Requirements at a glance
| Agency | Your Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license |
|---|---|
| Where it is used | Springfield (W24 Master Plumber, no gas section) |
| Exam | W24: 100 questions, 4 hours |
| Books allowed | 2018 International Plumbing Code |
| Fees | $115 per ICC exam through Pearson VUE, plus your city's license fees |
Plumbers applying for a master plumber license from Springfield Building Development Services.
Official links
How to get licensed, step by step
Ask your city or county which exam it accepts
Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Apply to the city first
Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
Register for the Springfield master plumber exam with ICC and Pearson VUE
Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.
Pass with your books
The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.
ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
How to prepare
- Study the edition the exam is built on (listed above), not the newer code your city may enforce.
- The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
- Administration and general regulations (about 46%) cover IPC Chapter 1, definitions, plan reading, testing and materials. Learn where each is in the book.
- Tab the drainage, vent and water pipe sizing tables (IPC Chapters 6, 7 and 9).
- Start with the free questions above to find your weak topics, then drill those first.
- Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
- Read every explanation, including for questions you got right, and look the section up in your own book.
Books for this exam
This is an open-book exam: you can bring the references below, and most questions come from the 2018 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.
2018 International Plumbing Code (IPC)Essential
Allowed in the exam room. Most of the Springfield and Kansas City (G27) plumbing exams.
Official reference list (as published by the testing agency)
- 2018 International Plumbing Code (IPC) (allowed in the exam room)
What's on the exam
Estimated topic weighting. No official breakdown is published:
| Topic | Questions | |
|---|---|---|
| Administration General Regulations | 46 | |
| Plumbing Fixtures | 14 | |
| Water Supply and Distribution | 11 | |
| Sanitary Drainage | 11 | |
| Plumbing Vent Requirements | 8 | |
| Traps, Interceptors, and Separators | 8 | |
| Storm Drainage | 2 |
Exam day details
- Administered by International Code Council (ICC), delivered by Pearson VUE, for Missouri cities and counties.
- Fee: $115 to ICC through Pearson VUE per exam (ICC bulletins for Kansas City and Springfield). Your city's license fees are separate.
- 100 multiple-choice questions in 4 hours; passing score not published (75% used as practice target).
- Open book: bring the approved references listed for the exam. Questions are four-option multiple choice with no penalty for guessing.
- Missouri has no statewide plumbing, HVAC or general contractor license. Each city or county names the exams it accepts and issues the license. Apply to the city first; once it approves you, schedule the ICC exam with Pearson VUE.
- If you fail, wait 10 days to retake (ICC bulletin).
Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.
Frequently asked questions
What's on the Springfield master plumber exam?
100 questions on the 2018 IPC: administration and general regulations about 46%, fixtures 14%, water supply and sanitary drainage 11% each, vents and traps 8% each and storm drainage 2%. The weights are matched to topics by order in the ICC text, so treat them as approximate.
Does it include gas piping?
No. Unlike the Kansas City G27 exam, the Springfield W24 exam lists only the 2018 IPC.
Where do I apply?
Springfield Building Development Services, 840 Boonville Avenue, phone 417-864-2059, approves your application before you schedule the exam.
Free questions with answers
Show all 10 free questions and answers
A plumber finishes a water distribution system and wants to test it with air instead of water. Under Section 312.5, which completed system may be proved tight with a 50 psi air test held for 15 minutes?
Answer: A system of copper tube
Section 312.5 permits a water test at not less than working pressure or, for piping systems other than plastic, an air test of at least 50 psi held for at least 15 minutes. Copper is a metallic system, so it qualifies. CPVC, PEX and polypropylene are all plastic and must be water tested.
Reference: 2018 International Plumbing Code, Section 312.5
A trench for a 4-inch building drain has soft, poor-quality soil at the bottom. Under Section 306.2.3, how deep must the plumber overexcavate before bedding the pipe?
Answer: At least 8 inches (two pipe diameters), then backfill to pipe level with fine gravel, crushed stone or concrete
Section 306.2.3 requires stabilization of soft materials by overexcavating not less than two pipe diameters and backfilling to the pipe installation level with fine gravel, crushed stone or a concrete foundation bedded with tamped sand: 2 x 4 inches = 8 inches. The 3-inch figure is the rock removal rule in Section 306.2.2.
Reference: 2018 International Plumbing Code, Section 306.2.3
A plumber wants to join ABS drain pipe to PVC drain pipe with a solvent-cement joint. Under Sections 707.1 and 705.16.4, where is such a joint permitted?
Answer: Only as a single joint at the end of the building drain and start of the building sewer, using ASTM D3138 cement
Section 707.1 prohibits solvent-cement joints between different types of plastic pipe except where provided for in Section 705.16.4. That section allows a solvent-cement joint only where a single joint is made between ABS and PVC at the end of a building drainage pipe and the beginning of a building sewer pipe, using cement complying with ASTM D3138. Elsewhere, different plastics are joined with an approved adapter fitting.
Reference: 2018 International Plumbing Code, Sections 707.1 and 705.16.4
A new lavatory will be set in front of a wall across a small powder room. Under Section 405.3.1, what is the minimum clear distance required in front of the lavatory to the wall, fixture or door?
Answer: 21 inches
Section 405.3.1 requires not less than 21 inches of clearance in front of a water closet, urinal, lavatory or bidet to any wall, fixture or door. The 15-inch dimension is the center-to-side-wall distance, and 30 inches is the center-to-center spacing of adjacent fixtures.
Reference: 2018 International Plumbing Code, Section 405.3.1
A stall is framed for a floor-mounted water closet in a public restroom. Under Section 405.3.1, what are the minimum inside dimensions of the water closet compartment?
Answer: 30 inches wide and 60 inches deep
Section 405.3.1 requires water closet compartments to be at least 30 inches wide and at least 60 inches deep for floor-mounted water closets, and at least 30 inches wide and 56 inches deep for wall-hung water closets.
Reference: 2018 International Plumbing Code, Section 405.3.1
Static water pressure at the entrance of a building is measured at 92 psi. What does Section 604.8 require for the building water distribution piping?
Answer: A pressure-reducing valve with a strainer that limits static pressure to 80 psi
Section 604.8 requires an approved pressure-reducing valve with strainer where static pressure in a building exceeds 80 psi, reducing it to not more than 80 psi. Exceptions cover service lines to sill cocks and outside hydrants, and main risers where pressure is reduced to 80 psi or less at individual fixtures.
Reference: 2018 International Plumbing Code, Section 604.8
A kitchen faucet that has an effective opening of 3/4 inch discharges close to a wall into a sink. Using Table 608.16.1, what is the minimum air gap above the flood level rim?
Answer: 2-1/2 inches
Table 608.16.1 lists sinks, laundry trays, gooseneck faucets and other fixtures with effective openings of 3/4 inch or less at 1-1/2 inches away from a wall and 2-1/2 inches close to a wall. The 1-1/2 inch value applies only away from a wall.
Reference: 2018 International Plumbing Code, Table 608.16.1
A floor drain with a 3-inch trap is sloped at 1/8 inch per foot. Using Table 909.1, what is the greatest developed length allowed from the trap weir to the vent?
Answer: 12 feet
Table 909.1 allows a 3-inch trap at 1/8 inch per foot a maximum distance of 12 feet from the vent. The 16-foot value belongs to a 4-inch trap and 8 feet to a 2-inch trap at 1/4 inch per foot.
Reference: 2018 International Plumbing Code, Table 909.1
What depth of liquid seal must each fixture trap have under Section 1002.4, excluding special designs for accessible fixtures?
Answer: At least 2 inches and not more than 4 inches
Section 1002.4 requires a liquid seal of not less than 2 inches and not more than 4 inches, or deeper for special designs relating to accessible fixtures.
Reference: 2018 International Plumbing Code, Section 1002.4
Where must a secondary (emergency overflow) roof drain system discharge under Section 1108.2?
Answer: Separately from the primary system, above grade, where occupants would notice it
Section 1108.2 requires the secondary roof drain system to have its end point of discharge separate from the primary system, above grade, in a location that would normally be observed by building occupants or maintenance personnel, so a blocked primary drain is noticed.
Reference: 2018 International Plumbing Code, Section 1108.2
Sources
- ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)
- Pearson VUE: ICC exams (opens in a new tab)
Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.