Requirements at a glance
| Agency | Your Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license |
|---|---|
| Where it is used | Kansas City (G29), Springfield and Columbia (W29); Independence accepts ICC master mechanical scores of 75%+ from the last 5 years |
| Exam | G29 / W29: 100 questions, 4 hours |
| Books allowed | 2018 International Mechanical Code and 2018 International Fuel Gas Code (Springfield W29 also lists the 2017 NEC) |
| Fees | $115 per ICC exam through Pearson VUE, plus your city's license fees |
HVAC and mechanical contractors applying for a master mechanical or pipe fitter certificate in Kansas City, Springfield or Columbia, or in a city such as Independence that accepts ICC master mechanical scores.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Apply to the city first
Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Register for the master mechanical exam with ICC and Pearson VUE
Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Pass with your books
The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
How to prepare
- Study the edition the exam is built on (listed above), not the newer code your city may enforce.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- Administration and general regulations (30%) and appliances and mechanical equipment (27%) are over half the exam: IMC Chapters 1, 3, 9, 10 and 11.
- Fuel supply (6%) and combustion air (6%) come from IFGC Chapters 4 and 3 and IMC Chapter 7.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Mechanical Code (IMC)Essential
Allowed in the exam room. The core of the mechanical exams: appliances, ducts, exhaust, combustion air and venting.
2018 International Fuel Gas Code (IFGC)
Allowed in the exam room. Gas piping, sizing tables, combustion air, appliance venting and installation.
Official reference list (as published by the testing agency)
- 2018 International Mechanical Code (IMC) (allowed in the exam room)
- 2018 International Fuel Gas Code (IFGC) (allowed in the exam room)
- 2017 National Electrical Code (NEC), listed for the Springfield W29 exam (allowed in the exam room)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 30 | |
| Appliances and Mechanical Equipment | 27 | |
| Exhaust and Ventilation Systems | 11 | |
| Duct Systems | 12 | |
| Combustion Air | 6 | |
| Chimneys and Vents | 8 | |
| Fuel Supply Systems | 6 |
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for Missouri cities and counties.
- Fee: $115 to ICC through Pearson VUE per exam (ICC bulletins for Kansas City and Springfield). Your city's license fees are separate.
- 100 multiple-choice questions in 4 hours; passing score not published (75% used as practice target).
- Open book: bring the approved references listed for the exam. Questions are four-option multiple choice with no penalty for guessing.
- Missouri has no statewide plumbing, HVAC or general contractor license. Each city or county names the exams it accepts and issues the license. Apply to the city first; once it approves you, schedule the ICC exam with Pearson VUE.
- If you fail, wait 10 days to retake (ICC bulletin).
Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.
Frequently asked questions
What's on the Missouri master mechanical exam?
100 questions by weight: administration and general regulations 30%, appliances and mechanical equipment 27%, duct systems 12%, exhaust and ventilation 11%, chimneys and vents 8%, combustion air 6% and fuel supply systems 6%.
Which code books does it use?
The 2018 International Mechanical Code and the 2018 International Fuel Gas Code. The Springfield W29 outline also lists the 2017 NEC.
Which cities use it?
Kansas City lists it as G29 and Springfield and Columbia as W29, all through ICC and Pearson VUE. Independence accepts ICC master mechanical scores of 75% or higher from the last 5 years. Confirm with the city where you will work.
Free questions with answers
Show all 10 free questions and answers
Work under a mechanical permit began in January and was then suspended for about seven months (roughly 210 days) while the owner arranged financing. The original construction documents have not changed and the suspension has not exceeded one year. What does the IMC require before work restarts?
Answer: A new permit, at a fee of one-half the amount required for a new permit
Under Section 106.4.3 a permit becomes null and void when work is suspended or abandoned for 180 days after it starts. A new permit is then needed, but the fee is one-half of a new permit when the documents are unchanged and the suspension did not exceed one year. The double fee in Section 106.5.1 applies to starting work without any permit.
Reference: 2018 International Mechanical Code, Section 106.4.3
A gas water heater with a burner ignition source is installed in a private residential garage, and it is not protected from vehicle impact. What is the minimum clearance required between the appliance and the floor?
Answer: 6 feet
Section 304.7 requires appliances in private garages and carports to be installed with a minimum clearance of 6 feet above the floor, unless they are protected from motor vehicle impact and installed in accordance with Section 304.3. The 18 inch figure is the ignition source height under Section 304.3.
Reference: 2018 International Mechanical Code, Section 304.7
A boiler has a fuel input rating of 15,000,000 Btu/h. Which standard does Section 1004.1 name for the controls and safety devices on a boiler of that size?
Answer: NFPA 85
Section 1004.1 requires controls and safety devices on boilers with inputs of 12,500,000 Btu/h or less to meet ASME CSD-1, and on boilers with inputs greater than 12,500,000 Btu/h to meet NFPA 85. UL 726 covers packaged oil-fired boilers and NFPA 31 covers oil-burning equipment installation.
Reference: 2018 International Mechanical Code, Section 1004.1
A 650-square-foot meeting room will be ventilated by natural means only, through windows and doors to the outdoors. What minimum openable area to the outdoors does the IMC require?
Answer: 26 square feet
Section 402.2 requires a minimum openable area to the outdoors of 4 percent of the floor area being ventilated: 650 x 0.04 = 26 square feet. The other values come from using 1, 5 or 8 percent, none of which is the natural ventilation percentage.
Reference: 2018 International Mechanical Code, Section 402.2
A conference room has a breathing zone outdoor airflow Vbz of 372 cfm. The system uses a ceiling supply of warm air (supply air 20 degrees F above space temperature) with a ceiling return, for which Table 403.3.1.1.1.2 gives a zone air distribution effectiveness Ez of 0.8. What zone outdoor airflow Voz = Vbz / Ez is required?
Answer: 465 cfm
Equation 4-2 in Section 403.3.1.1.1.3 divides the breathing zone airflow by the effectiveness: 372 / 0.8 = 465 cfm. Multiplying instead of dividing gives 298 cfm, ignoring Ez gives 372 cfm, and 744 cfm would require an Ez of 0.5, which applies to makeup air drawn in near the exhaust.
Reference: 2018 International Mechanical Code, Section 403.3.1.1.1.3, Table 403.3.1.1.1.2
A galvanized supply duct without an approved protective coating will run 40 feet under a slab. Using the minimum slope in Section 603.8.1, how much total drop toward the drain point must the duct have, and how much concrete must encase it?
Answer: 5 inches of drop, with at least 2 inches of concrete encasement
Section 603.8 requires metallic ducts without an approved coating to be completely encased in at least 2 inches of concrete, and Section 603.8.1 requires a slope of at least 1/8 inch per foot toward a drain point with access. 40 ft x 1/8 in/ft = 5 inches. Ducts must be sealed and leak tested before encasement.
Reference: 2018 International Mechanical Code, Sections 603.8 and 603.8.1
A chilled-air supply duct is externally insulated with a material that is not itself a vapor retarder. What must cover the insulation under Section 604.11?
Answer: Vapor retarder of 0.05 perm or less, or foil at least 2 mils thick
Section 604.11 requires externally insulated cooling ducts to be covered with a vapor retarder having a maximum permeance of 0.05 perm, or aluminum foil at least 2 mils thick, with joints and seams sealed. Insulations that are themselves 0.05 perm or less need no covering.
Reference: 2018 International Mechanical Code, Section 604.11
All combustion air for a mechanically vented boiler room with 300,000 Btu/h total input is supplied by a mechanical air supply system from the outdoors. What minimum supply rate does IFGC Section 304.9 require?
Answer: 105 cfm
Section 304.9 requires the combustion air supplied from outdoors at not less than 0.35 cfm per 1,000 Btu/h of total input: 300 x 0.35 = 105 cfm. The appliances must also be interlocked so the main burner cannot operate when the supply system is off.
Reference: 2018 International Fuel Gas Code, Section 304.9
A Category I appliance is connected to a chimney that is 24 feet tall. What maximum horizontal length may a single-wall vent connector and a Type B double-wall connector have under IFGC Section 503.10.8?
Answer: 18 feet for single-wall and 24 feet for Type B double-wall
Section 503.10.8 limits the horizontal length of a single-wall connector to 75 percent of the chimney or vent height (0.75 x 24 = 18 feet) and a Type B double-wall connector to 100 percent of the height (24 feet), except for engineered systems.
Reference: 2018 International Fuel Gas Code, Section 503.10.8
A gas piping system in a restaurant, not a single-family dwelling, has a pipe volume of 700 cubic feet. What is the minimum test duration under IFGC Section 406.4.2?
Answer: 1 hour
Section 406.4.2 requires a test duration of not less than 1/2 hour for each 500 cubic feet of pipe volume or fraction thereof. 700 cubic feet is 2 increments (500 + the 200 fraction), so 2 x 1/2 hour = 1 hour. The 10-minute minimum is only for systems under 10 cubic feet or in a single-family dwelling.
Reference: 2018 International Fuel Gas Code, Section 406.4.2
Sources
- ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.