and temperature rise, Sensible heat equation, Q = 1.08 x cfm x TD
A residential hot-water baseboard system has a maximum design pressure of 30 psi. What minimum hydrostatic test pressure does the mechanical code require?
Answer: 100 psi
The test is 1-1/2 times the maximum system design pressure, but never less than 100 psi, held for at least 15 minutes. 1.5 x 30 = 45 psi, which is less than 100, so the 100 psi minimum applies. 30 psi is the design pressure itself and 60 psi is twice it; neither is the code rule.
Reference: 2015 International Mechanical Code, Section 1208.1
A boiler's nameplate shows a maximum working pressure of 30 psi. Which relief valve setting complies with the mechanical code?
Answer: A valve set at not more than 30 psi, with listed and labeled capacity for the boiler
Safety and safety relief valves must be listed and labeled, have at least the rated capacity of the equipment, and be set at not more than the nameplate pressure rating of the boiler. Hot water boilers use a safety relief valve and steam boilers a safety valve.
Reference: 2015 International Mechanical Code, Sections 1006.2 and 1006.4
A technician measures a suction line temperature of 55 degrees F at the evaporator outlet. The suction pressure converts to a saturation temperature of 40 degrees F on the pressure-temperature chart. What is the superheat?
Answer: 15 degrees F
Superheat = actual suction line temperature minus the saturation temperature at the measured suction pressure: 55 - 40 = 15 degrees F. Adding the two gives 95, and 40 is just the saturation temperature. Superheat shows how far the vapor has been heated above its boiling point, whether the coil is fed correctly, and whether the compressor is protected from liquid.
Reference: General refrigeration practice (Modern Refrigeration and Air Conditioning, 19th ed.), Superheat = suction line temperature minus saturation temperature
An air handler is installed in an attic that is reached by a passageway. Which passageway dimensions meet the mechanical code for the standard case?
Answer: At least 30 inches high and 22 inches wide, not more than 20 feet long, with solid flooring 24 inches wide
The attic passageway must be at least 30 inches high and 22 inches wide and not more than 20 feet long (measured along the centerline from the opening to the appliance), with continuous solid flooring at least 24 inches wide and a level 30 by 30 inch service space at the appliance. A taller passageway (6 feet high and 22 inches wide) may run up to 50 feet.
Reference: 2015 International Mechanical Code, Section 306.3
Under the model mechanical code's administrative chapter, who is responsible for scheduling the required inspections of permitted mechanical work?
Answer: The permit holder, who must notify the code official when work is ready
The permit holder or the permit holder's authorized agent is responsible for scheduling inspections and notifying the code official when work is ready, and must provide access and the means for the inspection. Work may not be concealed beyond an inspection point without approval.
Reference: 2015 International Mechanical Code, Sections 107.2 and 107.2.2
Where must the permit or a copy of it be kept during the work?
Answer: On the site of the work until the project is complete
The permit, or a copy, must be kept on the site of the work until completion. One set of approved construction documents is also returned to the applicant and must be kept on the job during the work.
Reference: 2015 International Mechanical Code, Section 106.4.8
Sources
- ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.