Requirements at a glance
| Agency | Your Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license |
|---|---|
| Where it is used | Springfield (W31) |
| Exam | W31: 50 questions, 3 hours |
| Books allowed | 2018 International Mechanical Code, 2018 International Fuel Gas Code and 2017 NEC |
| Fees | $115 per ICC exam through Pearson VUE, plus your city's license fees |
HVAC and mechanical workers applying for a journeyman mechanical license in Springfield, or in a Missouri city that accepts the ICC journeyman mechanical exam.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Apply to the city first
Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Register for the journeyman mechanical exam with ICC and Pearson VUE
Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Pass with your books
The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
How to prepare
- Study the edition the exam is built on (listed above), not the newer code your city may enforce.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- Administration (22%) and appliances and mechanical equipment (22%) lead: IMC Chapter 1, Chapter 3 and Chapter 9 (specific appliances).
- Duct systems (16%) and exhaust and ventilation (14%) come from IMC Chapters 4 through 6.
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IMC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Mechanical Code (IMC)Essential
Allowed in the exam room. The core of the mechanical exams: appliances, ducts, exhaust, combustion air and venting.
2018 International Fuel Gas Code (IFGC)
Allowed in the exam room. Gas piping, sizing tables, combustion air, appliance venting and installation.
Official reference list (as published by the testing agency)
- 2018 International Mechanical Code (IMC) (allowed in the exam room)
- 2018 International Fuel Gas Code (IFGC) (allowed in the exam room)
- 2017 National Electrical Code (NEC) (allowed in the exam room)
What's on the exam
Official content outline from International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):
| Topic | Questions | |
|---|---|---|
| Administration and General Regulations | 22 | |
| Appliances and Mechanical Equipment | 22 | |
| Exhaust and Ventilation Systems | 14 | |
| Duct Systems | 16 | |
| Combustion Air | 8 | |
| Chimneys and Vents | 10 | |
| Fuel Supply Systems | 8 |
The outline totals 100; the other items on the 50-question exam are unscored or unassigned.
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for Missouri cities and counties.
- Fee: $115 to ICC through Pearson VUE per exam (ICC bulletins for Kansas City and Springfield). Your city's license fees are separate.
- 50 multiple-choice questions in 3 hours; passing score not published (75% used as practice target).
- Open book: bring the approved references listed for the exam. Questions are four-option multiple choice with no penalty for guessing.
- Missouri has no statewide plumbing, HVAC or general contractor license. Each city or county names the exams it accepts and issues the license. Apply to the city first; once it approves you, schedule the ICC exam with Pearson VUE.
- If you fail, wait 10 days to retake (ICC bulletin).
Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.
Frequently asked questions
What's on the Missouri journeyman mechanical exam?
50 questions by weight: administration and general regulations 22%, appliances and mechanical equipment 22%, duct systems 16%, exhaust and ventilation 14%, chimneys and vents 10%, combustion air 8% and fuel supply systems 8%.
Which code books does it use?
The 2018 International Mechanical Code, the 2018 International Fuel Gas Code and the 2017 NEC.
Who gives the exam?
ICC, through Pearson VUE. Springfield Building Development Services approves your license application before you schedule.
Free questions with answers
Show all 10 free questions and answers
A contractor's usual mechanical permit fee for a boiler replacement is $240. The contractor started the work two days before applying, and there was no emergency. Under IMC Section 106.5.1, what total permit charge applies?
Answer: $480, which is the usual fee plus 100 percent of the usual fee
Section 106.5.1 says work started before the permit is obtained is subject to 100 percent of the usual permit fee in addition to the required fees: $240 + $240 = $480. Only the emergency exception in 106.1 lets the application follow the work, and then only by the next working business day.
Reference: 2018 International Mechanical Code, Section 106.5.1
A vented wall furnace is to be mounted beside a door. Under IMC Section 909.3, what is the minimum distance from the swing of the door to an air inlet or outlet of the furnace, and may a doorstop be used to obtain it?
Answer: 12 inches, and no doorstop or closer may be used to get it
Section 909.3 requires that a door cannot swing within 12 inches of a wall furnace air inlet or outlet, measured at right angles to the opening, and prohibits doorstops or closers to obtain that clearance. The furnace must be moved, or the door relocated or rehung.
Reference: 2018 International Mechanical Code, Section 909.3
A cooling tower is being located on a roof near an outdoor-air intake serving the same building. Under IMC Section 908.3, how must the plume discharge be separated from any ventilation inlet to a building?
Answer: At least 5 feet above or 20 feet away from the inlet
Section 908.3 requires cooling tower, evaporative condenser and fluid cooler plume discharges to be at least 5 feet above or 20 feet away from any ventilation inlet to a building so vapor does not enter occupied spaces. The other combinations mix up the two numbers.
Reference: 2018 International Mechanical Code, Section 908.3
A designer places an outdoor air intake for an office building near a loading dock where trucks idle. Under IMC Section 401.4, how far horizontally must the intake be from a hazardous or noxious contaminant source such as a loading dock, street or vent (general rule)?
Answer: At least 10 feet
Section 401.4 requires intake openings at least 10 feet horizontally from hazardous or noxious contaminant sources such as vents, streets, alleys, parking lots and loading docks. Where a source is within 10 feet, the intake must also be at least 3 feet below it. Intakes must also be 10 feet from lot lines or other buildings on the same lot.
Reference: 2018 International Mechanical Code, Section 401.4
A domestic dryer has no manufacturer length data. Its exhaust duct has one 4-inch radius mitered 90-degree elbow and two 4-inch radius mitered 45-degree elbows. Using IMC Section 504.8.4.1 and Table 504.8.4.1, what is the longest straight duct allowed?
Answer: 25 feet
The maximum duct length is 35 feet reduced by the equivalent length of fittings. A 90-degree mitered elbow is 5 feet and each 45-degree mitered elbow is 2 feet 6 inches: 5 + 2.5 + 2.5 = 10 feet. 35 - 10 = 25 feet. 30 feet ignores the two 45s; 27 feet 6 inches counts only one 45; 32 feet 6 inches counts only one 45 and no 90.
Reference: 2018 International Mechanical Code, Section 504.8.4.1, Table 504.8.4.1
A return air grille is planned for a basement room that also contains a gas water heater with a draft hood. Under IMC Section 601.5, how far must the return opening be from the draft hood, measured in any direction?
Answer: At least 10 feet
Section 601.5 requires return air openings to be at least 10 feet, measured in any direction, from an open combustion chamber or draft hood of another appliance in the same room. A closer opening could pull flue gases into the return system.
Reference: 2018 International Mechanical Code, Section 601.5
A designer proposes to use the stud cavity of an interior partition as part of a ducted system. Which use is prohibited by IMC Section 602.3?
Answer: Using the stud cavity as a plenum for supply air
Section 602.3 says stud wall cavities and joist spaces may not be used as a plenum for supply air. They also may not be part of a fire-resistance-rated assembly, convey air from more than one floor level, or be in outside walls of the building envelope, and they need fireblocking and floor penetration protection.
Reference: 2018 International Mechanical Code, Section 602.3
An exterior combustion air intake opening is installed in a wall. Under IFGC Section 304.11, how far above the adjoining finished ground level must the lowest side of the opening be?
Answer: At least 12 inches
Section 304.11 requires combustion air intake openings on the exterior of a building to have the lowest side not less than 12 inches vertically from the adjoining finished ground level, so snow, soil or debris does not block them.
Reference: 2018 International Fuel Gas Code, Section 304.11
A 4-inch Type B gas vent with a listed cap passes through a roof with a 10/12 pitch. The vent is 9 feet from the nearest vertical wall. Using IFGC Section 503.6.5 and the roof-slope table in Figure 503.6.5, what is the minimum height of the vent above the roof?
Answer: 2.5 feet
The vent is 12 inches or less in size and at least 8 feet from the wall, so the height comes from the Figure 503.6.5 table. A 10/12 pitch falls in the 'over 9/12 to 10/12' row, which gives 2.5 feet. The next row (over 10/12 to 11/12) gives 3.25 feet, 2.0 feet is the row for over 8/12 to 9/12, and 1.0 foot is for flat to 6/12.
Reference: 2018 International Fuel Gas Code, Section 503.6.5, Figure 503.6.5
A buried gas line runs underground from the house to a gas post light in the yard. The installation is approved and the line is not in a location susceptible to physical damage. Under IFGC Section 404.12.1, what is the minimum burial depth below finished grade?
Answer: 8 inches
Section 404.12 requires underground piping to be at least 12 inches below grade, except Section 404.12.1, which allows individual lines to outdoor lights, grills and other outdoor appliances at 8 inches when approved and not susceptible to physical damage.
Reference: 2018 International Fuel Gas Code, Sections 404.12 and 404.12.1
Sources
- ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.