Missouri licensing exam

Missouri Master Plumber with Gas Exam (ICC G27/W27): Practice Test & Licensing Guide

The ICC Master Plumber with Gas exam used for Kansas City (G27) and Columbia (W27): 100 open-book questions on the 2018 IPC and 2018 IFGC. Passing score not printed in the bulletins.

Questions
100
Time limit
4 hours
Passing score
Not published by Missouri

Full practice test: $19One-time payment · 12 months of access

Try 10 free practice questions

No sign-up. Every answer explains the rule and tells you where to find it in your book.

Question 1 of 10Administration General Knowledge

A water supply system of copper tube has a working pressure of 80 psi. The inspector accepts a water test rather than an air test. What is the minimum water test pressure, and for how long is it held, under the 2018 IPC?

Requirements at a glance

AgencyYour Missouri city or county licenses you; the International Code Council (ICC) gives the exam through Pearson VUE. There is no statewide plumbing, HVAC or general contractor license
Where it is usedKansas City (G27) and Columbia (W27); Independence accepts ICC master plumber scores of 75%+ from the last 5 years
ExamG27 / W27: 100 questions, 4 hours
Books allowed2018 International Plumbing Code and 2018 International Fuel Gas Code
Fees$115 per ICC exam through Pearson VUE, plus your city's license fees

Plumbers applying for a master plumber certificate in Kansas City or Columbia, or in a city such as Independence that accepts ICC master plumber scores.

How to get licensed, step by step

  1. Ask your city or county which exam it accepts

    Missouri cities and counties set their own licenses and exams. Confirm the exam, the experience rules and any local code amendments before you pay. Kansas City amendments, fees and rules are not verified on this site.

    ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)

  2. Apply to the city first

    Springfield's ICC bulletin says to make your license application to Building Development Services before you schedule; wait for its approval, then register for the exam.

    ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)

  3. Register for the master plumber with gas exam with ICC and Pearson VUE

    Create an account, find the exam in the ICC Exam Catalog and schedule a Pearson VUE appointment. If you fail, wait 10 days to retake.

    Schedule with Pearson VUE (ICC exams) (opens in a new tab)

  4. Pass with your books

    The exam is open book with four-option multiple choice and no penalty for guessing. The ICC bulletins print no passing score, so check the Exam Catalog; 75% is the usual ICC trade standard.

    ICC: Contractor/Trades exam catalog (outlines, references, passing score) (opens in a new tab)

How to prepare

  • Study the edition the exam is built on (listed above), not the newer code your city may enforce.
  • The exam is open book, but there is not time to look up every answer. Tab your books by chapter and table before exam day.
  • Administration and general knowledge (36%) and gas piping (21%) are more than half the exam. Know IPC Chapter 1 permits and inspections cold.
  • Tab the drain, vent and water pipe sizing tables (Chapters 7, 9, 6) and the IFGC Chapter 4 sizing tables.
  • Start with the free questions above to find your weak topics, then drill those first.
  • Take at least two full timed simulations before exam day. Timing is where most people fail open-book exams.
  • Read every explanation, including for questions you got right, and look the section up in your own book.

Books for this exam

This is an open-book exam: you can bring the references below, and most questions come from the 2018 IPC. Tabs and highlighting are allowed. Free online copies are read-only and can't be used in the exam room.

  • 2018 International Plumbing Code (IPC)Essential

    Allowed in the exam room. Most of the Springfield and Kansas City (G27) plumbing exams.

    ICC store (opens in a new tab)

  • 2018 International Fuel Gas Code (IFGC)

    Allowed in the exam room. Gas piping, sizing tables, combustion air, appliance venting and installation.

    ICC store (opens in a new tab)

Official reference list (as published by the testing agency)
  • 2018 International Plumbing Code (IPC) (allowed in the exam room)
  • 2018 International Fuel Gas Code (IFGC) (allowed in the exam room)

What's on the exam

Official content outline from International Code Council (ICC), delivered by Pearson VUE, (number of questions per topic):

TopicQuestions
Administration General Knowledge36
Plumbing Fixtures13
Water Supply and Distribution9
Sanitary Drainage8
Plumbing Vent Requirements6
Traps, Interceptors, and Separators5
Storm Drainage2
Gas Piping21

Exam day details

  • Administered by International Code Council (ICC), delivered by Pearson VUE, for Missouri cities and counties.
  • Fee: $115 to ICC through Pearson VUE per exam (ICC bulletins for Kansas City and Springfield). Your city's license fees are separate.
  • 100 multiple-choice questions in 4 hours; passing score not published (75% used as practice target).
  • Open book: bring the approved references listed for the exam. Questions are four-option multiple choice with no penalty for guessing.
  • Missouri has no statewide plumbing, HVAC or general contractor license. Each city or county names the exams it accepts and issues the license. Apply to the city first; once it approves you, schedule the ICC exam with Pearson VUE.
  • If you fail, wait 10 days to retake (ICC bulletin).

Note: The ICC bulletins for Missouri cities print no passing score: they send candidates to the ICC Exam Catalog on Pearson VUE. ICC's default is 70%, but jurisdictions may set it higher: older ICC bulletins required 75% for Columbia (2017) and St. Louis County (2018), and Independence accepts ICC scores of 75% or more. We use 75% as a practice target; confirm the passing score in the Exam Catalog before you test. Kansas City, Columbia and Lee's Summit publish their rules on sites we could not read, so check amendments, fees and experience rules with the city.

Frequently asked questions

What's on the Missouri master plumber exam with gas?

100 questions by weight: administration and general knowledge 36%, gas piping 21%, plumbing fixtures 13%, water supply and distribution 9%, sanitary drainage 8%, plumbing vents 6%, traps, interceptors and separators 5% and storm drainage 2%.

Which code books does it use?

The 2018 International Plumbing Code and the 2018 International Fuel Gas Code.

Is there a state plumbing license?

No. Plumbers are licensed by cities and counties. Kansas City and Columbia list this exam; St. Louis County uses IAPMO exams that we do not cover.

Free questions with answers

Show all 10 free questions and answers
  1. A water supply system of copper tube has a working pressure of 80 psi. The inspector accepts a water test rather than an air test. What is the minimum water test pressure, and for how long is it held, under the 2018 IPC?

    Answer: Not less than 80 psi, held not less than 15 minutes

    Section 312.5 requires a water test at not less than the working pressure of the system (80 psi here), held for not less than 15 minutes, using water from a potable source. The 50 psi figure is the minimum for the alternative AIR test on non-plastic piping; 120 psi is a 1.5 multiplier the code does not use.

    Reference: 2018 International Plumbing Code, Section 312.5

  2. Two water closets are set side by side in an open restroom with no partition between them. Under Section 405.3.1, what is the minimum center-to-center spacing?

    Answer: 30 inches

    Section 405.3.1 requires fixtures not separated by partitions or other obstructions to be at least 30 inches center to center. The 15-inch figure is the minimum from the fixture center to a side wall, partition or vanity.

    Reference: 2018 International Plumbing Code, Section 405.3.1

  3. A urinal is to be set next to a side partition in a public toilet room. Under Section 405.3.1, what is the minimum distance from the center of the urinal to the partition, and what clear space is needed in front of it?

    Answer: 15 inches to the partition, and 21 inches of clearance in front

    Section 405.3.1 says a water closet, urinal, lavatory or bidet may not be set closer than 15 inches from its center to any side wall, partition, vanity or other obstruction, and there must be not less than 21 inches of clearance in front to any wall, fixture or door.

    Reference: 2018 International Plumbing Code, Section 405.3.1

  4. A new water service pipe will cross a building sewer that is not made of a material listed in Table 702.2. Under Section 603.2, what allows the water service to be closer than 5 feet horizontally to the sewer at the crossing?

    Answer: The water service pipe is sleeved to a point at least 5 feet horizontally from the sewer

    Section 603.2 requires 5 feet of undisturbed or compacted earth between a water service and a building sewer that is not of a Table 702.2 material. The separation does not apply where the water service crosses the sewer and is sleeved to a point not less than 5 feet horizontally from the sewer centerline on both sides of the crossing. The section's other relief puts the water service at least 12 inches ABOVE the top of the sewer, not below it; plastic sheathing and concrete encasement are not named.

    Reference: 2018 International Plumbing Code, Section 603.2

  5. A 4-inch building drain has 6 inches of fall available between its upstream end and the building sewer. If it is laid at exactly the minimum slope allowed by Table 704.1, what is the longest run the 6 inches of fall will allow?

    Answer: 48 feet

    Table 704.1 sets the minimum slope for 3- to 6-inch pipe at 1/8 inch per foot. 6 inches / (1/8 inch per foot) = 48 feet. Using the 1/4 inch per foot rate for 2-1/2 inch and smaller pipe gives 24 feet, the 1/16 inch rate for 8-inch and larger pipe gives 96 feet, and 1/2 inch per foot gives 12 feet.

    Reference: 2018 International Plumbing Code, Table 704.1

  6. Where a vent pipe connects to a vent stack or stack vent, how high above the flood level rim of the highest fixture served must the connection be made, under Section 905.5?

    Answer: Not less than 6 inches

    Section 905.5 requires the connection between a vent pipe and a vent stack or stack vent to be at least 6 inches above the flood level rim of the highest fixture served, and horizontal branch, relief or loop vents to be at least 6 inches above that rim as well. Section 905.4 sets the same 6 inches for the vertical rise of a dry vent.

    Reference: 2018 International Plumbing Code, Section 905.5

  7. A fixture trap is located 20 inches below the fixture outlet and 32 inches horizontally from the centerline of the fixture outlet to the centerline of the trap inlet. Under Section 1002.1, why does it not comply?

    Answer: The horizontal distance exceeds the 30-inch maximum

    Section 1002.1 limits the vertical distance from the fixture outlet to the trap weir to 24 inches and the horizontal distance to 30 inches. 20 inches vertical is within the limit, but 32 inches horizontal exceeds 30 inches.

    Reference: 2018 International Plumbing Code, Section 1002.1

  8. A flat roof measures 30 feet by 50 feet. A vertical wall 15 feet wide and 10 feet high rises above the roof and diverts rainwater onto it. Under Section 1106.4, what area is used to size the storm drainage?

    Answer: 1,575 square feet

    Section 1106.4 adds one-half of the area of any vertical wall that diverts rainwater to the roof to the projected roof area. Roof: 30 x 50 = 1,500 sq ft. Wall: 15 x 10 = 150 sq ft, half is 75 sq ft. 1,500 + 75 = 1,575 sq ft. Adding the full wall area gives 1,650, and ignoring the wall gives 1,500.

    Reference: 2018 International Plumbing Code, Section 1106.4

  9. A new gas piping system inside a building will operate at a maximum working pressure of 4 psig. What is the minimum test pressure under Section 406.4.1 of the 2018 IFGC?

    Answer: 6 psig

    Section 406.4.1 requires a test pressure of not less than 1-1/2 times the proposed maximum working pressure, but not less than 3 psig, irrespective of design pressure. 4 x 1.5 = 6 psig. The 3 psig minimum applies only where 1.5 times the working pressure is less than 3 psig.

    Reference: 2018 International Fuel Gas Code, Section 406.4.1

  10. Which gas may NOT be used as the test medium for a fuel gas piping pressure test under Section 406.2 of the 2018 IFGC?

    Answer: Oxygen

    Section 406.2 says the test medium shall be air, nitrogen, carbon dioxide or an inert gas, and states that oxygen shall not be used as a test medium. Nitrogen, carbon dioxide and air are all named as acceptable.

    Reference: 2018 International Fuel Gas Code, Section 406.2

Sources

Questions last verified November 12, 2026. Licensing rules change. Always confirm current requirements with the licensing agency before you apply.